skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Risk management in petroleum development projects: Technical and economic indicators to define a robust production strategy

Authors:
; ;
Publication Date:
Sponsoring Org.:
USDOE
OSTI Identifier:
1416807
Resource Type:
Journal Article: Publisher's Accepted Manuscript
Journal Name:
Journal of Petroleum Science and Engineering
Additional Journal Information:
Journal Volume: 151; Journal Issue: C; Related Information: CHORUS Timestamp: 2018-01-12 07:39:55; Journal ID: ISSN 0920-4105
Publisher:
Elsevier
Country of Publication:
Netherlands
Language:
English

Citation Formats

Santos, Susana M. G., Gaspar, Ana Teresa F. S., and Schiozer, Denis J. Risk management in petroleum development projects: Technical and economic indicators to define a robust production strategy. Netherlands: N. p., 2017. Web. doi:10.1016/j.petrol.2017.01.035.
Santos, Susana M. G., Gaspar, Ana Teresa F. S., & Schiozer, Denis J. Risk management in petroleum development projects: Technical and economic indicators to define a robust production strategy. Netherlands. doi:10.1016/j.petrol.2017.01.035.
Santos, Susana M. G., Gaspar, Ana Teresa F. S., and Schiozer, Denis J. Wed . "Risk management in petroleum development projects: Technical and economic indicators to define a robust production strategy". Netherlands. doi:10.1016/j.petrol.2017.01.035.
@article{osti_1416807,
title = {Risk management in petroleum development projects: Technical and economic indicators to define a robust production strategy},
author = {Santos, Susana M. G. and Gaspar, Ana Teresa F. S. and Schiozer, Denis J.},
abstractNote = {},
doi = {10.1016/j.petrol.2017.01.035},
journal = {Journal of Petroleum Science and Engineering},
number = C,
volume = 151,
place = {Netherlands},
year = {Wed Mar 01 00:00:00 EST 2017},
month = {Wed Mar 01 00:00:00 EST 2017}
}

Journal Article:
Free Publicly Available Full Text
Publisher's Version of Record at 10.1016/j.petrol.2017.01.035

