Recommendations on ILC Project Implementation
- Univ. of Bonn (Germany)
- Univ. of California, Irvine, CA (United States)
- Tata Inst. of Fundamental Research, Bombay (India)
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- High Energy Accelerator Research Organization (KEK), Tsukuba (Japan)
- Marseille, CPPM (France)
- Kyushu Univ., Fukuoka (Japan)
- Tokyo Univ. of Science, Chiba (Japan)
The International Linear Collider (ILC) is a next-generation experimental facility to explore fundamental laws of the Universe. The importance of electron-positron linear colliders as a future experimental facility has been long recognized by the worldwide high energy physics community. A global design team, the Global Design Efforts (GDE), was set up under the International Committee for Future Accelerators (ICFA) for design and coordination of R&D activities of the ILC in 2005, and the ILC Technical Design Report (TDR) was completed in 2013. ICFA then established the Linear Collider Collaboration (LCC) and the Linear Collider Board (LCB) and has continued to support the worldwide efforts for realizing the ILC. Meanwhile, in 2012, KEK and the high energy physics community in Japan proposed that Japan should host the ILC, which was welcomed by the worldwide high energy physics community. Implementation of the ILC project will require strong involvements from international partners due to its scientific importance and large scale. Aspects of international cost sharing and governance of the organization carrying out the ILC project will need to be discussed and agreed at the governmental level. Therefore, KEK established an International Working Group (WG) on the ILC Project in May 2019, inviting scientific experts worldwide* , and asking them to study international aspects of the project implementation from viewpoints of researchers. They were requested to create a report on model of international cost sharing for construction and operation, organization and governance of the ILC Laboratory, and international sharing of the remaining technical preparation. The WG report was submitted to KEK on September 25, 2019. After reviewing the content of the report, KEK decided to make it available within this document entitled “Recommendations on ILC Project Implementation”. This document summarizes the deliberations from researchers’ viewpoints; it does not intend to pre-empt governments and funding agencies. It is hoped that it will be helpful for discussions among governments and funding agencies.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP)
- Contributing Organization:
- KEK International Working Group
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1833577
- Report Number(s):
- FERMILAB-TM-2769-DI; oai:inspirehep.net:1757357; TRN: US2302107
- Country of Publication:
- United States
- Language:
- English
Similar Records
Governance of the International Linear Collider Project
The ILC engineering design phase: Towards the production of an engineering design report