This paper will describe the span avoidance measures taken for the installation of the Garden Banks 388 deepwater oil and gas gathering pipelines. The two 12 inch pipelines connect a shallow water facility in EI-315 to a deep water subsea template in GB-388. These pipelines run across the irregular continental slope typically found in moderate to deep water in the Gulf of Mexico. To minimize pipeline spans, steps were taken during design, survey, and installation phases of the project. During each phase, as additional information became available, analyses and resulting recommended approaches were refined. This continuity, seldom easily obtained, proved beneficial in translating design work into field results.
- OSTI ID:
- 160753
- Report Number(s):
- CONF-950501-; TRN: IM9603%%335
- Resource Relation:
- Conference: 27. offshore technology conference, Houston, TX (United States), 1-4 May 1995; Other Information: PBD: 1995; Related Information: Is Part Of 27. Annual Offshore Technology Conference: 1995 Proceedings. Volume 3: Construction and installation/field drilling and development systems; PB: 591 p.
- Country of Publication:
- United States
- Language:
- English
Similar Records
Design, fabrication, and integration testing of the Garden Banks 388 subsea production template
Garden Banks 388 subsea drilling/production template: Project management of a fast-track project