Title: Shift manager workload assessment - A case study

Conference ·
OSTI ID:22029993
;  [1];  [2]
  1. Bruce Power, P O Box 1540 B10, Tiverton, Ont. N0G 2T0 (Canada)
  2. Atomic Energy of Canada Ltd., 2251 Speakman Drive, Mississauga, Ont. L5K 1B2 (Canada)

In early 2003, Bruce Power restarted two of its previously laid up units in the Bruce A generating station, Units 3 and 4. However, due to challenges relating to the availability of personnel with active Shift Manager licenses, an alternate shift structure was proposed to ensure the safe operation of the station. This alternate structure resulted in a redistribution of responsibility, and a need to assess the resulting changes in workload. Atomic Energy of Canada Limited was contracted to perform a workload assessment based on the new shift structure, and to provide recommendations, if necessary, to ensure Shift Managers had sufficient resources available to perform their required duties. This paper discusses the performance of that assessment, and lessons learned as a result of the work performed during the Restart project. (authors)

Research Organization:
American Nuclear Society, 555 North Kensington Avenue, La Grange Park, IL 60526 (United States)
OSTI ID:
22029993
Resource Relation:
Conference: NPIC and HMIT 2006: 5. International Topical Meeting on Nuclear Plant Instrumentation Controls, and Human Machine Interface Technology, Albuquerque, NM (United States), 12-16 Nov 2006; Other Information: Country of input: France; 3 refs.; Related Information: In: Proceedings of the 5. International Topical Meeting on Nuclear Plant Instrumentation Controls, and Human Machine Interface Technology| 1430 p.
Country of Publication:
United States
Language: