skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Removal Action Design Plan (RADP) with Effectiveness Monitoring Plan (EMP) for the C-Area Groundwater (CAGW) Operable Unit (OU) (U)

Abstract

The purpose of this Removal Action Design Plan (RADP) with Environmental Monitoring Plan (EMP) is to provide the final design information for the implementation of the non-time critical (NTC) removal action at the C-Area Groundwater (CAGW) Operable Unit (OU) and the post-construction plan for monitoring. Groundwater associated with the CAGW OU is contaminated with tritium and volatile organic compounds (VOCs), primarily trichloroethylene (TCE), due to releases associated with reactor operations. This removal action focusses on the TCE contamination in the distal portion of the groundwater plume. The United States Department of Energy (USDOE), US Environmental Protection Agency (USEPA), and South Carolina Department of Health and Environmental Control (SCDHEC), and USDOE agreed to conduct a NTC removal action at the CAGW OU to reduce potential risk to human health and the environment. This RADP presents the design details for the removal action including a description of the removal action construction strategy, removal action activities, and effectiveness monitoring plan. The removal action along with the Applicable or Relevant and Appropriate Requirements are presented in the Action Memorandum (AM), Revision 0 (USDOE 2018) for the CAGW OU and the Removal Site Evaluation Report/Engineering Evaluation/Cost Analysis (RSER/EE/CA) for C-Area Groundwater Operable Unit (SRNS 2018).

Authors:
Publication Date:
Research Org.:
Savannah River Site (SRS), Aiken, SC (United States)
Sponsoring Org.:
USDOE
OSTI Identifier:
1466193
Report Number(s):
SRNS-RP-2018-00807
TRN: US1901788
DOE Contract Number:  
AC09-08SR22470
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES

Citation Formats

None, None. Removal Action Design Plan (RADP) with Effectiveness Monitoring Plan (EMP) for the C-Area Groundwater (CAGW) Operable Unit (OU) (U). United States: N. p., 2018. Web. doi:10.2172/1466193.
None, None. Removal Action Design Plan (RADP) with Effectiveness Monitoring Plan (EMP) for the C-Area Groundwater (CAGW) Operable Unit (OU) (U). United States. doi:10.2172/1466193.
None, None. Thu . "Removal Action Design Plan (RADP) with Effectiveness Monitoring Plan (EMP) for the C-Area Groundwater (CAGW) Operable Unit (OU) (U)". United States. doi:10.2172/1466193. https://www.osti.gov/servlets/purl/1466193.
@article{osti_1466193,
title = {Removal Action Design Plan (RADP) with Effectiveness Monitoring Plan (EMP) for the C-Area Groundwater (CAGW) Operable Unit (OU) (U)},
author = {None, None},
abstractNote = {The purpose of this Removal Action Design Plan (RADP) with Environmental Monitoring Plan (EMP) is to provide the final design information for the implementation of the non-time critical (NTC) removal action at the C-Area Groundwater (CAGW) Operable Unit (OU) and the post-construction plan for monitoring. Groundwater associated with the CAGW OU is contaminated with tritium and volatile organic compounds (VOCs), primarily trichloroethylene (TCE), due to releases associated with reactor operations. This removal action focusses on the TCE contamination in the distal portion of the groundwater plume. The United States Department of Energy (USDOE), US Environmental Protection Agency (USEPA), and South Carolina Department of Health and Environmental Control (SCDHEC), and USDOE agreed to conduct a NTC removal action at the CAGW OU to reduce potential risk to human health and the environment. This RADP presents the design details for the removal action including a description of the removal action construction strategy, removal action activities, and effectiveness monitoring plan. The removal action along with the Applicable or Relevant and Appropriate Requirements are presented in the Action Memorandum (AM), Revision 0 (USDOE 2018) for the CAGW OU and the Removal Site Evaluation Report/Engineering Evaluation/Cost Analysis (RSER/EE/CA) for C-Area Groundwater Operable Unit (SRNS 2018).},
doi = {10.2172/1466193},
journal = {},
number = ,
volume = ,
place = {United States},
year = {2018},
month = {8}
}

Technical Report:

Save / Share: