skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: New, environmentally friendly power plants being sought

Abstract

The common theme at the Power-Gen International Conference in November 2006 was: the world's appetite for electricity must be fed with new power plant construction. These new plants must be designed and built in an environmentally responsible way. The article reports on keynote highlights, on presentations on carbon capture and on panel discussions. TXU plans to add 9.1 GW of new coal-fired generation in Texas by 2011. Bradley Jones said the company plans to spend $2 billion on carbon sequestration research. David Ekins described a carbon capture effort that EPRI and We Energies are pursuing. Joubert, of Alstom, thought that IGCC might one day become competitive but not before 2020. 2 photos.

Authors:
Publication Date:
OSTI Identifier:
20885819
Resource Type:
Journal Article
Resource Relation:
Journal Name: Power Engineering (Barrington); Journal Volume: 111; Journal Issue: 1; Conference: Power-Gen International Conference, Orlando, Fl (United States), 28-30 Nov 2006
Country of Publication:
United States
Language:
English
Subject:
20 FOSSIL-FUELED POWER PLANTS; 01 COAL, LIGNITE, AND PEAT; USA; MEETINGS; POWER GENERATION; CONSTRUCTION; FOSSIL-FUEL POWER PLANTS; COAL; CARBON SEQUESTRATION; COAL GASIFICATION; COMBINED-CYCLE POWER PLANTS; PULVERIZED FUELS; NUCLEAR POWER PLANTS; CARBON DIOXIDE; CAPTURE

Citation Formats

Hansen, T. New, environmentally friendly power plants being sought. United States: N. p., 2007. Web.
Hansen, T. New, environmentally friendly power plants being sought. United States.
Hansen, T. Mon . "New, environmentally friendly power plants being sought". United States. doi:.
@article{osti_20885819,
title = {New, environmentally friendly power plants being sought},
author = {Hansen, T.},
abstractNote = {The common theme at the Power-Gen International Conference in November 2006 was: the world's appetite for electricity must be fed with new power plant construction. These new plants must be designed and built in an environmentally responsible way. The article reports on keynote highlights, on presentations on carbon capture and on panel discussions. TXU plans to add 9.1 GW of new coal-fired generation in Texas by 2011. Bradley Jones said the company plans to spend $2 billion on carbon sequestration research. David Ekins described a carbon capture effort that EPRI and We Energies are pursuing. Joubert, of Alstom, thought that IGCC might one day become competitive but not before 2020. 2 photos.},
doi = {},
journal = {Power Engineering (Barrington)},
number = 1,
volume = 111,
place = {United States},
year = {Mon Jan 15 00:00:00 EST 2007},
month = {Mon Jan 15 00:00:00 EST 2007}
}
  • An old process, synthesis gas (hydrogen and carbon monoxide), is teaming up with advancing gas-turbine technology to offer refineries and chemical plants a clean disposal method for wastes - a method that simultaneously generates valuable electricity and steam. The method is taking hold in the United States and other countries because many industrial wastes are combustible: slop oils and emulsions, coke and phenolic wastes are a few examples of wastes the synthesis gas process can use as raw materials. The modern process, often called {open_quotes}cogeneration,{close_quotes} involves a natural-gas-fueled, combustion-turbine-driven electrical generator. Waste or by-product fuel gases are also increasingly beingmore » used to partially fuel cogeneration turbines. 1 ref., 3 figs., 1 tab.« less
  • Florida's first Jurassic oil well, completed in June, has caused a major drilling and leasing play in the NW. corner of the state. Dincovery is the most easterly deep Mesozoic oil production in the U.S. Florida's Jurassic trend proved productive at the Humble-Louisiana Land and Exploration Co. St. Regis Paper 1 which flowed 1,712 bopd and 2.145 MMcfd gas through 1/4-in. choke on June 11, 1970. Jurassic hydrocarbon potential is being sought beneath present producing Lower Cretaceous carbonate reservoirs in the S. Florida embayment. The position of deep Jurassic beds is shown in a N.-S. regional structural cross section, whichmore » extends from the outcrop of crystalline rocks in central Georgia on the north to Big Pine Key in Monroe County, Florida, on the south. This cross section is based on data from 22 wells. Other Florida exploratory activity is shown on the base map.« less
  • Companies have drilled for years on 40-acre checkerboard spacing under the assumption that oil and gas wells drain in a nice, perfect circle. What would happen if it could be proved that, at least in Devonian shale formations, wells drain in an elliptical pattern and that only 10 to 20% of the available gas there has been drained by the 10,000 wells already producing. These hypotheses and others could be confirmed by a study being conducted by the Morgantown Energy Technology Center in West Virginia as part of its eastern gas shales project. An offset well test in Meigs County,more » Ohio, was undertaken to investigate the following reservoir parameters: (1) flow characteristics of gas in a fractured shale; (2) orientation and distribution of natural fractures; (3) storage and release mechanisms of gas from the shale, and (4) directional gas flow and impact on production practices. The testing is discussed.« less
  • The overall goal of this project, as originally proposed, was to optimize the formulation of a novel solvent as a critical enabler for the cost-effective, energy-efficient, environmentally-friendly capture of CO{sub 2} at coal-fired utility plants. Aqueous blends of concentrated piperazine (PZ) with other compounds had been shown to exhibit high rates of CO{sub 2} absorption, low regeneration energy, and other desirable performance characteristics during an earlier 5-year development program conducted by B&W. The specific objective of this project was to identify PZ-based solvent formulations that globally optimize the performance of coal-fired power plants equipped with CO{sub 2} scrubbing systems. Whilemore » previous solvent development studies have tended to focus on energy consumption and absorber size, important issues to be sure, the current work seeks to explore, understand, and optimize solvent formulation across the full gamut of issues related to commercial application of the technology: capital and operating costs, operability, reliability, environmental, health and safety (EH&S), etc. Work on the project was intended to be performed under four budget periods. The objective of the work in the first budget period has been to identify several candidate formulations of a concentrated PZ-based solvent for detailed characterization and evaluation. Work in the second budget period would generate reliable and comprehensive property and performance data for the identified formulations. Work in the third budget period would quantify the expected performance of the selected formulations in a commercial CO{sub 2} scrubbing process. Finally, work in the fourth budget period would provide a final technology feasibility study and a preliminary technology EH&S assessment. Due to other business priorities, however, B&W has requested that this project be terminated at the end of the first budget period. This document therefore serves as the final report for this project. It is the first volume of the two-volume final report and summarizes Budget Period 1 accomplishments under Tasks 1-5 of the project, including the selection of four solvent formulations for further study.« less
  • In this work, we describe a novel design that utilizes seawater and a portion of rejected heat from a nuclear plant's steam cycle to operate a water desalination system using forward osmosis technology. Water produced from this process is of sufficient quality to be readily used to supply plant demands for continuous makeup water. The proposed process minimizes the environmental concerns associated with thermal pollution of public waters and the resulting adverse impact on marine ecology. To demonstrate the technical feasibility of this conceptual design of a water treatment process, we discuss a case study as an example to describemore » how the proposed design can be implemented in a nuclear power station with a once--through cooling system that discharges rejected heat to an open sound seawater as its ultimate heat sink. In this case study, the station uses a leased (vendor owned and operated) onsite water treatment system that demineralizes and polishes up to 500-gpm of city water (at 100 ppm TDS) to supply high-quality makeup water (< 0.01 ppm TDS) to the plant steam system. The objectives of implementing the new design are three fold: 1) forego current practice of using city water as the source of plant makeup water, thereby reducing the nuclear station's impact on the region's potable water supply by roughly 100 million gallons/year, 2) minimize the adverse impact of discharging rejected heat into the open sound seawater and, hence, protect the marine ecology, and 3) eliminate the reliance on external vendor that owns and operates the onsite water treatment system, thereby saving an annual fixed cost of $600 K plus 6 cents per 1,000 gallons of pure water. The design will also eliminate the need for using two double-path reverse osmosis (RO) units that consume 425 kW/h of electric power to operate two RO pumps (480 V, 281.6 HP, and 317.4 amps). (authors)« less