skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: An Ensemble Optimization Framework for Coupled Design of Hydropower Contracts and Real-Time Reservoir Operating Rules

Journal Article · · Water Resources Research
DOI:https://doi.org/10.1029/2018wr022753· OSTI ID:1559149

Often, revenues from hydropower generation depend on the operator's ability to provide firm power in the presence of uncertain inflows. The primary options available for optimizing revenue are negotiation of a firm power contract before operations begin and adjustment of the reservoir release during operations. Contract and release strategy optimization are closely coupled and most appropriately analyzed with stochastic real-time control methods. Here we use an ensemble-based approach to stochastic optimization that provides a convenient way to construct nonparametric revenue probability distributions to explore the implications of uncertainty. The firm power contract is a simplified bilateral fixed price agreement that partially insulates operator and buyer from price fluctuations. The release control laws and firm energy target are jointly optimized to maximize the operator's expected revenue. Revenue probability distributions and related spill performance statistics indicate that predictive operating strategies such as stochastic dynamic programming and model predictive control can give significantly better performance than standard deterministic operating rules. The performance obtained from batch optimization with perfect inflow information establishes a convenient upper bound on potential revenue and provides a baseline for assessing the significance of differences between real-time operating strategies. Sensitivity analysis indicates that the benefits of predictive operational strategies are greatest for reservoirs with medium nondimensional residence times and less important for reservoirs with large residence times. Overall, probabilistic analysis of the coupled hydropower contract-operations problem provides a realistic way to assess revenue and risk for reservoirs that must provide firm power when inflows are uncertain.

Research Organization:
Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)
Sponsoring Organization:
USDOE Office of Science (SC); Abdul Latif Jameel World Water and Food Security Laboratory
Grant/Contract Number:
AC02-05CH11231
OSTI ID:
1559149
Journal Information:
Water Resources Research, Vol. 54, Issue 10; ISSN 0043-1397
Publisher:
American Geophysical Union (AGU)Copyright Statement
Country of Publication:
United States
Language:
English
Citation Metrics:
Cited by: 4 works
Citation information provided by
Web of Science

References (32)

Dynamic Programming and Lagrange Multipliers journal October 1956
A model predictive control strategy for supply chain optimization journal September 2003
Many objective visual analytics: rethinking the design of complex engineered systems journal February 2013
Reservoir‐System Simulation and Optimization Models journal July 1993
Estimating Linear Time-invariant Models of Nonlinear Time-varying Systems journal January 2001
Dependence of hydropower energy generation on forests in the Amazon Basin at local and regional scales journal May 2013
Mitigating hydrologic financial risk in hydropower generation using index-based financial instruments journal April 2015
A model-predictive controller for optimal hydro-power utilization of river reservoirs conference September 2010
Multiple Model Predictive Control on a drainage canal system journal May 2008
Hedging rule for reservoir operations: 2. A numerical model: HEDGING RULE-2. A NUMERICAL MODEL journal January 2008
Integrated risk management of hydro power scheduling and contract management journal May 2001
Constrained model predictive control: Stability and optimality journal June 2000
Flood regulation using nonlinear model predictive control journal October 2010
Optimization of a large-scale water reservoir network by stochastic dynamic programming with efficient state space discretization journal June 2006
Optimization of the Operation of a Multiple-Purpose Reservoir by Dynamic Programming journal June 1968
Distributed model predictive control of irrigation canals journal June 2009
Optimal hydro scheduling and offering strategies considering price uncertainty and risk management journal January 2012
Optimization of Reservoir Management and Operation with Hedging Rules journal March 2003
Efficient sampling in approximate dynamic programming algorithms journal June 2007
Simulation–Optimization Modeling: A Survey and Potential Application in Reservoir Systems Operation journal July 2009
Optimal Stochastic Operation of Salt River Project, Arizona journal September 1991
Auctions of contracts and energy call options to ensure supply adequacy in the second stage of the Brazilian power sector reform conference January 2006
A survey of industrial model predictive control technology journal July 2003
Dynamic programming applications in water resources journal August 1982
Model predictive control: Theory and practice—A survey journal May 1989
Reservoir Management and Operations Models: A State-of-the-Art Review journal December 1985
Medium Term Power Planning With Bilateral Contracts journal May 2005
Dual effect, certainty equivalence, and separation in stochastic control journal October 1974
Optimal Operation of Multireservoir Systems: State-of-the-Art Review journal March 2004
Neuro-dynamic programming for designing water reservoir network management policies journal August 2007
Improved Dynamic Programming for Hydropower Reservoir Operation journal March 2014
Numerical Solution of Continuous-State Dynamic Programs Using Linear and Spline Interpolation journal June 1993