skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Improving the Investment Potential of the Evenkiiskaya HPP When Working Jointly with HPPS of the Volga – Kama Cascade

Abstract

The capability is studied of improving the investment potential of the Evenkiiskaya HPP by using the power it generates in the United Power System of the European part of Russia by transitioning to a compensated electrical regime of water reservoir resource usage. A quantitative assessment of Evenkiiskaya HPP usage is presented using daily load demand. Increasing the guaranteed HPP power is proposed as an alternative to new nuclear power stations.

Authors:
; ;  [1]
  1. National Research University “MPÉI” (Russian Federation)
Publication Date:
OSTI Identifier:
22612632
Resource Type:
Journal Article
Resource Relation:
Journal Name: Power Technology and Engineering (Print); Journal Volume: 50; Journal Issue: 3; Other Information: Copyright (c) 2016 Springer Science+Business Media New York; http://www.springer-ny.com; Country of input: International Atomic Energy Agency (IAEA)
Country of Publication:
United States
Language:
English
Subject:
29 ENERGY PLANNING, POLICY AND ECONOMY; 42 ENGINEERING; HYDROELECTRIC POWER PLANTS; INVESTMENT; LOAD MANAGEMENT; NUCLEAR POWER PLANTS; POWER SYSTEMS; RUSSIAN FEDERATION; WATER RESERVOIRS

Citation Formats

Aleksandrovskii, A. Yu., E-mail: ayaleksand@mail.ru, Soldatkin, A. Yu., and Volkov, D. M. Improving the Investment Potential of the Evenkiiskaya HPP When Working Jointly with HPPS of the Volga – Kama Cascade. United States: N. p., 2016. Web. doi:10.1007/S10749-016-0689-4.
Aleksandrovskii, A. Yu., E-mail: ayaleksand@mail.ru, Soldatkin, A. Yu., & Volkov, D. M. Improving the Investment Potential of the Evenkiiskaya HPP When Working Jointly with HPPS of the Volga – Kama Cascade. United States. doi:10.1007/S10749-016-0689-4.
Aleksandrovskii, A. Yu., E-mail: ayaleksand@mail.ru, Soldatkin, A. Yu., and Volkov, D. M. Thu . "Improving the Investment Potential of the Evenkiiskaya HPP When Working Jointly with HPPS of the Volga – Kama Cascade". United States. doi:10.1007/S10749-016-0689-4.
@article{osti_22612632,
title = {Improving the Investment Potential of the Evenkiiskaya HPP When Working Jointly with HPPS of the Volga – Kama Cascade},
author = {Aleksandrovskii, A. Yu., E-mail: ayaleksand@mail.ru and Soldatkin, A. Yu. and Volkov, D. M.},
abstractNote = {The capability is studied of improving the investment potential of the Evenkiiskaya HPP by using the power it generates in the United Power System of the European part of Russia by transitioning to a compensated electrical regime of water reservoir resource usage. A quantitative assessment of Evenkiiskaya HPP usage is presented using daily load demand. Increasing the guaranteed HPP power is proposed as an alternative to new nuclear power stations.},
doi = {10.1007/S10749-016-0689-4},
journal = {Power Technology and Engineering (Print)},
number = 3,
volume = 50,
place = {United States},
year = {Thu Sep 15 00:00:00 EDT 2016},
month = {Thu Sep 15 00:00:00 EDT 2016}
}