skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Beam Dynamics Studies at the PIP-II Injector Test Facility

Conference ·

A series of beam dynamic studies were performed in 2020-2021 at the PIP-II Injector Test Facility (PIP2IT) that has been built to validate the concept of the front-end of the PIP-II linac being constructed at Fermilab. PIP2IT is comprised of a 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1- MeV CW RFQ, followed by a 10-m Medium Energy Beam Transport (MEBT), 2 cryomodules accelerating the beam to 16 MeV and a High-Energy Beam Transport (HEBT) bringing the beam to a dump. This paper presents beam dynamics - related measurements performed at PIP2IT such as the Twiss parameters with Allison scanners, beam envelopes along the injector, and transverse and longitudinal rms emittance reconstruction. These measurements are compared with predictions from the beam dynamics code Tracewin.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC), High Energy Physics (HEP)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1883586
Report Number(s):
FERMILAB-CONF-22-630-AD-PIP2; arXiv:2208.11753; oai:inspirehep.net:2141962
Resource Relation:
Journal Volume: 34; Journal Issue: 36
Country of Publication:
United States
Language:
English

Similar Records

PIP-II Injector Test: Challenges and Status
Conference · Tue Oct 04 00:00:00 EDT 2016 · OSTI ID:1883586

Status of the Warm Front End of PIP-II Injector Test
Conference · Mon May 01 00:00:00 EDT 2017 · OSTI ID:1883586

Experimental Study of Beam Dynamics in the PIP-II MEBT Prototype
Conference · Mon Jan 01 00:00:00 EST 2018 · OSTI ID:1883586

Related Subjects