skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Installation of Injection Well TAV-INJ1 at the Technical Area-V Groundwater Area of Concern

Abstract

This report documents the installation of injection well TAV-INJ1 at the Technical Area-V (TA-V) Groundwater Area of Concern at Sandia National Laboratories, New Mexico (SNL/NM). The U.S. Department of Energy (DOE) and the management and operating contractor for Sandia National Laboratories beginning on May 1, 2017, National Technology & Engineering Solutions of Sandia, LLC (NTESS), hereinafter collectively referred to as DOE/NTESS, prepared this well installation report.

Authors:
 [1]
  1. Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)
Publication Date:
Research Org.:
Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)
Sponsoring Org.:
USDOE Office of Environmental Management (EM), Office of Groundwater and Soil Remediation (EM-32)
OSTI Identifier:
1452670
Report Number(s):
SAND-2018-6072R
664151
DOE Contract Number:  
AC04-94AL85000
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English

Citation Formats

Lum, Clinton C. L. Installation of Injection Well TAV-INJ1 at the Technical Area-V Groundwater Area of Concern. United States: N. p., 2018. Web. doi:10.2172/1452670.
Lum, Clinton C. L. Installation of Injection Well TAV-INJ1 at the Technical Area-V Groundwater Area of Concern. United States. doi:10.2172/1452670.
Lum, Clinton C. L. Fri . "Installation of Injection Well TAV-INJ1 at the Technical Area-V Groundwater Area of Concern". United States. doi:10.2172/1452670. https://www.osti.gov/servlets/purl/1452670.
@article{osti_1452670,
title = {Installation of Injection Well TAV-INJ1 at the Technical Area-V Groundwater Area of Concern},
author = {Lum, Clinton C. L.},
abstractNote = {This report documents the installation of injection well TAV-INJ1 at the Technical Area-V (TA-V) Groundwater Area of Concern at Sandia National Laboratories, New Mexico (SNL/NM). The U.S. Department of Energy (DOE) and the management and operating contractor for Sandia National Laboratories beginning on May 1, 2017, National Technology & Engineering Solutions of Sandia, LLC (NTESS), hereinafter collectively referred to as DOE/NTESS, prepared this well installation report.},
doi = {10.2172/1452670},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Jun 01 00:00:00 EDT 2018},
month = {Fri Jun 01 00:00:00 EDT 2018}
}

Technical Report:

Save / Share: