Title: 250 kWt Pilot Testing in Support of a 10 MWe Coal-Direct Chemical Looping Demonstration Feasibility Study

Abstract

The Babcock & Wilcox Company and The Ohio State University have constructed a 250 kWt coal direct chemical looping pilot facility at the Babcock & Wilcox Research Center in Barberton, Ohio. Testing was conducted on the facility to support installation of a 10 MWe coal direct chemical looping large pilot facility at the Dover Light & Power Plant in Dover, Ohio. Results of the testing and their impact on the design of the large pilot facility are discussed.

Authors:
 [1];  [1];  [2];  [3];  [2];  [2]
  1. The Babcock & Wilcox Company 20 South Van Buren Avenue Barberton, Ohio 44203
  2. The Ohio State University 134 Woodruff Avenue Columbus, Ohio 43210
  3. The Oho State University 134 Woodruff Avenue Columbus, Ohio 43210
Publication Date:
Research Org.:
The Babcock & Wilcox Company
Sponsoring Org.:
USDOE Office of Fossil Energy (FE)
Contributing Org.:
The Ohio State University
OSTI Identifier:
1542916
Report Number(s):
Technical Paper 94
DE-FOA-0001788
DOE Contract Number:  
FE0031582
Resource Type:
Conference
Resource Relation:
Conference: 44th International Technical Conference on Clean Energy; Clearwater, Florida; June 16-21,2019
Country of Publication:
United States
Language:
English
Subject:
20 FOSSIL-FUELED POWER PLANTS; chemical looping; iron-based metal oxide; pilot plant; bituminous coal; Dover Light & Power; carbon capture

Citation Formats

Flynn, Thomas J., Velazquez-Vargas, Luis G., Bao, Jinhua, Zhang, Yitao, Tong, Andrew, and Fan, Liang-Shih. 250 kWt Pilot Testing in Support of a 10 MWe Coal-Direct Chemical Looping Demonstration Feasibility Study. United States: N. p., 2019. Web.
Flynn, Thomas J., Velazquez-Vargas, Luis G., Bao, Jinhua, Zhang, Yitao, Tong, Andrew, & Fan, Liang-Shih. 250 kWt Pilot Testing in Support of a 10 MWe Coal-Direct Chemical Looping Demonstration Feasibility Study. United States.
Flynn, Thomas J., Velazquez-Vargas, Luis G., Bao, Jinhua, Zhang, Yitao, Tong, Andrew, and Fan, Liang-Shih. Wed . "250 kWt Pilot Testing in Support of a 10 MWe Coal-Direct Chemical Looping Demonstration Feasibility Study". United States. https://www.osti.gov/servlets/purl/1542916.
@article{osti_1542916,
title = {250 kWt Pilot Testing in Support of a 10 MWe Coal-Direct Chemical Looping Demonstration Feasibility Study},
author = {Flynn, Thomas J. and Velazquez-Vargas, Luis G. and Bao, Jinhua and Zhang, Yitao and Tong, Andrew and Fan, Liang-Shih},
abstractNote = {The Babcock & Wilcox Company and The Ohio State University have constructed a 250 kWt coal direct chemical looping pilot facility at the Babcock & Wilcox Research Center in Barberton, Ohio. Testing was conducted on the facility to support installation of a 10 MWe coal direct chemical looping large pilot facility at the Dover Light & Power Plant in Dover, Ohio. Results of the testing and their impact on the design of the large pilot facility are discussed.},
doi = {},
journal = {},
number = ,
volume = ,
place = {United States},
year = {2019},
month = {6}
}

Conference:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that hold this conference proceeding.

Save / Share: