Title: DWPF Melter Off-Gas Chemistry Model for the Nitric-Glycolic Acid Flowsheet

Abstract

The Defense Waste Processing Facility (DWPF) melter off-gas flammability model for the current nitric- formic acid (NFA) flowsheet was revised in Revision 0 to reflect the upcoming reductant change from formic to glycolic acid. The necessary data for the model revision was obtained during Phase 2 of the Cold-cap Evaluation Furnace (CEF) test, which was completed on March 21, 2014 after 24 days of round-the-clock feeding and pouring, including a total downtime of ~20 hours due to equipment failures.

Authors:
 [1]
  1. Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)
Publication Date:
Research Org.:
Savannah River Site (SRS), Aiken, SC (United States)
Sponsoring Org.:
USDOE
OSTI Identifier:
1457679
Report Number(s):
SRNL-STI-2014-00355
DOE Contract Number:  
AC09-08SR22470
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English

Citation Formats

Choi, A. S.. DWPF Melter Off-Gas Chemistry Model for the Nitric-Glycolic Acid Flowsheet. United States: N. p., 2018. Web. doi:10.2172/1457679.
Choi, A. S.. DWPF Melter Off-Gas Chemistry Model for the Nitric-Glycolic Acid Flowsheet. United States. doi:10.2172/1457679.
Choi, A. S.. Tue . "DWPF Melter Off-Gas Chemistry Model for the Nitric-Glycolic Acid Flowsheet". United States. doi:10.2172/1457679. https://www.osti.gov/servlets/purl/1457679.
@article{osti_1457679,
title = {DWPF Melter Off-Gas Chemistry Model for the Nitric-Glycolic Acid Flowsheet},
author = {Choi, A. S.},
abstractNote = {The Defense Waste Processing Facility (DWPF) melter off-gas flammability model for the current nitric- formic acid (NFA) flowsheet was revised in Revision 0 to reflect the upcoming reductant change from formic to glycolic acid. The necessary data for the model revision was obtained during Phase 2 of the Cold-cap Evaluation Furnace (CEF) test, which was completed on March 21, 2014 after 24 days of round-the-clock feeding and pouring, including a total downtime of ~20 hours due to equipment failures.},
doi = {10.2172/1457679},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Tue Jun 12 00:00:00 EDT 2018},
month = {Tue Jun 12 00:00:00 EDT 2018}
}

Technical Report:

Save / Share: