skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Plan of Action: JASPER Management Prestart Review (Surrogate Material Experiment)

Abstract

The Lawrence Livermore National Laboratory (LLNL) Joint Actinide Shock Physics Experimental Research (JASPER) Facility is being developed at the Nevada Test Site (NTS) to conduct shock physics experiments on special nuclear material and other actinide materials. JASPER will use a two-stage, light-gas gun to shoot projectiles at actinide targets. Projectile velocities will range from 1 to 8 km/s, inducing pressures in the target material up to 6 Mbar. The JASPER gas gun has been designed to match the critical dimensions of the two-stage, light-gas gun in Building 341 of LLNL. The goal in copying the LLNL gun design is to take advantage of the extensive ballistics database that exists and to minimize the effort spent on gun characterization in the initial facility start-up. A siting study conducted by an inter-Laboratory team identified Able Site in Area 27 of the NTS as the best location for the JASPER gas gun. Able Site consists of three major buildings that had previously been used to support the nuclear test program. In April 1999, Able Site was decommissioned as a Nuclear Explosive Assembly Facility and turned back to the DOE for other uses. Construction and facility modifications at Able Site to support the JASPERmore » project started in April 1999 and were completed in September 1999. The gas gun and the secondary confinement chamber (SCC) were installed in early 2000. During the year, all facility and operational systems were brought on line. Initial system integration demonstrations were completed in September 2000. The facility is anticipated to be operational by August 2001, and the expected life cycle for the facility is 10 years. LLNL Nevada Experiments and Operations (N) Program has established a Management Prestart Review (MPR) team to determine the readiness of the JASPER personnel and facilities to initiate surrogate-material experiments. The review coincides with the completion of authorization-basis documents and physical subsystems, which have undergone appropriate formal engineering design reviews. This MPR will affirm the quality of those reviews, their findings/resolutions, and will look most closely at systems integration requirements and demonstrations that will have undergone technical acceptance reviews before the formal MPR action. Closure of MPR findings will finalize requirements for a DOE/NV Real Estate/Operations Permit (REOP) for surrogate-material experiments. Upon completion of that experiment series and the establishment of capabilities for incorporating SNM into future experiments, the team will convene again as part of the process of authorizing those activities.« less

Authors:
Publication Date:
Research Org.:
Lawrence Livermore National Lab., CA (US)
Sponsoring Org.:
US Department of Energy (US)
OSTI Identifier:
15006162
Report Number(s):
UCRL-ID-140614-REV-1
TRN: US200405%%300
DOE Contract Number:
W-7405-ENG-48
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 5 Dec 2000
Country of Publication:
United States
Language:
English
Subject:
45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEFENSE; 99 GENERAL AND MISCELLANEOUS//MATHEMATICS, COMPUTING, AND INFORMATION SCIENCE; ACTINIDES; CLOSURES; CONFINEMENT; DESIGN; DIMENSIONS; LIFE CYCLE; MANAGEMENT; MODIFICATIONS; NEVADA TEST SITE; NUCLEAR EXPLOSIVES; PERSONNEL; PHYSICS; PROJECTILES; TARGETS

Citation Formats

Cooper, W E. Plan of Action: JASPER Management Prestart Review (Surrogate Material Experiment). United States: N. p., 2000. Web. doi:10.2172/15006162.
Cooper, W E. Plan of Action: JASPER Management Prestart Review (Surrogate Material Experiment). United States. doi:10.2172/15006162.
Cooper, W E. 2000. "Plan of Action: JASPER Management Prestart Review (Surrogate Material Experiment)". United States. doi:10.2172/15006162. https://www.osti.gov/servlets/purl/15006162.
@article{osti_15006162,
title = {Plan of Action: JASPER Management Prestart Review (Surrogate Material Experiment)},
author = {Cooper, W E},
abstractNote = {The Lawrence Livermore National Laboratory (LLNL) Joint Actinide Shock Physics Experimental Research (JASPER) Facility is being developed at the Nevada Test Site (NTS) to conduct shock physics experiments on special nuclear material and other actinide materials. JASPER will use a two-stage, light-gas gun to shoot projectiles at actinide targets. Projectile velocities will range from 1 to 8 km/s, inducing pressures in the target material up to 6 Mbar. The JASPER gas gun has been designed to match the critical dimensions of the two-stage, light-gas gun in Building 341 of LLNL. The goal in copying the LLNL gun design is to take advantage of the extensive ballistics database that exists and to minimize the effort spent on gun characterization in the initial facility start-up. A siting study conducted by an inter-Laboratory team identified Able Site in Area 27 of the NTS as the best location for the JASPER gas gun. Able Site consists of three major buildings that had previously been used to support the nuclear test program. In April 1999, Able Site was decommissioned as a Nuclear Explosive Assembly Facility and turned back to the DOE for other uses. Construction and facility modifications at Able Site to support the JASPER project started in April 1999 and were completed in September 1999. The gas gun and the secondary confinement chamber (SCC) were installed in early 2000. During the year, all facility and operational systems were brought on line. Initial system integration demonstrations were completed in September 2000. The facility is anticipated to be operational by August 2001, and the expected life cycle for the facility is 10 years. LLNL Nevada Experiments and Operations (N) Program has established a Management Prestart Review (MPR) team to determine the readiness of the JASPER personnel and facilities to initiate surrogate-material experiments. The review coincides with the completion of authorization-basis documents and physical subsystems, which have undergone appropriate formal engineering design reviews. This MPR will affirm the quality of those reviews, their findings/resolutions, and will look most closely at systems integration requirements and demonstrations that will have undergone technical acceptance reviews before the formal MPR action. Closure of MPR findings will finalize requirements for a DOE/NV Real Estate/Operations Permit (REOP) for surrogate-material experiments. Upon completion of that experiment series and the establishment of capabilities for incorporating SNM into future experiments, the team will convene again as part of the process of authorizing those activities.},
doi = {10.2172/15006162},
journal = {},
number = ,
volume = ,
place = {United States},
year = 2000,
month =
}

Technical Report:

Save / Share:
  • The Lawrence Livermore National Laboratory (LLNL) Joint Actinide Shock Physics Experimental Research (JASPER) Facility is being developed at the Nevada Test Site (NTS) to conduct shock physics experiments on special nuclear material and other actinide materials. JASPER will use a two-stage, light-gas gun to shoot projectiles at actinide targets. Projectile velocities will range from 1 to 8 km/s, inducing pressures in the target material up to 6 Mbar. The JASPER gas gun has been designed to match the critical dimensions of the two-stage, light-gas gun in Building 341 of LLNL. The goal in copying the LLNL gun design is tomore » take advantage of the extensive ballistics database that exists and to minimize the effort spent on gun characterization in the initial facility start-up. A siting study conducted by an inter-Laboratory team identified Able Site in Area 27 of the NTS as the best location for the JASPER gas gun. Able Site consists of three major buildings that had previously been used to support the nuclear test program. In April 1999, Able Site was decommissioned as a Nuclear Explosive Assembly Facility and turned back to the DOE for other uses. Construction and facility modifications at Able Site to support the JASPER project started in April 1999 and were completed in September 1999. The gas gun and the secondary confinement chamber (SCC) were installed in early 2000. During the year, all facility and operational systems were brought on line. Initial system integration demonstrations were completed in September 2000. The facility is anticipated to be operational by August 2001, and the expected life cycle for the facility is 10 years. LLNL Nevada Experiments and Operations (N) Program has established a Management Prestart Review (MPR) team to determine the readiness of the JASPER personnel and facilities to initiate surrogate-material experiments. The review coincides with the completion of authorization-basis documents and physical subsystems, which have undergone appropriate formal engineering design reviews. This MPR will affirm the quality of those reviews, their findings/resolutions, and will look most closely at systems integration requirements and demonstrations that will have undergone technical acceptance reviews before the formal MPR action. Closure of MPR findings will finalize requirements for a DOE/NV Real Estate/Operations Permit (REOP) for surrogate-material experiments. Upon completion of that experiment series and the establishment of capabilities for incorporating SNM into future experiments, the team will convene again as part of the process of authorizing those activities.« less
  • Able Site is located 24 km northwest of Mercury on the Nevada Test Site. The Nevada Test Site is approximately 105 km northwest of Las Vegas, NV. Major facilities at Able Site include Buildings 5100,5180, and 5191. Significant external interfaces for the JASPER site include the electrical system, wastewater system, communications systems, and water supply system, which provides both potable and fire-protection water. Support services, which are provided on the Nevada Test Site, include medical, emergency response (NTS Fire Department), radiation protection, industrial hygiene, and waste management. Although JASPER will ultimately be used for actinide research, the start-up process requiresmore » system demonstration using surrogates in place of the actinide targets. LLNL Nevada Experiments and Operations (N) Program has established a Management Prestart Review (MPR) team to determine the readiness of the JASPER personnel and facilities to initiate surrogate-material experiments. A second MPR will be conducted before actinide experiments are executed. This document addresses implementation requirements for only the first MPR. This first review coincides with the completion of authorization-basis documents and physical subsystems, which have undergone appropriate formal engineering design reviews. This MPR will affirm the quality of those reviews, their findings/resolutions, and will look most closely at systems integration requirements and demonstrations that will have undergone technical acceptance reviews before this formal MPR action. Closure of MPR findings will finalize requirements for a DOE/NV Real Estate/Operations Permit (REOP) for surrogate-material experiments. Upon completion of that experiment series and the establishment of capabilities for incorporating special nuclear material (SNM) into future experiments, the team will convene again as part of the process of authorizing those activities. A summary of the review schedule is provided.« less
  • A Management Prestart Review (MPR) for the National Ignition Facility (NIF) vacuum testing of spatial filters, the Cavity Spatial Filter (CSF) and the Transport Spatial Filter (TSF), was conducted during March 2001. The review was performed to determine the readiness of the Beamline Infrastucture System (BIS) team and the Integration Management and Installation (IMI) contractor to start the vacuum testing of the components and assemblies that constitute the four CSF clusters and four TSF clusters in the NIF laser. This review assures that appropriate engineering, planning and management is in place to start this testing. Completion and acceptance of thismore » report satisfies the LLNL requirement for MPRs to be conducted whenever a significant new risk is introduced into a project and is an essential part of the ISM work authorization process.« less
  • A Management Prestart Review (MPR) for the National Ignition Facility (NIF) Optics Assembly Building (OAB) was conducted from June, 2000, through October, 2000. This review was performed to determine readiness of the facility and management to transfer the facility from the construction to the commissioning and operations phase. This review process provides assurance that the appropriate line management is in place to effect the turnover. Completion and acceptance of this report constitutes a turnover of facility and equipment operational responsibility from the Beampath Infrastructure System Construction organization to the Assembly Installation and Refurbishment Operations (assembly equipment installation/activation and mechanical cleaningmore » operations) and the Beampath Infrastructure System (BIS) Commissioning and Operations Organizations (conventional facility operations). The OAB MPR provides to the NIF Project Manager an independent, systematic assessment of: (1) Readiness of line management for the turnover to take place, (2) Completeness of the equipment and facility installation of the OAB, (3) Readiness of personnel to operate within the facility, and (4) Implementation and efficacy of key management control processes and procedures. The MPR process assures that the technical, cost, and schedule risk associated with the installation/activation of OAB special equipment, mechanical cleaning, and conventional facility operations within the OAB are evaluated and are acceptable. Specifically, the scope of the review addresses technical and operational attributes of the equipment and facility systems that have been determined to have significant project risk. This report implements the LLNL requirement that MPRs shall be conducted before all new facilities are brought into operation, Lawrence Livermore National Laboratory (LLNL) ES&H Manual (M-010), Section 2.2.5, Pre-Start Reviews. The MPR process is an essential part of the ISM work authorization and feedback process. This report documents this process as it pertains to the readiness to install and activate OAB special equipment, perform mechanical cleaning operations, and operate the conventional facility aspects of the OAB. This review found no deficiencies in the status of the facility and equipment, or the operational readiness that would preclude the turnover process; the operational organizations are equipped to assume management of the facilities. The line management responsibilities for the continued operations in OAB are described in Section 3 of this report. The environmental, safety and health requirements for the sustained commissioning and operations are discussed in Section 4. At the same time, the review found 22 elements that need to be addressed in a timely and expeditious manner. These findings are summarized in Section 5 of this report. The Problem Identification and Correction System (PICS) will be used to track these items to closure. The MPR Committee recommends management responsibilities of the OAB be assumed and authorized to the BIS Commissioning and Operations, and the Assembly and Refurbishment organizations according to the management plan described in Section 4.« less
  • The results of the analysis of the Fission Gas Plenum Experiment are presented. This experiment is the second in a series of several experiments comprising a joint US DOE-Japan PNC Shielding Research Program (JASPER). The four Fission Gas Plenum Experiment configurations, designed for the measurement of neutron streaming through the fission gas plenum region, were analyzed using Monte Carlo and two-dimensional discrete ordinated methods. Calculated results compared well with measured results in many cases, although results were consistently underpredicted for the shorter plenum configurations. Like the measured data, the calculated results indicated no significant streaming when results from the heterogeneousmore » mockups were compared to those from the homogeneous mockups. An explanation is given as to why little streaming was observed. The Hornyak button dose rates were overpredicted because of a normalization problem with the response function but yielded horizontal traverse curves whose shapes agreed well with the measured shapes to the same extent as did those for the other integral detectors. 16 refs., 16 figs., 4 tabs.« less