skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Interaction region vacuum system design at the PEP-II B factory

Conference ·
OSTI ID:16393

The Interaction Region Vacuum System in the PEP-II B-Factory at SLAC must produce average pressures in the 10{sup -10} Torr range. low beamline pressures will minimize the background radiation encountered by the BaBar Detector A combination of copper and stainless steel vacuum chambers with continuous antechambers are used to make up the beam tubes. Linear Non-Evaporable Getter (NEG) pumps are used to produce distributed pumping along the length of these beam tubes. High conductance microwave type screens provide RF shields between the beam aperture and the NEG pumps. In this paper the design features of the beam tubes, NEG pumps, and RF pump screens are described and the vacuum and impedance analyses conducted in support of the design are discussed.

Sponsoring Organization:
(US)
DOE Contract Number:
W-7405-Eng-48
OSTI ID:
16393
Report Number(s):
UCRL-JC-128067; CONF-970503*-; ON: DE98051012; TRN: US200302%%631
Resource Relation:
Conference: 1997 Particle Accelerator Conference, Vancouver, BC (CA), 05/12/1997--05/16/1997; Other Information: Supercedes report DE98051012; PBD: 21 Jul 97; PBD: 21 Jul 1997
Country of Publication:
United States
Language:
English

Similar Records

Design of the linear non-evaporable getter pump for the PEP-II B factory
Conference · Mon Jul 21 00:00:00 EDT 1997 · OSTI ID:16393

Effect of TE Mode Power on the PEP II LER BPM System
Conference · Fri Aug 26 00:00:00 EDT 2011 · Conf.Proc.C970512:2116,1997 · OSTI ID:16393

Status Report and Future Plans for the PEP-II B Factory
Technical Report · Thu Apr 12 00:00:00 EDT 2001 · OSTI ID:16393