Title: The cost of getting CCS wrong: Uncertainty, infrastructure design, and stranded CO 2

Abstract

Carbon capture, and storage (CCS) infrastructure will require industry—such as fossil-fuel power, ethanol production, and oil and gas extraction—to make massive investment in infrastructure. The cost of getting these investments wrong will be substantial and will impact the success of CCS technology. Multiple factors can and will impact the success of commercial-scale CCS, including significant uncertainties regarding capture, transport, and injection-storage decisions. Uncertainties throughout the CCS supply chain include policy, technology, engineering performance, economics, and market forces. In particular, large uncertainties exist for the injection and storage of CO 2. Even taking into account upfront investment in site characterization, the final performance of the storage phase is largely unknown until commercial-scale injection has started. We explore and quantify the impact of getting CCS infrastructure decisions wrong based on uncertain injection rates and uncertain CO 2 storage capacities using a case study managing CO 2 emissions from the Canadian oil sands industry in Alberta. We use SimCCS, a widely used CCS infrastructure design framework, to develop multiple CCS infrastructure scenarios. Each scenario consists of a CCS infrastructure network that connects CO 2 sources (oil sands extraction and processing) with CO 2 storage reservoirs (acid gas storage reservoirs) using a dedicated COmore » 2 pipeline network. Each scenario is analyzed under a range of uncertain storage estimates and infrastructure performance is assessed and quantified in terms of cost to build additional infrastructure to store all CO 2. We also include the role of stranded CO 2, CO 2 that a source was expecting to but cannot capture due substandard performance in the transport and storage infrastructure. Results show that the cost of getting the original infrastructure design wrong are significant and that comprehensive planning will be required to ensure that CCS becomes a successful climate mitigation technology. Here, we show that the concept of stranded CO 2 can transform a seemingly high-performing infrastructure design into the worst case scenario.« less

Authors:
ORCiD logo [1]; ORCiD logo [1]
  1. Los Alamos National Lab. (LANL), Los Alamos, NM (United States)
Publication Date:
Research Org.:
Los Alamos National Lab. (LANL), Los Alamos, NM (United States)
Sponsoring Org.:
USDOE Office of Fossil Energy (FE), Clean Coal and Carbon (FE-20)
OSTI Identifier:
1417829
Report Number(s):
LA-UR-17-30479
Journal ID: ISSN 1750-5836
Grant/Contract Number:
AC52-06NA25396
Resource Type:
Journal Article: Accepted Manuscript
Journal Name:
International Journal of Greenhouse Gas Control
Additional Journal Information:
Journal Volume: 70; Journal Issue: C; Journal ID: ISSN 1750-5836
Publisher:
Elsevier
Country of Publication:
United States
Language:
English
Subject:
54 ENVIRONMENTAL SCIENCES; Earth Sciences; CCS; SimCCS; Infrastructure design; Uncertainty; Stranded CO2

Citation Formats

Middleton, Richard Stephen, and Yaw, Sean Patrick. The cost of getting CCS wrong: Uncertainty, infrastructure design, and stranded CO2. United States: N. p., 2018. Web. doi:10.1016/j.ijggc.2017.12.011.
Middleton, Richard Stephen, & Yaw, Sean Patrick. The cost of getting CCS wrong: Uncertainty, infrastructure design, and stranded CO2. United States. doi:10.1016/j.ijggc.2017.12.011.
Middleton, Richard Stephen, and Yaw, Sean Patrick. 2018. "The cost of getting CCS wrong: Uncertainty, infrastructure design, and stranded CO2". United States. doi:10.1016/j.ijggc.2017.12.011.
@article{osti_1417829,
title = {The cost of getting CCS wrong: Uncertainty, infrastructure design, and stranded CO2},
author = {Middleton, Richard Stephen and Yaw, Sean Patrick},
abstractNote = {Carbon capture, and storage (CCS) infrastructure will require industry—such as fossil-fuel power, ethanol production, and oil and gas extraction—to make massive investment in infrastructure. The cost of getting these investments wrong will be substantial and will impact the success of CCS technology. Multiple factors can and will impact the success of commercial-scale CCS, including significant uncertainties regarding capture, transport, and injection-storage decisions. Uncertainties throughout the CCS supply chain include policy, technology, engineering performance, economics, and market forces. In particular, large uncertainties exist for the injection and storage of CO2. Even taking into account upfront investment in site characterization, the final performance of the storage phase is largely unknown until commercial-scale injection has started. We explore and quantify the impact of getting CCS infrastructure decisions wrong based on uncertain injection rates and uncertain CO2 storage capacities using a case study managing CO2 emissions from the Canadian oil sands industry in Alberta. We use SimCCS, a widely used CCS infrastructure design framework, to develop multiple CCS infrastructure scenarios. Each scenario consists of a CCS infrastructure network that connects CO2 sources (oil sands extraction and processing) with CO2 storage reservoirs (acid gas storage reservoirs) using a dedicated CO2 pipeline network. Each scenario is analyzed under a range of uncertain storage estimates and infrastructure performance is assessed and quantified in terms of cost to build additional infrastructure to store all CO2. We also include the role of stranded CO2, CO2 that a source was expecting to but cannot capture due substandard performance in the transport and storage infrastructure. Results show that the cost of getting the original infrastructure design wrong are significant and that comprehensive planning will be required to ensure that CCS becomes a successful climate mitigation technology. Here, we show that the concept of stranded CO2 can transform a seemingly high-performing infrastructure design into the worst case scenario.},
doi = {10.1016/j.ijggc.2017.12.011},
journal = {International Journal of Greenhouse Gas Control},
number = C,
volume = 70,
place = {United States},
year = 2018,
month = 1
}

Journal Article:
Free Publicly Available Full Text
This content will become publicly available on January 11, 2019
Publisher's Version of Record

Save / Share:
  • FERC is currently at a cross-road: It must implement its stranded cost policies properly or the comprehensive approach that Order 888 represents will not be credible. In this context, it is important to remember that public policies aimed at introducing competition into electricity markets will proceed more quickly and effectively if the regulatory bargain is kept. Thus, any plan to introduce competition in electricity must honor existing commitments and provide utilities with a reasonable opportunity to recover prudently incurred investments. By closing the gaps in its stranded cost recovery policies in economically appropriate ways, FERC can reaccelerate the movement tomore » efficient competition in generation markets.« less
  • Utility resource planning has evolved from minimizing the delivered prices of electricity and natural gas to minimizing the cost of delivering energy services to customers. But even this broader objective falls short of the mark, because it continues to focus solely on costs rather than on benefits. There is however, a new test that accounts for all of the costs and benefits associated with integrated utility resource plans. The cost-benefit test proposed here is based on maximizing the collective consumer surplus of the utility's customers, net of external costs, such as those associated with adverse environmental impacts. The test assumesmore » the utility will be allowed to exactly recovery its costs, and thus will only play a catalytic role. However, the test can be expanded to include the effects of such regulatory incentive schemes as shared savings, and indeed, has the potential to serve as a tool for determining the optimal level of such financial incentives. Furthermore, the test is capable of explicitly quantifying the individual effects of the three basic elements that comprise every integrated resource plan (IRP): supply-side resources, demand-side resources, and rate designs. A utility's rate designs are key ingredients of any IRP and deserve the same consideration given supply- and demand-side resources. Unfortunately, this is often not appreciated by utilities or their regulators. Rates are typically designed or modified on the basis of equity considerations and/or political acceptability. Economic efficiency is considered as an afterthought -- if at all. This practice can be wasteful and costly for the utilities and the nation's economy.« less
  • On July 8, 1977, the New Mexico Public Service Commission denied a request by Gas Company of New Mexico, a company of Southern Union Gas Company, of Dallas, Texas, for cost-of-service indexing (Case No. 1301). This was the second such application before this commission; the first being Case No. 1196, filed by Public Service Company of New Mexico, at which time the regulatory methodology known as cost-of-service indexing (COSI) was adopted. This provides for automatic, quarterly adjustments in a utility's base service rates in response to net increase in its actual book cost for furnishing jurisdictional service. The rate ofmore » return on common equity capital sets the prescribed range for company earnings. In Case 1301 the commission was asked to apply COSI to another utility under its jurisdiction, Gas Company of New Mexico, a vertically integrated natural gas utility which is a division of a larger company, Southern Union Company. Prior to addressing the question of whether the commission should apply COSI to Gas Company, two threshold questions not discussed in Case 1196 were addressed: (1) under what conditions or circumstances will the commission consider applying COSI to other utilities under its jurisdiction, and (2) what is the burden of proof that a utility must meet in order for the commission to apply COSI. In reference to the conditions or circumstances in which this commission will apply COSI to other utilities, it is believed that the ''end result'' doctrine governs--striking the balance between the interests of the consumer, the public, and the utility investor.« less
  • Electric utilities now face the risk that existing assets, costs, or contract commitments may be {open_quotes}stranded{close_quotes} by increased competition, leaving shareholders rather than customers to bear the costs. Have shareholders already been compensated for this risk? Some argue that shareholders have automatically been compensated for this risk by an allowed rate of return equal to the cost of equity capital determined in efficient capital markets. If so, forcing shareholders to bear stranded costs may seem fair. However, this argument does not stand up to scrutiny, because the cost of capital by definition does not include such compensation.