Save / Share:
  • The construction and operation of large-scale energy or resource development projects are accompanied by environmental, social, and economic changes or impacts. Impact assessment is the key tool used to determine which impact areas will most severely affect the community and will thus need to be managed. Impact management, only recently recognized as part of the assessment process, includes public and private actions to ameliorate impacts. The use of available impact management strategies can affect the outcome or change in the social and economic environment in a community. Therefore, an inventory of available strategies and the capabilities of local governments tomore » use such strategies should be an integral part of any social and economic impact assessment. This provides a link between impact assessment and management. This report provides an introductory analysis to some of the more complex issues raised by social and economic impact management, with experiences cited from Western coal-development communities. Following an introduction, the paper is divided into sections corresponding to the major social and economic impacts experienced by rural communities surrounding an energy development. Each section contains a brief introductory description of the types of problems typically associated with the impact sector, and a discussion of management strategies either proposed or implemented for the impact. The management strategies are presented in tabular form, indicating the level of government responsible for implementation. 10 tables, 72 references. (MCW)« less
  • There has been an increased interest in using sustainability indicators for evaluating the impacts of development and conservation projects. Past and recent experiences have shown that sustainability indicators can be powerful tools for measuring the outcomes of various interventions, when used appropriately and adequately. Currently, there is a range of methods for applying sustainability indicators for project impact evaluation at the environment–development interface. At the same time, a number of challenges persist which have implication for impact evaluation processes especially in developing countries. We highlight some key and recurrent challenges, using three cases from Kenya, Indonesia and Brazil. In thismore » study, we have conducted a comparative analysis across multiple projects from the three countries, which aimed to conserve biodiversity and improve livelihoods. The assessments of these projects were designed to evaluate their positive, negative, short-term, long term, direct and indirect impacts. We have identified a set of commonly used sustainability indicators to evaluate the projects and have discussed opportunities and challenges associated with their application. Our analysis shows that impact evaluation processes present good opportunities for applying sustainability indicators. On the other hand, we find that project proponents (e.g. managers, evaluators, donors/funders) face challenges with establishing full impacts of interventions and that these are rooted in monitoring and evaluation processes, lack of evidence-based impacts, difficulties of measuring certain outcomes and concerns over scale of a range of impacts. We outline key lessons learnt from the multiple cases and propose ways to overcome common problems. Results from our analysis demonstrate practical experiences of applying sustainability indicators in developing countries context where there are different prevailing socio-economic, cultural and environmental conditions. The knowledge derived from this study may therefore be useful to a wider range of audience who are concerned with sustainable integration of development and environmental conservation. - Highlights: • Sustainability indicators are increasingly used for evaluating project impacts. • Lessons learnt are based on case studies from Africa, Asia and South America. • Similar challenges when assessing impacts of development and conservation projects • Need for pragmatic solutions to overcome challenges when assessing project impacts.« less
  • FORSITE is an advanced project monitoring software system that is designed to track and forecast the development of multiple projects. This paper describes the organization and operation of the FORSITE system including its overall structure and the functional relationships between its files and data bases. The paper also illustrates the operation of the system with an example of a generic critical-path management schedule produced by FORSITE. A program listing and schedule summaries are included as appendices.
  • Jerry R. Bergeson and Associates, Inc. (Bergeson) has completed Phase 3 of the Reservoir Analysis, Naval Petroleum Reserve Number 1, Elk Hills Oilfield, California. The objective of this phase of the study was to establish the economic potential for the field by determining the optimum economic plan for development and production. The optimum economic plan used net cash flow analysis to evaluate future expected Department of Energy revenues less expenses and investments for proved developed, proved undeveloped, probable, possible and possible-enhanced oil recovery (EOR) reserves assigned in the Phase 2 study. The results of the Phase 2 study were usedmore » to define future production flowstreams. Additional production scheduling was carried out to evaluate accelerated depletion of proved developed reserves in the 29R, 31 C/D Shale and Northwest Stevens T Sand/N Shale Reservoirs. Production, cost and investment schedules were developed for the enhanced oil recovery projects identified in Phase 2. Price forecasts were provided by the Department of Energy. Operating costs and investment requirements were estimated by Bergeson. 4 figs., 48 tabs.« less
  • Climate change has become one of the most significant environmental issues, of which about 40% come from the building sector. In particular, complex building projects with various functions have increased, which should be managed from a program-level perspective. Therefore, this study aimed to develop a program-level management system for the life-cycle environmental and economic assessment of complex building projects. The developed system consists of three parts: (i) input part: database server and input data; (ii) analysis part: life cycle assessment and life cycle cost; and (iii) result part: microscopic analysis and macroscopic analysis. To analyze the applicability of the developedmore » system, this study selected ‘U’ University, a complex building project consisting of research facility and residential facility. Through value engineering with experts, a total of 137 design alternatives were established. Based on these alternatives, the macroscopic analysis results were as follows: (i) at the program-level, the life-cycle environmental and economic cost in ‘U’ University were reduced by 6.22% and 2.11%, respectively; (ii) at the project-level, the life-cycle environmental and economic cost in research facility were reduced 6.01% and 1.87%, respectively; and those in residential facility, 12.01% and 3.83%, respective; and (iii) for the mechanical work at the work-type-level, the initial cost was increased 2.9%; but the operation and maintenance phase was reduced by 20.0%. As a result, the developed system can allow the facility managers to establish the operation and maintenance strategies for the environmental and economic aspects from a program-level perspective. - Highlights: • A program-level management system for complex building projects was developed. • Life-cycle environmental and economic assessment can be conducted using the system. • The design alternatives can be analyzed from the microscopic perspective. • The system can be used to establish the optimal O&M strategy at the program-level. • It can be applied to any other country or sector in the global environment.« less