skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Spent nuclear fuel project multi-year work plan WBS {number_sign}1.4.1

Abstract

The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency.

Authors:
Publication Date:
Research Org.:
Hanford Site (HNF), Richland, WA
Sponsoring Org.:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (US)
OSTI Identifier:
16913
Report Number(s):
HNF-SP-1104-Rev 4
ON: DE98059758; BR: EW3135040; TRN: US0111106
DOE Contract Number:  
AC06-96RL13200
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 01 Mar 1997; Supercedes report DE98059758; PBD: 1 Mar 1997
Country of Publication:
United States
Language:
English
Subject:
11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS; 12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; SPENT FUELS; PROGRAM MANAGEMENT; DOCUMENTATION; SCHEDULES; RADIOACTIVE WASTE MANAGEMENT

Citation Formats

Wells, J.L.. Spent nuclear fuel project multi-year work plan WBS {number_sign}1.4.1. United States: N. p., 1997. Web. doi:10.2172/16913.
Wells, J.L.. Spent nuclear fuel project multi-year work plan WBS {number_sign}1.4.1. United States. doi:10.2172/16913.
Wells, J.L.. Sat . "Spent nuclear fuel project multi-year work plan WBS {number_sign}1.4.1". United States. doi:10.2172/16913. https://www.osti.gov/servlets/purl/16913.
@article{osti_16913,
title = {Spent nuclear fuel project multi-year work plan WBS {number_sign}1.4.1},
author = {Wells, J.L.},
abstractNote = {The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency.},
doi = {10.2172/16913},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Sat Mar 01 00:00:00 EST 1997},
month = {Sat Mar 01 00:00:00 EST 1997}
}

Technical Report:

Save / Share: