Title: Pre-operational safety appraisal Tritiated Scrap Recovery Facility, Mound facility

Abstract

The purpose of this report is to identify, assess, and document the hazards which are associated with the proposed operation of the Tritiated Scrap Recovery Facility at Mound Facility. A Pre-operational Safety Appraisal is a requirement as stated in Department of Energy Order 5481.1, Safety Analysis and Review System. The operations to be conducted in the new Tritiated Scrap Waste Recovery Facility are not new, but a continuation of a prime mission of Mound`s i.e. recovery of tritium from waste produced throughout the DOE complex. The new facility is a replacement of an existing process started in the early 1960`s and incorporates numerous design changes to enhance personnel and environmental safety. This report also documents the safety of a one time operation involving the recovery of tritium from material obtained by the Department of Energy from the State of Arizona. This project will involve the processing of 240,000 curies of tritium contained in glass ampoules that were to be used in items such as luminous dial watches. These were manufactured by the now defunct American Atomics Corporation, Tucson, Arizona.

Authors:
; ; ;
Publication Date:
Research Org.:
Monsanto Research Corp., Miamisburg, OH (United States). Mound
Sponsoring Org.:
USDOE, Washington, DC (United States)
OSTI Identifier:
255003
Report Number(s):
MLM-ML-81-51-0001
ON: DE96012387; TRN: 96:004027
DOE Contract Number:  
AC04-76DP00053
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: [1996]
Country of Publication:
United States
Language:
English
Subject:
05 NUCLEAR FUELS; SCRAP; RADIOACTIVE WASTE PROCESSING; TRITIUM; MATERIALS RECOVERY; RADIOACTIVE WASTE FACILITIES; SAFETY ANALYSIS; DESIGN; TRITIUM COMPOUNDS; MOUND LABORATORY

Citation Formats

Dauby, J J, Flanagan, T M, Metcalf, L W, and Rhinehammer, T B. Pre-operational safety appraisal Tritiated Scrap Recovery Facility, Mound facility. United States: N. p., 1996. Web. doi:10.2172/255003.
Dauby, J J, Flanagan, T M, Metcalf, L W, & Rhinehammer, T B. Pre-operational safety appraisal Tritiated Scrap Recovery Facility, Mound facility. United States. https://doi.org/10.2172/255003
Dauby, J J, Flanagan, T M, Metcalf, L W, and Rhinehammer, T B. Mon . "Pre-operational safety appraisal Tritiated Scrap Recovery Facility, Mound facility". United States. https://doi.org/10.2172/255003. https://www.osti.gov/servlets/purl/255003.
@article{osti_255003,
title = {Pre-operational safety appraisal Tritiated Scrap Recovery Facility, Mound facility},
author = {Dauby, J J and Flanagan, T M and Metcalf, L W and Rhinehammer, T B},
abstractNote = {The purpose of this report is to identify, assess, and document the hazards which are associated with the proposed operation of the Tritiated Scrap Recovery Facility at Mound Facility. A Pre-operational Safety Appraisal is a requirement as stated in Department of Energy Order 5481.1, Safety Analysis and Review System. The operations to be conducted in the new Tritiated Scrap Waste Recovery Facility are not new, but a continuation of a prime mission of Mound`s i.e. recovery of tritium from waste produced throughout the DOE complex. The new facility is a replacement of an existing process started in the early 1960`s and incorporates numerous design changes to enhance personnel and environmental safety. This report also documents the safety of a one time operation involving the recovery of tritium from material obtained by the Department of Energy from the State of Arizona. This project will involve the processing of 240,000 curies of tritium contained in glass ampoules that were to be used in items such as luminous dial watches. These were manufactured by the now defunct American Atomics Corporation, Tucson, Arizona.},
doi = {10.2172/255003},
url = {https://www.osti.gov/biblio/255003}, journal = {},
number = ,
volume = ,
place = {United States},
year = {1996},
month = {7}
}