Title: Feasibility Study for a Combined Radiation Environment in the ACRR-FRECII Cavity.

Abstract

The objective of this report is to determine the feasibility of a combined pulsed - power accelerator machine, similar to HERMES - III, with the Annular Core Research Reactor (ACRR) Fueled - Ring External Cavity (FREC - II) in a new facility. The document is conceptual in nature, and includes some neutronic analysis that i llustrates that that the physics of such a concept would be feasible. There would still be many engineering design considerations and issues that would need to be investigated in order to determine the true viability of such a concept. This report does n ot address engineering design details, the cost of such a facility, or what would be required to develop the safety authorization of the concept. The radiation requirements for the "on - target" gamma - ray dose and dose rate are not addressed in this report . It is assumed that if the same general on - target specifications for a HERMES - III type machine could be met with the proposed concept, that the machine would b e considered highly useful as a radiation effects sciences platform. In general, the combined accelerator/ACRR reactor concept can be shown to be feasible with nomore » major issues that would preclude the usefulness of such a facility. The new facility would provide a capability that currently does not exist in the radiation testing complex.« less

Authors:
Publication Date:
Research Org.:
Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)
Sponsoring Org.:
USDOE National Nuclear Security Administration (NNSA)
OSTI Identifier:
1414657
Report Number(s):
SAND-2017-13566
659540
DOE Contract Number:
AC04-94AL85000
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS

Citation Formats

Parma, Edward J. Feasibility Study for a Combined Radiation Environment in the ACRR-FRECII Cavity.. United States: N. p., 2017. Web. doi:10.2172/1414657.
Parma, Edward J. Feasibility Study for a Combined Radiation Environment in the ACRR-FRECII Cavity.. United States. doi:10.2172/1414657.
Parma, Edward J. Fri . "Feasibility Study for a Combined Radiation Environment in the ACRR-FRECII Cavity.". United States. doi:10.2172/1414657. https://www.osti.gov/servlets/purl/1414657.
@article{osti_1414657,
title = {Feasibility Study for a Combined Radiation Environment in the ACRR-FRECII Cavity.},
author = {Parma, Edward J.},
abstractNote = {The objective of this report is to determine the feasibility of a combined pulsed - power accelerator machine, similar to HERMES - III, with the Annular Core Research Reactor (ACRR) Fueled - Ring External Cavity (FREC - II) in a new facility. The document is conceptual in nature, and includes some neutronic analysis that i llustrates that that the physics of such a concept would be feasible. There would still be many engineering design considerations and issues that would need to be investigated in order to determine the true viability of such a concept. This report does n ot address engineering design details, the cost of such a facility, or what would be required to develop the safety authorization of the concept. The radiation requirements for the "on - target" gamma - ray dose and dose rate are not addressed in this report . It is assumed that if the same general on - target specifications for a HERMES - III type machine could be met with the proposed concept, that the machine would b e considered highly useful as a radiation effects sciences platform. In general, the combined accelerator/ACRR reactor concept can be shown to be feasible with no major issues that would preclude the usefulness of such a facility. The new facility would provide a capability that currently does not exist in the radiation testing complex.},
doi = {10.2172/1414657},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Dec 01 00:00:00 EST 2017},
month = {Fri Dec 01 00:00:00 EST 2017}
}

Technical Report:

Save / Share: