Title: Quarterly environmental radiological survey summary - first quarter 1997 100, 200, 300, and 600 areas

Abstract

This report provides a summary of the radiological surveys performed in support of near-facility environmental monitoring at the Hanford Site. The First Quarter 1997 survey results and the status of actions required are summarized below: (1) All of the routine environmental radiological surveys scheduled during January, February, and March 1997, were performed as planned. (2) One hundred four environmental radiological surveys were performed during the first quarter 1997, twenty-nine at the active waste sites and seventy-five at the inactive waste sites. Contamination above background levels was found at eight of the active waste sites and seven of the inactive waste sites. Contamination levels as high as >1,000,000 disintegrations per minute (dpm) were reported. Of these contaminated surveys twelve were in Underground Radioactive Material (URM) areas and three were in contamination areas. The contamination found within ten of the URM areas was immediately cleaned up and no further action was required. In the remaining five sites the areas were posted and will require decontamination. Radiological Problem Reports (RPR's) were issued and the sites were turned over to the landlord for further action if required. (3) During the first quarter of 1997, 5.6 hectares (13.8 acres) were stabilized and radiologically down postedmore » from Contamination Area (CA)/Soil Contamination (SC) to URM. (4) During the first quarter of 1997, the size of 216-A-25 Gable Mountain Pond was increased from 30.4 to 34.5 hectares (75.0 to 85.2 acres). This increase in size was due to the correction of the original boundary area by using the advanced technology of a global positioning system (GPS). An area, 1.6 hectares (4.0 acres), east of and adjacent to the 241-S/SX/SY tank farm complex was posted as a contamination/soil contamination area. (5) Five open Surveillance Compliance Inspection Reports (SCIRs) had not been resolved.« less

Authors:
Publication Date:
Sponsoring Org.:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (US)
OSTI Identifier:
16919
Report Number(s):
HNF-SP-0665-24; ON: DE98059765; BR: EW3120100
ON: DE98059765; BR: EW3120100; TRN: US0111112
DOE Contract Number:
AC06-96RL13200
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 23 Apr 1997; Supercedes report DE98059765; PBD: 23 Apr 1997
Country of Publication:
United States
Language:
English
Subject:
11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS; 12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; RADIATION MONITORING; HANFORD RESERVATION; ENVIRONMENTAL QUALITY; SETTLING PONDS; RADIOACTIVE MATERIALS; STORAGE FACILITIES; RADIOACTIVE WASTE FACILITIES

Citation Formats

Mckinney, S.M. Quarterly environmental radiological survey summary - first quarter 1997 100, 200, 300, and 600 areas. United States: N. p., 1997. Web. doi:10.2172/16919.
Mckinney, S.M. Quarterly environmental radiological survey summary - first quarter 1997 100, 200, 300, and 600 areas. United States. doi:10.2172/16919.
Mckinney, S.M. Wed . "Quarterly environmental radiological survey summary - first quarter 1997 100, 200, 300, and 600 areas". United States. doi:10.2172/16919. https://www.osti.gov/servlets/purl/16919.
@article{osti_16919,
title = {Quarterly environmental radiological survey summary - first quarter 1997 100, 200, 300, and 600 areas},
author = {Mckinney, S.M.},
abstractNote = {This report provides a summary of the radiological surveys performed in support of near-facility environmental monitoring at the Hanford Site. The First Quarter 1997 survey results and the status of actions required are summarized below: (1) All of the routine environmental radiological surveys scheduled during January, February, and March 1997, were performed as planned. (2) One hundred four environmental radiological surveys were performed during the first quarter 1997, twenty-nine at the active waste sites and seventy-five at the inactive waste sites. Contamination above background levels was found at eight of the active waste sites and seven of the inactive waste sites. Contamination levels as high as >1,000,000 disintegrations per minute (dpm) were reported. Of these contaminated surveys twelve were in Underground Radioactive Material (URM) areas and three were in contamination areas. The contamination found within ten of the URM areas was immediately cleaned up and no further action was required. In the remaining five sites the areas were posted and will require decontamination. Radiological Problem Reports (RPR's) were issued and the sites were turned over to the landlord for further action if required. (3) During the first quarter of 1997, 5.6 hectares (13.8 acres) were stabilized and radiologically down posted from Contamination Area (CA)/Soil Contamination (SC) to URM. (4) During the first quarter of 1997, the size of 216-A-25 Gable Mountain Pond was increased from 30.4 to 34.5 hectares (75.0 to 85.2 acres). This increase in size was due to the correction of the original boundary area by using the advanced technology of a global positioning system (GPS). An area, 1.6 hectares (4.0 acres), east of and adjacent to the 241-S/SX/SY tank farm complex was posted as a contamination/soil contamination area. (5) Five open Surveillance Compliance Inspection Reports (SCIRs) had not been resolved.},
doi = {10.2172/16919},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Wed Apr 23 00:00:00 EDT 1997},
month = {Wed Apr 23 00:00:00 EDT 1997}
}

Technical Report:

Save / Share: