Title: Conceptual design plans for the FY 1993 line items

Abstract

This Facilities Capability Assurance Program (FCAP) project provides for the design and construction of a reconfigured production facility(ies) for Mound`s non-nuclear weapons components. Existing buildings would be rehabilitated in order to locate final production/assembly areas within close proximity and in a facility suitable to operations of this nature. Ancillary operations will be located in nearby buildings, also rehabilitated, in order to provide support to final production with minimal handling and travel-time. Benefits of this reconfiguration include: reduced labor, space requirements, and product cycle time; maximum flexibility to accommodate new mission assignments without new buildings; restores existing manufacturing facilities to a condition that is conducive to state-of-the-art operations. This project is mound`s top priority project for FY93.

Publication Date:
Research Org.:
EG and G Mound Applied Technologies, Miamisburg, OH (United States)
Sponsoring Org.:
USDOE, Washington, DC (United States)
OSTI Identifier:
263008
Report Number(s):
MLM-MU-88-72-0002
ON: DE96013363; TRN: 96:004264
DOE Contract Number:
AC24-88DP43495
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 22 Dec 1988
Country of Publication:
United States
Language:
English
Subject:
05 NUCLEAR FUELS; 45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEFENSE; MOUND LABORATORY; RADIOACTIVE WASTE FACILITIES; COOLING SYSTEMS; DESIGN; BUILDINGS; CONSTRUCTION; LABOR; DRAINAGE; TELEPHONES; TRITIUM; RADIOACTIVE WASTE PROCESSING

Citation Formats

NONE. Conceptual design plans for the FY 1993 line items. United States: N. p., 1988. Web. doi:10.2172/263008.
NONE. Conceptual design plans for the FY 1993 line items. United States. doi:10.2172/263008.
NONE. Thu . "Conceptual design plans for the FY 1993 line items". United States. doi:10.2172/263008. https://www.osti.gov/servlets/purl/263008.
@article{osti_263008,
title = {Conceptual design plans for the FY 1993 line items},
author = {NONE},
abstractNote = {This Facilities Capability Assurance Program (FCAP) project provides for the design and construction of a reconfigured production facility(ies) for Mound`s non-nuclear weapons components. Existing buildings would be rehabilitated in order to locate final production/assembly areas within close proximity and in a facility suitable to operations of this nature. Ancillary operations will be located in nearby buildings, also rehabilitated, in order to provide support to final production with minimal handling and travel-time. Benefits of this reconfiguration include: reduced labor, space requirements, and product cycle time; maximum flexibility to accommodate new mission assignments without new buildings; restores existing manufacturing facilities to a condition that is conducive to state-of-the-art operations. This project is mound`s top priority project for FY93.},
doi = {10.2172/263008},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Thu Dec 22 00:00:00 EST 1988},
month = {Thu Dec 22 00:00:00 EST 1988}
}

Technical Report:

Save / Share:
  • The Test Area North Hot Shop Storage Pool contains 343 canisters of core debris from Three Mile Island, plus 13 fuel modules from the Loss-of-Fluid Test Reactor and a small number of commercial fuel rods and assemblies owned by the Department of Energy. The Dry Cask Storage Project will remove this fuel from the pool and place it in storage casks for retention until the proposed Federal Spent Fuel Repository'' is opened. This Conceptual Design Report and project proposal is a compilation of information for use in evaluating the Dry Cask Storage Project for Line Item funding and construction beginningmore » in 1993. The Document is presented in two volumes: Volume I contains sections 1 through 15 and is intended to be a stand-alone summary of information on the Line Item Construction Project. This report Volume II contains Appendices A through G, presenting more detailed project information on design, cost, schedule, and environmental impact.« less
  • The Test Area North Hot Shop Storage Pool contains 343 canisters of core debris from Three Mile Island, plus 13 fuel modules from the Loss-of-Fluid Test Reactor and a small number of commercial fuel rods and assemblies owned by the Department of Energy. The Dry Cask Storage Project will remove this fuel from the pool and place it in storage casks for retention until the proposed Federal Spent Fuel Repository''is opened. This Conceptual Design Report and project proposal is a compilation of information for use in evaluating the Dry Cask Storage Project for Line Item funding and construction beginning inmore » 1993. The Document is presented in two volumes: Volume 1 contains sections I through 15 and is intended to be a stand-alone summary of information on the Line Item Construction Project. Volume 2 contains Appendices A through G, presenting more detailed project information on design, cost, schedule, and environmental impact.« less
  • The Test Area North Hot Shop Storage Pool contains 343 canisters of core debris from Three Mile Island, plus 13 fuel modules from the Loss-of-Fluid Test Reactor and a small number of commercial fuel rods and assemblies owned by the Department of Energy. The Dry Cask Storage Project will remove this fuel from the pool and place it in storage casks for retention until the proposed ``Federal Spent Fuel Repository``is opened. This Conceptual Design Report and project proposal is a compilation of information for use in evaluating the Dry Cask Storage Project for Line Item funding and construction beginning inmore » 1993. The Document is presented in two volumes: Volume 1 contains sections I through 15 and is intended to be a stand-alone summary of information on the Line Item Construction Project. Volume 2 contains Appendices A through G, presenting more detailed project information on design, cost, schedule, and environmental impact.« less
  • The Test Area North Hot Shop Storage Pool contains 343 canisters of core debris from Three Mile Island, plus 13 fuel modules from the Loss-of-Fluid Test Reactor and a small number of commercial fuel rods and assemblies owned by the Department of Energy. The Dry Cask Storage Project will remove this fuel from the pool and place it in storage casks for retention until the proposed ``Federal Spent Fuel Repository`` is opened. This Conceptual Design Report and project proposal is a compilation of information for use in evaluating the Dry Cask Storage Project for Line Item funding and construction beginningmore » in 1993. The Document is presented in two volumes: Volume I contains sections 1 through 15 and is intended to be a stand-alone summary of information on the Line Item Construction Project. This report Volume II contains Appendices A through G, presenting more detailed project information on design, cost, schedule, and environmental impact.« less
  • This report presents information pertaining to cost estimates for replacement of roads and parking lots for the Mound Laboratory.