skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Updated Costs (June 2011 Basis) for Selected Bituminous Baseline Cases

Technical Report ·
DOI:https://doi.org/10.2172/1515270· OSTI ID:1515270
 [1];  [1];  [2]
  1. WorleyParsons Group, North Sydney, NSW (Australia)
  2. Booz Allen Hamilton, McLean, VA (United States)

The Cost and Performance Baseline for Fossil Energy Power Plants, Volume 1: Bituminous Coal and Natural Gas to Electricity (Nov 2010) establishes performance and cost data for fossil energy power systems, specifically integrated gasification combined cycle (IGCC) plants fueled with bituminous coal, pulverized coal (PC) plants fueled with bituminous coal, and natural gas combined cycle (NGCC) plants all with and without carbon capture and sequestration. The cost basis for that report was June 2007. This present report updates the cost of selected cases from that report to June 2011 dollars.

Research Organization:
National Energy Technology Laboratory (NETL), Pittsburgh, PA, Morgantown, WV, and Albany, OR (United States)
Sponsoring Organization:
USDOE Office of Fossil Energy (FE)
DOE Contract Number:
FE0004001
OSTI ID:
1515270
Report Number(s):
NETL/DOE-341/082312
Country of Publication:
United States
Language:
English