Title: TEAM (Technologies Enabling Agile Manufacturing) macro planner requirements guide: Version 1.0

Technical Report ·
DOI:https://doi.org/10.2172/161469· OSTI ID:161469

The Macro Planner will provide required resource identities, bill of material list, routing sequences and identities of all supporting information to the Shop Floor Control System to enable the actual manufacturing activities. The Macro Planner must also collect manufacturing performance data from the shop floor to effectively measure the plan`s performance. The critical feedback will be evaluated during closure of the business cycle and provide the metrics on cost and quality to the planning function. This document is intended to describe the requirements for a Macro Planner system which supports the above environment. The Macro planner should progress to a logically, rule driven processor to automate major portions of the planning cycle. It should do the following: support concurrent product/process design; define a globally optimized manufacturing plan for realization of product; compile a complete manufacturing plan script (routing and operational detail documentation); be based on 3-D CAD models imported via STEP standards; and define an Enterprise Resource Base that maps manufacturing capabilities to component features.

Research Organization:
Oak Ridge Y-12 Plant (Y-12), Oak Ridge, TN (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC05-84OR21400
OSTI ID:
161469
Report Number(s):
Y/DX-2289; ON: DE96003429; TRN: AHC29601%%24
Resource Relation:
Other Information: PBD: 28 Mar 1995