Title: PIP-II Injector Test Warm Front End: Commissioning Update

Abstract

The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test [1] at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status, focusing on beam measurements in the MEBT. In particular, a beam with the parameters required for injection into the Booster (5 mA, 0.55 ms macro-pulse at 20 Hz) was transported through the WFE.

Authors:
;
Publication Date:
Research Org.:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Org.:
USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
Contributing Org.:
PIP-II
OSTI Identifier:
1452810
Report Number(s):
FERMILAB-CONF-18-017-AD
1676747
DOE Contract Number:
AC02-07CH11359
Resource Type:
Conference
Resource Relation:
Conference: 9th International Particle Accelerator Conference, Vancouver, BC Canada, 04/29-05/04/2018
Country of Publication:
United States
Language:
English
Subject:
43 PARTICLE ACCELERATORS

Citation Formats

Prost, Lionel R., and et al. PIP-II Injector Test Warm Front End: Commissioning Update. United States: N. p., 2018. Web.
Prost, Lionel R., & et al. PIP-II Injector Test Warm Front End: Commissioning Update. United States.
Prost, Lionel R., and et al. Sun . "PIP-II Injector Test Warm Front End: Commissioning Update". United States. doi:. https://www.osti.gov/servlets/purl/1452810.
@article{osti_1452810,
title = {PIP-II Injector Test Warm Front End: Commissioning Update},
author = {Prost, Lionel R. and et al.},
abstractNote = {The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test [1] at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status, focusing on beam measurements in the MEBT. In particular, a beam with the parameters required for injection into the Booster (5 mA, 0.55 ms macro-pulse at 20 Hz) was transported through the WFE.},
doi = {},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Sun Apr 01 00:00:00 EDT 2018},
month = {Sun Apr 01 00:00:00 EDT 2018}
}

Conference:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that hold this conference proceeding.

Save / Share: