skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Fermilab Main Injector Beam Position Monitor Upgrade

Journal Article · · AIP Conference Proceedings
DOI:https://doi.org/10.1063/1.2401445· OSTI ID:20894957

An upgrade of the Beam Position Monitor (BPM) signal processing and data acquisition system for the Fermilab Main Injector is described. The Main Injector is a fast cycling synchrotron that accelerates protons or antiprotons from 8 to 150 GeV, Each Main Injector cycle can have a totally different magnet ramp, RF frequency configuration, beam bunch structure, and injection/extraction pattern from the previous cycle. The new BPM system provides the capabilities and flexibility required by the dynamic and complex machine operations. The system offers measurement capability in the 2.5 MHz and 53 MHz channels to detect the range of bunch structures for protons and antiprotons in both wideband (turn-by-turn) and narrowband (closed-orbit) modes. The new BPM read-out system is based on the digital receiver concept and is highly configurable, allowing the signal processing of nearly all Main Injector beam conditions, including the detection of individual batches. An overview of the BPM system in the Main Injector operating environment, some technology details and first beam measurements are presented.

OSTI ID:
20894957
Journal Information:
AIP Conference Proceedings, Vol. 868, Issue 1; Conference: 12. beam instrumentation workshop, Batavia, IL (United States), 1-4 May 2006; Other Information: DOI: 10.1063/1.2401445; (c) 2006 American Institute of Physics; Country of input: International Atomic Energy Agency (IAEA); ISSN 0094-243X
Country of Publication:
United States
Language:
English

Similar Records

Fermilab Main Injector Beam Position Monitor Upgrade
Conference · Mon May 01 00:00:00 EDT 2006 · AIP Conf.Proc.868:540-548,2006 · OSTI ID:20894957

Analog Signal Pre-Processing For The Fermilab Main Injector BPM Upgrade
Journal Article · Mon Nov 20 00:00:00 EST 2006 · AIP Conference Proceedings · OSTI ID:20894957

Analog signal pre-processing for the Fermilab Main Injector BPM upgrade
Conference · Mon May 01 00:00:00 EDT 2006 · AIP Conf.Proc.868:517-527,2006 · OSTI ID:20894957