skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: LBNF CMGC Delivery Method: ICE Process

Abstract

The Construction Manager/General Contractor (CM/GC) delivery method is intended to benefit the design process, value engineering, risk mitigation, and schedule optimization while promoting construction and design innovation. This delivery method is particularly suited for complex projects that require significant consideration of contractor means and methods. Fermilab’s Far Site Conventional Facilities proceeded with a CM/GC delivery method to account for the unique conditions of excavating over 300,000 cubic yards of rock in tunnels and caverns that will be constructed approximately 5000-ft deep in the repurposed Homestake Mine in Lead, SD. The experiences of the Independent Cost Estimating (ICE) process are presented.

Authors:
 [1]; ; ;
  1. Fermilab
Publication Date:
Research Org.:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Org.:
USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
Contributing Org.:
DUNE
OSTI Identifier:
1605572
Report Number(s):
FERMILAB-CONF-19-641-LBNF
oai:inspirehep.net:1787004
DOE Contract Number:  
AC02-07CH11359
Resource Type:
Conference
Country of Publication:
United States
Language:
English

Citation Formats

Pelletier, Douglas, Thompson, Andy, DiFore, Ben, and Wallace, Jeff F. LBNF CMGC Delivery Method: ICE Process. United States: N. p., 2020. Web.
Pelletier, Douglas, Thompson, Andy, DiFore, Ben, & Wallace, Jeff F. LBNF CMGC Delivery Method: ICE Process. United States.
Pelletier, Douglas, Thompson, Andy, DiFore, Ben, and Wallace, Jeff F. Thu . "LBNF CMGC Delivery Method: ICE Process". United States. https://www.osti.gov/servlets/purl/1605572.
@article{osti_1605572,
title = {LBNF CMGC Delivery Method: ICE Process},
author = {Pelletier, Douglas and Thompson, Andy and DiFore, Ben and Wallace, Jeff F.},
abstractNote = {The Construction Manager/General Contractor (CM/GC) delivery method is intended to benefit the design process, value engineering, risk mitigation, and schedule optimization while promoting construction and design innovation. This delivery method is particularly suited for complex projects that require significant consideration of contractor means and methods. Fermilab’s Far Site Conventional Facilities proceeded with a CM/GC delivery method to account for the unique conditions of excavating over 300,000 cubic yards of rock in tunnels and caverns that will be constructed approximately 5000-ft deep in the repurposed Homestake Mine in Lead, SD. The experiences of the Independent Cost Estimating (ICE) process are presented.},
doi = {},
journal = {},
number = ,
volume = ,
place = {United States},
year = {2020},
month = {3}
}

Conference:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that hold this conference proceeding.

Save / Share: