Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Ultrafast High Voltage Kicker System Hardware for Ion Clearing Gaps

Technical Report ·
DOI:https://doi.org/10.2172/2375009· OSTI ID:2375009
 [1];  [2]
  1. RadiaBeam Technologies, LLC, Santa Monica, CA (United States)
  2. Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)

Jefferson Lab (JLab) will collaborate with Radiabeam, LLC in a DOE SBIR Phase II Project (DOE Grant No. DE-SC0019684, title: “Ultrafast High Voltage Kicker System Hardware for Ion Clearing Gaps”) to develop and test a MHz high voltage nanosecond kicker system that enables the time structure required by the ion traps for high current electron beam cooling. High current (in particular energy recovery) linac based electron cooling facilities for medium to high energy bunched proton or ion beams are of great interest for the recently funded Electron-Ion Collider (EIC) to which Jefferson Lab plays a critical role. The successful execution of this project will enable the capability to mitigate the ion trapping effect and circumvent a major obstacle preventing reliable operation of the crucial cooling facilities.

Research Organization:
Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); RadiaBeam Technologies, LLC, Santa Monica, CA (United States)
Sponsoring Organization:
USDOE Office of Science (SC), Nuclear Physics (NP)
DOE Contract Number:
AC05-06OR23177; SC0019684
OSTI ID:
2375009
Report Number(s):
CRADA--2020S010
Country of Publication:
United States
Language:
English

Similar Records

ULTRAFAST HIGH-VOLTAGE KICKER SYSTEM HARDWARE FOR ION CLEARING GAPS
Conference · 2024 · OSTI ID:2372817

A Magnetized Electron Source For Ion Beam Cooling
Technical Report · 2019 · OSTI ID:1580640

Ultrafast High-Voltage Kicker System for Ion-Clearing Gaps
Journal Article · 2021 · Photonics · OSTI ID:1830029

Related Subjects