Beam Dynamics Studies at the PIP-II Injector Test Facility
A series of beam dynamic studies were performed in 2020-2021 at the PIP-II Injector Test Facility (PIP2IT) that has been built to validate the concept of the front-end of the PIP-II linac being constructed at Fermilab. PIP2IT is comprised of a 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1- MeV CW RFQ, followed by a 10-m Medium Energy Beam Transport (MEBT), 2 cryomodules accelerating the beam to 16 MeV and a High-Energy Beam Transport (HEBT) bringing the beam to a dump. This paper presents beam dynamics - related measurements performed at PIP2IT such as the Twiss parameters with Allison scanners, beam envelopes along the injector, and transverse and longitudinal rms emittance reconstruction. These measurements are compared with predictions from the beam dynamics code Tracewin.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1883586
- Report Number(s):
- FERMILAB-CONF-22-630-AD-PIP2; arXiv:2208.11753; oai:inspirehep.net:2141962
- Resource Relation:
- Journal Volume: 34; Journal Issue: 36
- Country of Publication:
- United States
- Language:
- English
Similar Records
Status of the Warm Front End of PIP-II Injector Test
Experimental Study of Beam Dynamics in the PIP-II MEBT Prototype