Title: Decommissioning and Dismantling of Liquid Waste Storage and Liquid Waste Treatment Facility from Paldiski Nuclear Site, Estonia

Abstract

The Paldiski Nuclear Facility in Estonia, with two nuclear reactors was owned by the Soviet Navy and was used for training the navy personnel to operate submarine nuclear reactors. After collapse of Soviet Union the Facility was shut down and handed over to the Estonian government in 1995. In co-operation with the Paldiski International Expert Reference Group (PIERG) decommission strategy was worked out and started to implement. Conditioning of solid and liquid operational waste and dismantling of contaminated installations and buildings were among the key issues of the Strategy. Most of the liquid waste volume, remained at the Facility, was processed in the frames of an Estonian-Finnish co-operation project using a mobile wastewater purification unit NURES (IVO International OY) and water was discharged prior to the site take-over. In 1999-2002 ca 120 m{sup 3} of semi-liquid tank sediments (a mixture of ion exchange resins, sand filters, evaporator and flocculation slurry), remained after treatment of liquid waste were solidified in steel containers and stored into interim storage. The project was carried out under the Swedish - Estonian co-operation program on radiation protection and nuclear safety. Contaminated installations in buildings, used for treatment and storage of liquid waste (Liquid Waste Treatment Facilitymore » and Liquid Waste Storage) were then dismantled and the buildings demolished in 2001-2004. (authors)« less

Authors:
 [1];  [2]; ;  [3];  [4]
  1. AS ALARA, Leetse tee 21, Paldiski, 76806 (Estonia)
  2. Delegation of the European Commission to Russia, Kadashevskaja nab. 14/1 119017 Moscow (Russian Federation)
  3. SKB, Box 5864, Stockholm, SE-102 40 (Sweden)
  4. Studsvik RadWaste, Nykoping, SE-611 82 (Sweden)
Publication Date:
Research Org.:
WM Symposia, Inc., PO Box 13023, Tucson, AZ, 85732-3023 (United States)
OSTI Identifier:
21210770
Report Number(s):
INIS-US-09-WM-06572
TRN: US09V1198081232
Resource Type:
Conference
Resource Relation:
Conference: Waste Management 2006 Symposium - WM'06 - Global Accomplishments in Environmental and Radioactive Waste Management: Education and Opportunity for the Next Generation of Waste Management Professionals, Tucson, AZ (United States), 26 Feb - 2 Mar 2006; Other Information: Country of input: France; 5 refs
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; DECOMMISSIONING; ESTONIA; ION EXCHANGE; NUCLEAR FACILITIES; RADIATION PROTECTION; RADIOACTIVE WASTES; RESINS; SHIP PROPULSION REACTORS; SLURRIES; STEELS; SUBMARINES; TANKS; TRAINING; WASTE STORAGE; WASTE WATER

Citation Formats

Varvas, M., Putnik, H., Nirvin, B., Pettersson, S., and Johnsson, B. Decommissioning and Dismantling of Liquid Waste Storage and Liquid Waste Treatment Facility from Paldiski Nuclear Site, Estonia. United States: N. p., 2006. Web.
Varvas, M., Putnik, H., Nirvin, B., Pettersson, S., & Johnsson, B. Decommissioning and Dismantling of Liquid Waste Storage and Liquid Waste Treatment Facility from Paldiski Nuclear Site, Estonia. United States.
Varvas, M., Putnik, H., Nirvin, B., Pettersson, S., and Johnsson, B. 2006. "Decommissioning and Dismantling of Liquid Waste Storage and Liquid Waste Treatment Facility from Paldiski Nuclear Site, Estonia". United States. doi:.
@article{osti_21210770,
title = {Decommissioning and Dismantling of Liquid Waste Storage and Liquid Waste Treatment Facility from Paldiski Nuclear Site, Estonia},
author = {Varvas, M. and Putnik, H. and Nirvin, B. and Pettersson, S. and Johnsson, B.},
abstractNote = {The Paldiski Nuclear Facility in Estonia, with two nuclear reactors was owned by the Soviet Navy and was used for training the navy personnel to operate submarine nuclear reactors. After collapse of Soviet Union the Facility was shut down and handed over to the Estonian government in 1995. In co-operation with the Paldiski International Expert Reference Group (PIERG) decommission strategy was worked out and started to implement. Conditioning of solid and liquid operational waste and dismantling of contaminated installations and buildings were among the key issues of the Strategy. Most of the liquid waste volume, remained at the Facility, was processed in the frames of an Estonian-Finnish co-operation project using a mobile wastewater purification unit NURES (IVO International OY) and water was discharged prior to the site take-over. In 1999-2002 ca 120 m{sup 3} of semi-liquid tank sediments (a mixture of ion exchange resins, sand filters, evaporator and flocculation slurry), remained after treatment of liquid waste were solidified in steel containers and stored into interim storage. The project was carried out under the Swedish - Estonian co-operation program on radiation protection and nuclear safety. Contaminated installations in buildings, used for treatment and storage of liquid waste (Liquid Waste Treatment Facility and Liquid Waste Storage) were then dismantled and the buildings demolished in 2001-2004. (authors)},
doi = {},
journal = {},
number = ,
volume = ,
place = {United States},
year = 2006,
month = 7
}

Conference:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that hold this conference proceeding.

