Title: Construction Specification Section 01810 Facility Commissioning Requirements (Revised Version)

Abstract

The purpose of the commissioning process for this project is to provide SNL assurance that equipment/systems have been provided as required, installed in the prescribed manner and operate in compliance with SNL project requirements, basis of design, contract documentation, and operational needs. In addition, commissioning provides SNL assurance that any special safety engineered features to prevent or control the accidental release of hazardous energy operate appropriately. Commissioning is intended to enhance the quality of system startup, operation and aid in the orderly and timely transfer of fully functioning systems.

Authors:
 [1]
  1. Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)
Publication Date:
Research Org.:
Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)
Sponsoring Org.:
USDOE National Nuclear Security Administration (NNSA)
OSTI Identifier:
1531332
Report Number(s):
SAND-2014-18072R
670324
DOE Contract Number:  
AC04-94AL85000
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English

Citation Formats

Peterson, Timothy L. Construction Specification Section 01810 Facility Commissioning Requirements (Revised Version). United States: N. p., 2014. Web. doi:10.2172/1531332.
Peterson, Timothy L. Construction Specification Section 01810 Facility Commissioning Requirements (Revised Version). United States. doi:10.2172/1531332.
Peterson, Timothy L. Tue . "Construction Specification Section 01810 Facility Commissioning Requirements (Revised Version)". United States. doi:10.2172/1531332. https://www.osti.gov/servlets/purl/1531332.
@article{osti_1531332,
title = {Construction Specification Section 01810 Facility Commissioning Requirements (Revised Version)},
author = {Peterson, Timothy L.},
abstractNote = {The purpose of the commissioning process for this project is to provide SNL assurance that equipment/systems have been provided as required, installed in the prescribed manner and operate in compliance with SNL project requirements, basis of design, contract documentation, and operational needs. In addition, commissioning provides SNL assurance that any special safety engineered features to prevent or control the accidental release of hazardous energy operate appropriately. Commissioning is intended to enhance the quality of system startup, operation and aid in the orderly and timely transfer of fully functioning systems.},
doi = {10.2172/1531332},
journal = {},
number = ,
volume = ,
place = {United States},
year = {2014},
month = {9}
}