skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Update to the Long-Term Monitoring System Design Report for USDOE/NNSA Pantex Plant Groundwater Remedial Action Progress

Abstract

This report presents proposed modifications to the long-term groundwater monitoring well network that was originally developed in 2009 and updated in 2014. The original network was developed using statistical methods, fate and transport modeling, and site-specific knowledge for the evaluation of response actions (corrective/remedial actions) for Pantex Plant and monitoring uncertainties near source areas. The 2014 update was based on an evaluation of perched aquifer monitoring system and data collected during the first Five-Year Review, as well as updated expected conditions based on changing aquifer. Similarly, this update proposes modifications based on an evaluation of the perched aquifer monitoring system during the second Five-Year Review along with updated expected conditions based on changing aquifer conditions.

Publication Date:
Research Org.:
Pantex Plant (PTX), Amarillo, TX (United States)
Sponsoring Org.:
USDOE
Contributing Org.:
Consolidated Nuclear Security, LLC; Carollo Engineers, Inc.
OSTI Identifier:
1583132
Report Number(s):
AL-PX-SW-8419; IROS12861
DOE Contract Number:  
DE-NA0001942
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
54 ENVIRONMENTAL SCIENCES

Citation Formats

. Update to the Long-Term Monitoring System Design Report for USDOE/NNSA Pantex Plant Groundwater Remedial Action Progress. United States: N. p., 2019. Web. doi:10.2172/1583132.
. Update to the Long-Term Monitoring System Design Report for USDOE/NNSA Pantex Plant Groundwater Remedial Action Progress. United States. doi:10.2172/1583132.
. Thu . "Update to the Long-Term Monitoring System Design Report for USDOE/NNSA Pantex Plant Groundwater Remedial Action Progress". United States. doi:10.2172/1583132. https://www.osti.gov/servlets/purl/1583132.
@article{osti_1583132,
title = {Update to the Long-Term Monitoring System Design Report for USDOE/NNSA Pantex Plant Groundwater Remedial Action Progress},
author = {},
abstractNote = {This report presents proposed modifications to the long-term groundwater monitoring well network that was originally developed in 2009 and updated in 2014. The original network was developed using statistical methods, fate and transport modeling, and site-specific knowledge for the evaluation of response actions (corrective/remedial actions) for Pantex Plant and monitoring uncertainties near source areas. The 2014 update was based on an evaluation of perched aquifer monitoring system and data collected during the first Five-Year Review, as well as updated expected conditions based on changing aquifer. Similarly, this update proposes modifications based on an evaluation of the perched aquifer monitoring system during the second Five-Year Review along with updated expected conditions based on changing aquifer conditions.},
doi = {10.2172/1583132},
journal = {},
number = ,
volume = ,
place = {United States},
year = {2019},
month = {8}
}