skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Meeting the Title I NO{sub x} requirements: A comprehensive approach

Abstract

This paper will review the Title 1 NO{sub x} emission reduction strategy of an electric utility. Since 1995, New York State Electric and Gas has been operating its electric generating units under the nitrogen oxide emission requirements of Title 1 of the Clean Air Amendments of 1990. New York State Electric and Gas operates six coal fired generating stations which are located in the Ozone Transport Region of the Northeast US. The geographic location of NYSEG's generating stations requires additional nitrogen oxide reductions during the summer months. This paper will examine the comprehensive approach taken by NYSEG in meeting its environmental obligations. NYSEG used a mixed approach of operational optimization, installation of low NO{sub x} burners, and installation of advanced technology to reduce emissions. NYSEG has also been awarded two projects by the Department of Energy to demonstrate innovative nitrogen oxide reduction technology. The paper will include a review of the DOE projects and the results achieved to date. NYSEG's three years of operating experience under the Title 1 requirements will also be discussed. The paper will conclude with a review of what NYSEG is examining for future strategies as further NO{sub x} reductions are expected to be required towardsmore » the end of the decade.« less

Authors:
Publication Date:
Research Org.:
New York State Electric and Gas Corp, NY (US)
OSTI Identifier:
20050600
Report Number(s):
CONF-971214-
TRN: IM200024%%111
Resource Type:
Conference
Resource Relation:
Conference: 10th International Conference and Exhibition for the Power Generating Industries, Dallas, TX (US), 12/09/1997--12/11/1997; Other Information: PBD: [1998]; Related Information: In: Power-Gen '97 International, [2000] pages.
Country of Publication:
United States
Language:
English
Subject:
01 COAL, LIGNITE, AND PEAT; 29 ENERGY PLANNING, POLICY AND ECONOMY; FOSSIL-FUEL POWER PLANTS; AIR POLLUTION CONTROL; NITROGEN OXIDES; COAL; OZONE; LONG-RANGE TRANSPORT

Citation Formats

DeAngelo, J. Meeting the Title I NO{sub x} requirements: A comprehensive approach. United States: N. p., 1998. Web.
DeAngelo, J. Meeting the Title I NO{sub x} requirements: A comprehensive approach. United States.
DeAngelo, J. Wed . "Meeting the Title I NO{sub x} requirements: A comprehensive approach". United States. doi:.
@article{osti_20050600,
title = {Meeting the Title I NO{sub x} requirements: A comprehensive approach},
author = {DeAngelo, J.},
abstractNote = {This paper will review the Title 1 NO{sub x} emission reduction strategy of an electric utility. Since 1995, New York State Electric and Gas has been operating its electric generating units under the nitrogen oxide emission requirements of Title 1 of the Clean Air Amendments of 1990. New York State Electric and Gas operates six coal fired generating stations which are located in the Ozone Transport Region of the Northeast US. The geographic location of NYSEG's generating stations requires additional nitrogen oxide reductions during the summer months. This paper will examine the comprehensive approach taken by NYSEG in meeting its environmental obligations. NYSEG used a mixed approach of operational optimization, installation of low NO{sub x} burners, and installation of advanced technology to reduce emissions. NYSEG has also been awarded two projects by the Department of Energy to demonstrate innovative nitrogen oxide reduction technology. The paper will include a review of the DOE projects and the results achieved to date. NYSEG's three years of operating experience under the Title 1 requirements will also be discussed. The paper will conclude with a review of what NYSEG is examining for future strategies as further NO{sub x} reductions are expected to be required towards the end of the decade.},
doi = {},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Wed Jul 01 00:00:00 EDT 1998},
month = {Wed Jul 01 00:00:00 EDT 1998}
}

Conference:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that hold this conference proceeding.

Save / Share:
  • Utility strategic planning for NO{sub x} compliance will be significantly influenced by not only the new Title IV Phase 2 rules but also y the pending new ozone non-attainment requirements and the proposed changes to the National Ambient Air Quality Standards (NAAQS). These regulations will have far-reaching effects on the NO{sub x} compliance strategy for most utilities. A utility`s goal is to develop a compliance plan that builds on the Phase 1 work just completed, while cost-effectively positioning themselves for the deregulated electricity market. With a typically broad mix of generating unit sizes, ages, capacity factors, fuels, and emission rates,more » a utility`s air emission compliance planning committee must deal with an ever growing mountain of data and options. The compliance planning committee can leverage the knowledge obtained in Phase 1 of the market-based Acid Rain Program to achieve a long-range strategy that will give the utility the flexibility to be competitive in a broad range of market conditions. This paper addresses how this monumental task can be accomplished using innovative application of proven technologies, coupled with the security of conservative risk management.« less
  • Crown Zellerbach's Antioch Recycle Paper Mill has installed and operated a 32 mw supplementary fired cogeneration system based on a G.E. MS6001 gas turbine. The system uses steam injection at steam to fuel ratio of about 0.90 to achieve an NO/sub x/ emission limit from the gas turbine of 42 PPM/sub V/. The steam injection works very well except at load conditions approaching 12 mw. Modifications to allow steam injection to the design level of 8 mw will involve substantial hardware and software changes. NO/sub x/ produced in the gas turbine is reduced after passing through the duct burners andmore » HRSG.« less
  • The requirements for qualifying Class 1E equipment for Nuclear Power Generating Stations were significantly revised in 1974 and 1975. The Nuclear Regulatory Commission is presently requiring utilities to comply with these revised standards and regulatory guides in order to obtain the necessary permits. Manufacturers are developing and implementing programs to comply with the new requirements. One of the more difficult new requirements of qualification is aging to achieve advanced life condition. The objectives and methods described for aging are difficult for much of the equipment within the Protection System. This paper deals with solutions for qualification in a practical sense,more » with emphasis on the aging issue and does not elaborate on seismic or environmental qualifications.« less