skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Status report of the munich tandem accelerator

Journal Article · · AIP Conference Proceedings
DOI:https://doi.org/10.1063/1.58969· OSTI ID:21205500
;  [1]
  1. Beschleunigerlaboratorium der Universitaet und der Technischen Universitaet Muenchen, 85748 Garching (Germany)

The Munich MP tandem accelerator is in operation since 1970. Now it is equipped with a NEC Pelletron charging system and HVEC stainless steel tubes. The negative ion injector and the high energy extension with the analyzing system were completely reconstructed. Also the instrumentation was improved continuously. The tandem is used in an increasing degree not only for nuclear and atomic physics, but also for biological and material science work.

OSTI ID:
21205500
Journal Information:
AIP Conference Proceedings, Vol. 473, Issue 1; Conference: 8. international conference on heavy-ion accelerator technology, Argonne, IL (United States), 5-9 Oct 1998; Other Information: DOI: 10.1063/1.58969; (c) 1999 American Institute of Physics; Country of input: International Atomic Energy Agency (IAEA); ISSN 0094-243X
Country of Publication:
United States
Language:
English