Title: Hydropower Generation Performance Testing at Plants in Thailand and Laos

Abstract

An operational assessment of four hydropower plants in Southeast Asia revealed that gains in both energy production and water conservation could be achieved with little monetary investment through operational optimization efforts.

Authors:
 [1]; ORCiD logo [2];  [2]; ORCiD logo [2]
  1. U.S. Department of Energy (DOE), Office of International Affairs, Washington, D.C. (United States)
  2. Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)
Publication Date:
Research Org.:
Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)
Sponsoring Org.:
USDOE
OSTI Identifier:
1407783
Grant/Contract Number:
AC05-00OR22725
Resource Type:
Journal Article: Accepted Manuscript
Journal Name:
Hydro Review
Additional Journal Information:
Journal Volume: 36; Journal Issue: 3; Journal ID: ISSN 0884-0385
Publisher:
PennWell Corp.
Country of Publication:
United States
Language:
English
Subject:
13 HYDRO ENERGY

Citation Formats

Kern, Jamie, Hadjerioua, Boualem, Christian, Mark H., and Witt, Adam M. Hydropower Generation Performance Testing at Plants in Thailand and Laos. United States: N. p., 2017. Web.
Kern, Jamie, Hadjerioua, Boualem, Christian, Mark H., & Witt, Adam M. Hydropower Generation Performance Testing at Plants in Thailand and Laos. United States.
Kern, Jamie, Hadjerioua, Boualem, Christian, Mark H., and Witt, Adam M. Sat . "Hydropower Generation Performance Testing at Plants in Thailand and Laos". United States. doi:. https://www.osti.gov/servlets/purl/1407783.
@article{osti_1407783,
title = {Hydropower Generation Performance Testing at Plants in Thailand and Laos},
author = {Kern, Jamie and Hadjerioua, Boualem and Christian, Mark H. and Witt, Adam M.},
abstractNote = {An operational assessment of four hydropower plants in Southeast Asia revealed that gains in both energy production and water conservation could be achieved with little monetary investment through operational optimization efforts.},
doi = {},
journal = {Hydro Review},
number = 3,
volume = 36,
place = {United States},
year = {Sat Apr 01 00:00:00 EDT 2017},
month = {Sat Apr 01 00:00:00 EDT 2017}
}

Journal Article:
Free Publicly Available Full Text
Publisher's Version of Record
The DOI is not currently available

Save / Share:
  • Federal hydropower plants account for approximately half of installed US conventional hydropower capacity, and are an important part of the national renewable energy portfolio. Utilizing the strong linear relationship between the US Geological Survey WaterWatch runoff and annual hydropower generation, a runoff-based assessment approach is introduced in this study to project changes in annual and regional hydropower generation in multiple power marketing areas. Future climate scenarios are developed with a series of global and regional climate models, and the model output is bias-corrected to be consistent with observed data for the recent past. Using this approach, the median decrease inmore » annual generation at federal projects is projected to be less than –2 TWh, with an estimated ensemble uncertainty of ±9 TWh. Although these estimates are similar to the recently observed variability in annual hydropower generation, and may therefore appear to be manageable, significantly seasonal runoff changes are projected and it may pose significant challenges in water systems with higher limits on reservoir storage and operational flexibility. Lastly, future assessments will be improved by incorporating next-generation climate models, by closer examination of extreme events and longer-term change, and by addressing the interactions among hydropower and other water uses.« less
  • Cited by 13
  • Automatic generation control (AGC) of hydropower plants includes determination of the optimal number of operating units and which units ought to operate, economic dispatching of load among generators and load-frequency control (LFC). AGC must satisfy not only the economic requirements but also the safety requirements. The latter is very important for real-time control. Direct use of dynamic programming suffers from serious disadvantages, such as difficulty in considering the safety requirements, long time of calculation, large required computer memory, etc. This paper presents a new approach to solve the problem stage by stage, using in each stage different method of operationsmore » research (OR) : dynamic programming, 0-1 integer programming, principle of equal incremental. The new algorithm has been used in several hydropower plants, and good results have been achieved. This paper briefly describes the realization of AGC in the Left Powerhouse of Gezhouba Hydropower Plant. This algorithm is suitable for real-time AGC.« less
  • Efforts are underway to qualify the Next-Generation Solvent for the Caustic Side Solvent Extraction (CSSX) process. Researchers at multiple national laboratories have been involved in this effort. As part of the effort to qualify the solvent extraction system at the Savannah River Site (SRS), SRNL performed a number of tests at various scales. First, SRNL completed a series of batch equilibrium, or Extraction-Scrub-Strip (ESS), tests. These tests used {approx}30 mL of Next-Generation Solvent and either actual SRS tank waste, or waste simulant solutions. The results from these cesium mass transfer tests were used to predict solvent behavior under a numbermore » of conditions. At a larger scale, SRNL assembled 12 stages of 2-cm (diameter) centrifugal contactors. This rack of contactors is structurally similar to one tested in 2001 during the demonstration of the baseline CSSX process. Assembly and mechanical testing found no issues. SRNL performed a nonradiological test using 35 L of cesium-spiked caustic waste simulant and 39 L of actual tank waste. Test results are discussed; particularly those related to the effectiveness of extraction.« less