Title: Field demonstration of two pneumatic backfilling technologies

Book ·
OSTI ID:175934

This US Bureau of Mines (USBM) report summarizes a field demonstration of pneumatic backfilling technologies conducted at the abandoned Hillside Coal and Iron Slope in Vandling, PA. Researchers demonstrated two pneumatic backfilling technologies recently developed under the USBM`s Abandoned Mine Reclamation Research Program, the Pneumatic Pipefeeder and the High-Efficiency Ejector. Both systems had previously been evaluated at the USBM`s subsidence abatement investigation laboratory near Fairchance, PA. The objective of the demonstration was to fill 100% of the abandoned tunnel with backfill stone to prevent further subsidence. The pneumatic Pipefeeder was used for 21 days, at a rate of 63 to 124 t/d (69 to 136 st/d), to fill 88% of the tunnel. The High-Efficiency Ejector was used for 2 days, at a rate of 125 to 132 T/d (138 to 146 st/d) to fill the remaining 12% of the tunnel. The backfill placed by both systems was tightly compacted. The major problem encountered was wear on the polyethylene pipeline from the abrasion of the high-velocity backfill. The use of heavier steel pipe minimized the problem. A cost analysis for the entire project is given.

OSTI ID:
175934
Resource Relation:
Other Information: PBD: 1995
Country of Publication:
United States
Language:
English

Similar Records

Speedy backfilling for old mines
Journal Article · Wed Sep 01 00:00:00 EDT 1993 · Civil Engineering ASCE; (United States) · OSTI ID:175934

Reclaiming orphaned lands using a pneumatic backfill process
Conference · Sat Jan 01 00:00:00 EST 1983 · OSTI ID:175934

State-of-the-art techniques for backfilling abandoned mine voids
Journal Article · Fri Jan 01 00:00:00 EST 1993 · Information Circular - United States, Bureau of Mines; (United States) · OSTI ID:175934