Title: Guidelines on Microgrid Preliminary Design Specification.

Abstract

' The following document provides guidance for developing a preliminary microgrid design specification that can be used to support a request for information (RFI) or a request for proposal (RFP), referred to as procurement documents. Typically, this step builds on analysis and conceptual design steps previously conducted in coordination with key stakeholders. This document outlines the functional requirements and recommendations that microgrid integrators need to consider during the final design and construction process. In addition to the project scope and technical requirements, the RFP needs to specify the process to evaluate the prospective bidders and the process for down selection. y 'c 3 Do NOT DISTRIBUTE UNTIL FINALIZED

Authors:
; ;
Publication Date:
Research Org.:
Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)
Sponsoring Org.:
USDOE National Nuclear Security Administration (NNSA)
OSTI Identifier:
1561791
Report Number(s):
SAND2019-10563
679165
DOE Contract Number:  
AC04-94AL85000
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English

Citation Formats

Ellis, Abraham, Baca, Michael J., and Broderick, Robert Joseph. Guidelines on Microgrid Preliminary Design Specification.. United States: N. p., 2019. Web. doi:10.2172/1561791.
Ellis, Abraham, Baca, Michael J., & Broderick, Robert Joseph. Guidelines on Microgrid Preliminary Design Specification.. United States. doi:10.2172/1561791.
Ellis, Abraham, Baca, Michael J., and Broderick, Robert Joseph. Sun . "Guidelines on Microgrid Preliminary Design Specification.". United States. doi:10.2172/1561791. https://www.osti.gov/servlets/purl/1561791.
@article{osti_1561791,
title = {Guidelines on Microgrid Preliminary Design Specification.},
author = {Ellis, Abraham and Baca, Michael J. and Broderick, Robert Joseph},
abstractNote = {' The following document provides guidance for developing a preliminary microgrid design specification that can be used to support a request for information (RFI) or a request for proposal (RFP), referred to as procurement documents. Typically, this step builds on analysis and conceptual design steps previously conducted in coordination with key stakeholders. This document outlines the functional requirements and recommendations that microgrid integrators need to consider during the final design and construction process. In addition to the project scope and technical requirements, the RFP needs to specify the process to evaluate the prospective bidders and the process for down selection. y 'c 3 Do NOT DISTRIBUTE UNTIL FINALIZED},
doi = {10.2172/1561791},
journal = {},
number = ,
volume = ,
place = {United States},
year = {2019},
month = {9}
}