Abstract

Project Icebreaker, a 20 Megawatt offshore wind project 8 miles north of Cleveland, OH in Lake Erie, has been under development by the Lake Erie Energy Development Corporation since 2009. Significant development efforts were completed prior to the award of DE-EE0006714 (December 2014). This report describes the status of the work performed under award DE-EE0006714. The work was organized into several categories or tasks. The report presents the status of that work in each of eleven (11) main tasks: 1) State and Federal Permits; 2) Mono Bucket Foundation Engineering; 3) Construction and Installation Engineering; 4) Cable Route Survey; 5) Electrical System Design; 6) Power Off-take; 7) Project Costs and Risk Management; 8) Operations and Maintenance Planning; 9) Domestic Supply Chain Development; 10) Instrumentation Planning; and 11) Department of Energy Review.

Authors:
 [1];  [1];  [1]
  1. Lake Erie Energy Development Corp. (LEEDCo), Cleveland, OH (United States)
Publication Date:
Research Org.:
Lake Erie Energy Development Corp. (LEEDCo), Cleveland, OH (United States)
Sponsoring Org.:
USDOE Office of Energy Efficiency and Renewable Energy (EERE), Wind Energy Technologies Office (EE-4WE)
Contributing Org.:
CSR GeoSurveys Ltd., Porters Lake, NS (Canada); Case Western Reserve Univ.; Dickinson Wright PLLC; DNV GL; Donjon Marine Co., Inc.; Environmental Design & Research, Landscape Architecture, Engineering & Environmental Services, D.P.C. (EDR); GLWN; Hull & Associates, Inc.; Jacobs; LimnoTech; McNeilan & Associates; Middough Inc.; ODE – Offshore Design Engineering Limited – A DORIS Group Company; TDI-Brooks International, Inc.; Universal Foundation A/S; VanZandt Engineering; Western EcoSystems Technology, Inc.
OSTI Identifier:
1435170
Report Number(s):
DOE-LEEDCO-6714-1
DOE Contract Number:  
EE0006714
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
17 WIND ENERGY; Project Icebreaker; Offshore Wind; Mono Bucket; Lake Erie; PPA; Supply Chain; NEPA; Ohio Power Siting Board; Submarine Cable; PJM Interconnection

Citation Formats

Wagner, Lorry, Karpinski, David, and Nagusky, Beth. DE-EE0006714 Final Report-Project Icebreaker™. United States: N. p., 2018. Web. doi:10.2172/1435170.
Wagner, Lorry, Karpinski, David, & Nagusky, Beth. DE-EE0006714 Final Report-Project Icebreaker™. United States. doi:10.2172/1435170.
Wagner, Lorry, Karpinski, David, and Nagusky, Beth. Mon . "DE-EE0006714 Final Report-Project Icebreaker™". United States. doi:10.2172/1435170. https://www.osti.gov/servlets/purl/1435170.
@article{osti_1435170,
title = {DE-EE0006714 Final Report-Project Icebreaker™},
author = {Wagner, Lorry and Karpinski, David and Nagusky, Beth},
abstractNote = {Project Icebreaker, a 20 Megawatt offshore wind project 8 miles north of Cleveland, OH in Lake Erie, has been under development by the Lake Erie Energy Development Corporation since 2009. Significant development efforts were completed prior to the award of DE-EE0006714 (December 2014). This report describes the status of the work performed under award DE-EE0006714. The work was organized into several categories or tasks. The report presents the status of that work in each of eleven (11) main tasks: 1) State and Federal Permits; 2) Mono Bucket Foundation Engineering; 3) Construction and Installation Engineering; 4) Cable Route Survey; 5) Electrical System Design; 6) Power Off-take; 7) Project Costs and Risk Management; 8) Operations and Maintenance Planning; 9) Domestic Supply Chain Development; 10) Instrumentation Planning; and 11) Department of Energy Review.},
doi = {10.2172/1435170},
journal = {},
number = ,
volume = ,
place = {United States},
year = {2018},
month = {4}
}