skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Ammonia Remediation in Hanford WTP Liquid Secondary Waste.

Abstract

This report describes the results of work and testing specified by the referenced WRPS approved Test Plans. The work and any associated testing followed established quality assurance requirements and was conducted as authorized. The descriptions provided in this test report are an accurate account of both the conduct of the work and the data collected. Results required by the Test Plan are reported. Also reported are any unusual or anomalous occurrences that are different from the starting hypotheses. The test results and this report have been reviewed and verified.

Authors:
 [1]
  1. Washington River Protection Solutions, LLC, Richland, WA (United States)
Publication Date:
Research Org.:
Washington River Protection Solutions, LLC, Richland, WA (United States). Hanford Site (HNF)
Sponsoring Org.:
USDOE Office of Environmental Management (EM)
OSTI Identifier:
1481858
Report Number(s):
RPP-RPT-61117, Rev. 0
DOE Contract Number:  
AC27-08RV14800
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English

Citation Formats

Reid, Doug J. Ammonia Remediation in Hanford WTP Liquid Secondary Waste.. United States: N. p., 2018. Web. doi:10.2172/1481858.
Reid, Doug J. Ammonia Remediation in Hanford WTP Liquid Secondary Waste.. United States. doi:10.2172/1481858.
Reid, Doug J. Tue . "Ammonia Remediation in Hanford WTP Liquid Secondary Waste.". United States. doi:10.2172/1481858. https://www.osti.gov/servlets/purl/1481858.
@article{osti_1481858,
title = {Ammonia Remediation in Hanford WTP Liquid Secondary Waste.},
author = {Reid, Doug J.},
abstractNote = {This report describes the results of work and testing specified by the referenced WRPS approved Test Plans. The work and any associated testing followed established quality assurance requirements and was conducted as authorized. The descriptions provided in this test report are an accurate account of both the conduct of the work and the data collected. Results required by the Test Plan are reported. Also reported are any unusual or anomalous occurrences that are different from the starting hypotheses. The test results and this report have been reviewed and verified.},
doi = {10.2172/1481858},
journal = {},
number = ,
volume = ,
place = {United States},
year = {2018},
month = {11}
}