Title: Experience with Long-Pulse Operation of the PIP2IT Warm Front End

Abstract

The warm front end of the PIP2IT accelerator, assem-bled and commissioned at Fermilab, consists of a 15 mA DC, 30 keV H- ion source, a 2 m long Low Energy Beam Transport (LEBT) line, and a 2.1 MeV, 162.5 MHz CW RFQ, followed by a 10 m long Medium Energy Beam Transport (MEBT) line. A part of the commissioning efforts involves operation with the average beam power emulating the operation of the proposed PIP-II accelera-tor, which will have a duty factor of 1.1% or above. The maximum achieved power is 5 kW (2.1 MeV x 5 mA x 25 ms x 20 Hz). This paper describes the difficulties encoun-tered and some of the solutions that were implemented.

Authors:
ORCiD logo [1];  [1];  [1];  [1];  [1];  [1];  [1];  [1];  [1];  [1];  [1];  [1];  [2]
  1. Fermilab
  2. Michigan State U.
Publication Date:
Research Org.:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Org.:
USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
Contributing Org.:
PIP-II
OSTI Identifier:
1565925
Report Number(s):
FERMILAB-CONF-19-439-AD
oai:inspirehep.net:1755019
DOE Contract Number:  
AC02-07CH11359
Resource Type:
Conference
Resource Relation:
Conference: 3rd North American Particle Accelerator Conference (NAPAC2019), Lansing, Michigan, 09/01-09/06/2019
Country of Publication:
United States
Language:
English
Subject:
43 PARTICLE ACCELERATORS

Citation Formats

Shemyakin, A., Carneiro, J.-P., Chen, A., Frolov, D., Hanna, B., Neswold, R., Prost, L., Saewert, G., Saini, A., Scarpine, V., Warner, A., Wu, J.-Y., and Richard, C. Experience with Long-Pulse Operation of the PIP2IT Warm Front End. United States: N. p., 2019. Web.
Shemyakin, A., Carneiro, J.-P., Chen, A., Frolov, D., Hanna, B., Neswold, R., Prost, L., Saewert, G., Saini, A., Scarpine, V., Warner, A., Wu, J.-Y., & Richard, C. Experience with Long-Pulse Operation of the PIP2IT Warm Front End. United States.
Shemyakin, A., Carneiro, J.-P., Chen, A., Frolov, D., Hanna, B., Neswold, R., Prost, L., Saewert, G., Saini, A., Scarpine, V., Warner, A., Wu, J.-Y., and Richard, C. Sun . "Experience with Long-Pulse Operation of the PIP2IT Warm Front End". United States. https://www.osti.gov/servlets/purl/1565925.
@article{osti_1565925,
title = {Experience with Long-Pulse Operation of the PIP2IT Warm Front End},
author = {Shemyakin, A. and Carneiro, J.-P. and Chen, A. and Frolov, D. and Hanna, B. and Neswold, R. and Prost, L. and Saewert, G. and Saini, A. and Scarpine, V. and Warner, A. and Wu, J.-Y. and Richard, C.},
abstractNote = {The warm front end of the PIP2IT accelerator, assem-bled and commissioned at Fermilab, consists of a 15 mA DC, 30 keV H- ion source, a 2 m long Low Energy Beam Transport (LEBT) line, and a 2.1 MeV, 162.5 MHz CW RFQ, followed by a 10 m long Medium Energy Beam Transport (MEBT) line. A part of the commissioning efforts involves operation with the average beam power emulating the operation of the proposed PIP-II accelera-tor, which will have a duty factor of 1.1% or above. The maximum achieved power is 5 kW (2.1 MeV x 5 mA x 25 ms x 20 Hz). This paper describes the difficulties encoun-tered and some of the solutions that were implemented.},
doi = {},
journal = {},
number = ,
volume = ,
place = {United States},
year = {2019},
month = {9}
}

Conference:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that hold this conference proceeding.

Save / Share: