Conceptual design plans for the FY 1993 line items
Abstract
This Facilities Capability Assurance Program (FCAP) project provides for the design and construction of a reconfigured production facility(ies) for Mound`s non-nuclear weapons components. Existing buildings would be rehabilitated in order to locate final production/assembly areas within close proximity and in a facility suitable to operations of this nature. Ancillary operations will be located in nearby buildings, also rehabilitated, in order to provide support to final production with minimal handling and travel-time. Benefits of this reconfiguration include: reduced labor, space requirements, and product cycle time; maximum flexibility to accommodate new mission assignments without new buildings; restores existing manufacturing facilities to a condition that is conducive to state-of-the-art operations. This project is mound`s top priority project for FY93.
- Publication Date:
- Research Org.:
- EG and G Mound Applied Technologies, Miamisburg, OH (United States)
- Sponsoring Org.:
- USDOE, Washington, DC (United States)
- OSTI Identifier:
- 263008
- Report Number(s):
- MLM-MU-88-72-0002
ON: DE96013363; TRN: 96:004264
- DOE Contract Number:
- AC24-88DP43495
- Resource Type:
- Technical Report
- Resource Relation:
- Other Information: PBD: 22 Dec 1988
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 05 NUCLEAR FUELS; 45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEFENSE; MOUND LABORATORY; RADIOACTIVE WASTE FACILITIES; COOLING SYSTEMS; DESIGN; BUILDINGS; CONSTRUCTION; LABOR; DRAINAGE; TELEPHONES; TRITIUM; RADIOACTIVE WASTE PROCESSING
Citation Formats
NONE. Conceptual design plans for the FY 1993 line items. United States: N. p., 1988.
Web. doi:10.2172/263008.
NONE. Conceptual design plans for the FY 1993 line items. United States. doi:10.2172/263008.
NONE. Thu .
"Conceptual design plans for the FY 1993 line items". United States.
doi:10.2172/263008. https://www.osti.gov/servlets/purl/263008.
@article{osti_263008,
title = {Conceptual design plans for the FY 1993 line items},
author = {NONE},
abstractNote = {This Facilities Capability Assurance Program (FCAP) project provides for the design and construction of a reconfigured production facility(ies) for Mound`s non-nuclear weapons components. Existing buildings would be rehabilitated in order to locate final production/assembly areas within close proximity and in a facility suitable to operations of this nature. Ancillary operations will be located in nearby buildings, also rehabilitated, in order to provide support to final production with minimal handling and travel-time. Benefits of this reconfiguration include: reduced labor, space requirements, and product cycle time; maximum flexibility to accommodate new mission assignments without new buildings; restores existing manufacturing facilities to a condition that is conducive to state-of-the-art operations. This project is mound`s top priority project for FY93.},
doi = {10.2172/263008},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Thu Dec 22 00:00:00 EST 1988},
month = {Thu Dec 22 00:00:00 EST 1988}
}
-
The Test Area North Hot Shop Storage Pool contains 343 canisters of core debris from Three Mile Island, plus 13 fuel modules from the Loss-of-Fluid Test Reactor and a small number of commercial fuel rods and assemblies owned by the Department of Energy. The Dry Cask Storage Project will remove this fuel from the pool and place it in storage casks for retention until the proposed Federal Spent Fuel Repository'' is opened. This Conceptual Design Report and project proposal is a compilation of information for use in evaluating the Dry Cask Storage Project for Line Item funding and construction beginningmore »
-
Dry Cask Storage Project, conceptual design report and line item proposal for FY-1993
The Test Area North Hot Shop Storage Pool contains 343 canisters of core debris from Three Mile Island, plus 13 fuel modules from the Loss-of-Fluid Test Reactor and a small number of commercial fuel rods and assemblies owned by the Department of Energy. The Dry Cask Storage Project will remove this fuel from the pool and place it in storage casks for retention until the proposed Federal Spent Fuel Repository''is opened. This Conceptual Design Report and project proposal is a compilation of information for use in evaluating the Dry Cask Storage Project for Line Item funding and construction beginning inmore » -
Dry Cask Storage Project, conceptual design report and line item proposal for FY-1993. Volume 1
The Test Area North Hot Shop Storage Pool contains 343 canisters of core debris from Three Mile Island, plus 13 fuel modules from the Loss-of-Fluid Test Reactor and a small number of commercial fuel rods and assemblies owned by the Department of Energy. The Dry Cask Storage Project will remove this fuel from the pool and place it in storage casks for retention until the proposed ``Federal Spent Fuel Repository``is opened. This Conceptual Design Report and project proposal is a compilation of information for use in evaluating the Dry Cask Storage Project for Line Item funding and construction beginning inmore » -
Dry Cask Storage Project, conceptual design report and line item proposal for FY-1993. Volume 2, Appendices
The Test Area North Hot Shop Storage Pool contains 343 canisters of core debris from Three Mile Island, plus 13 fuel modules from the Loss-of-Fluid Test Reactor and a small number of commercial fuel rods and assemblies owned by the Department of Energy. The Dry Cask Storage Project will remove this fuel from the pool and place it in storage casks for retention until the proposed ``Federal Spent Fuel Repository`` is opened. This Conceptual Design Report and project proposal is a compilation of information for use in evaluating the Dry Cask Storage Project for Line Item funding and construction beginningmore » -
Conceptual design report for the facilities capability assurance program roads and parking lot replacements. Part III: Supplemental information. FY 1994 line item
This report presents information pertaining to cost estimates for replacement of roads and parking lots for the Mound Laboratory.