Save / Share:
  • During maintenance of nuclear power plants, and during their decommissioning period, a large quantity of radioactive metallic waste will accrue. On the other hand the capacity for final disposal of radioactive waste in Germany is limited as well as that in the US. That is why all procedures related to this topic should be handled with a maximum of efficiency. The German model of consistent recycling of the radioactive metal scrap within the nuclear industry therefore also offers high capabilities for facilities in the US. The paper gives a compact overview of the impressive results of melting treatment, the currentmore » potential and further developments. Thousands of cubic metres of final disposal capacity have been saved. The highest level of efficiency and safety by combining general surface decontamination by blasting and nuclide specific decontamination by melting associated with the typical effects of homogenization. An established process - nationally and internationally recognized. Excellent connection between economy and ecology. (authors)« less
  • The 216-A-29 ditch is located in the central portion of the Hanford Site with Operable Unit 200-PO-5. The ditch is classified under the Resource Conservation and Recovery Act of 1976 as a Treatment, Storage, and Disposal (TSD) Facility and as such, is to be removed from service in support of the Hanford Federal Facility Agreement and Consent Order Tri-Party Agreement (Ecology et al. 1989) Milestone M-17-10, which states cease all liquid discharges to hazardous land disposal units unless such units have been clean closed in accordance with the Resource Conservation and Recovery Act of 1976''. The 216-A-29 ditch is onemore » stream feeding the 216-B-3 Pond system, and its removal from service was necessary to support the closure strategy for the 216-B-3 Pond system. Interim stabilization of the 216-A-29 ditch is the first step required to comply with the Tri-Party Agreement (Ecology et al. 1989) and the eventual decommissioning of the entire B Pond system. Interim stabilization was required to maintain the 216-A-29 ditch in a stable configuration until closure actions have been determined and initiated. 4 refs., 3 figs.« less
  • The German pilot reprocessing plant WAK was operated until 1990 and processed about 200 tons of nuclear fuels from test and power reactors. In late 1991, the Federal Republic of Germany, the State of Baden-Wuerttemberg, and the utilities decided to shut down the WAK and to dismantle it completely to the green field. In the years 2000/2001, remote-controlled dismantling of the process cells in the reprocessing building was completed. Part of the building has already been subjected to release measurement and released from the obligations under the German Atomic Energy Act. However, a major prerequisite for the complete dismantling ofmore » the WAK is the management of the 60 m{sup 3} high-level liquid waste (HLLW) with an activity of 8.0 E 17 Bq resulting from reprocessing. For this purpose, the Karlsruhe vitrification plant (VEK) was constructed and is now under commissioning /1/. Hot operation is foreseen for the years 2007/2008. Following vitrification operation, dismantling of the four HLLW tanks in the storage building will be a particularly challenging task in terms of radiology. The HLLW tanks are located in thick-walled concrete cells that require remote- controlled horizontal access. For this purpose, a new access building, the southern extension, was built. It serves to bring in and operate the remote handling tools and allows for the contamination-safe removal and measurement of the MAW drums. In contrast to the crane in the process building, the manipulator carrier system used here is an 8 Mg excavator. All tools, including the wall cutter, chisel, cutting disk, scissors, and the electric master-slave manipulator (EMSM), can be docked to this excavator. The VEK installations shall be dismantled parallel to the HLLW storage tanks. Due to the dose rates expected after operation, two dismantling areas have to be distinguished in the VEK: The core area with the HLLW transfer cell, melter cell, and exhaust gas cell requires remote dismantling. All remaining cells and rooms may presumably be dismantled manually. (authors)« less
  • The Low-Level Radioactive Waste (LLRW) Policy Act of 1980 encouraged states to form into compacts that would provide for regional disposal of LLRW. At present, none of these compacts' disposal facilities are licensed or under construction. The LLRW facility that is currently available to receive waste from most of the country is scheduled to close in July 1994 to all but the Southeast Compact and to close completely in January 1996. Therefore, utility LLRW generators may need to consider on-site storage of LLRW until permanent disposal facilities become available.
  • This paper reports that during 1984 to 1989 in Germany the process of melting radioactive scrap was assessed within the frame of research contracts, sponsored by European Community. Up to now more than 3500 tons of low level contaminated scrap ({le}200 Bqlg) have been melted and recycled. The scrap which was shipped to the plant, had about 95% of Co 60 and Cs 137 activity. In the average the ratio between Co and Cs was 60 : 40. This might be different for scrap in other NPP's, especially in NPP's which had no bigger damage on fuel elements, the Csmore » contents should be lower. Cs quantitatively was found in slag and filter dust, whereas cobalt remained in the ingot. In 1989, a separate and modernized facility was erected, taking into consideration the results from the previous tests. The maximum activity level to be handled is 200 Bqlg. In this new plant 2000 tons have been treated up to now.« less