Title: Integrated Work Management: PIC, Course 31884

Abstract

The person-in-charge (PIC) plays a key role in the integrated work management (IWM) process at Los Alamos National Laboratory (LANL, or the Laboratory) because the PIC is assigned responsibility and authority by the responsible line manager (RLM) for the overall validation, coordination, release, execution, and closeout of a work activity in accordance with IWM. This course, Integrated Work Management: PIC (Course 31884), describes the PIC’s IWM roles and responsibilities. This course also discusses IWM requirements that the PIC must meet. For a general overview of the IWM process, see self-study Course 31881, Integrated Work Management: Overview. For instruction on the preparer’s role, see self-study Course 31883, Integrated Work Management: Preparer.

Authors:
 [1]
  1. Los Alamos National Lab. (LANL), Los Alamos, NM (United States)
Publication Date:
Research Org.:
Los Alamos National Lab. (LANL), Los Alamos, NM (United States)
Sponsoring Org.:
USDOE National Nuclear Security Administration (NNSA)
OSTI Identifier:
1392791
Report Number(s):
LA-UR-17-28089
DOE Contract Number:
AC52-06NA25396
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
99 GENERAL AND MISCELLANEOUS

Citation Formats

Simpson, Lewis Edward. Integrated Work Management: PIC, Course 31884. United States: N. p., 2017. Web. doi:10.2172/1392791.
Simpson, Lewis Edward. Integrated Work Management: PIC, Course 31884. United States. doi:10.2172/1392791.
Simpson, Lewis Edward. 2017. "Integrated Work Management: PIC, Course 31884". United States. doi:10.2172/1392791. https://www.osti.gov/servlets/purl/1392791.
@article{osti_1392791,
title = {Integrated Work Management: PIC, Course 31884},
author = {Simpson, Lewis Edward},
abstractNote = {The person-in-charge (PIC) plays a key role in the integrated work management (IWM) process at Los Alamos National Laboratory (LANL, or the Laboratory) because the PIC is assigned responsibility and authority by the responsible line manager (RLM) for the overall validation, coordination, release, execution, and closeout of a work activity in accordance with IWM. This course, Integrated Work Management: PIC (Course 31884), describes the PIC’s IWM roles and responsibilities. This course also discusses IWM requirements that the PIC must meet. For a general overview of the IWM process, see self-study Course 31881, Integrated Work Management: Overview. For instruction on the preparer’s role, see self-study Course 31883, Integrated Work Management: Preparer.},
doi = {10.2172/1392791},
journal = {},
number = ,
volume = ,
place = {United States},
year = 2017,
month = 9
}

Technical Report:

Save / Share:
  • Integrated work management (IWM) is the process used for formally implementing the five-step process associated with integrated safety management (ISM) and integrated safeguards and security management (ISSM) at Los Alamos National Laboratory (LANL). IWM also directly supports the LANL Environmental Management System (EMS). IWM helps all workers and managers perform work safely and securely and in a manner that protects people, the environment, property, and the security of the nation. The IWM process applies to all work activities at LANL, from working in the office to designing experiments to assembling and detonating explosives. The primary LANL document that establishes andmore » describes IWM requirements is Procedure (P) 300, Integrated Work Management.« less
  • The preparer (also called the “planner”) plays a key role in the integrated work management (IWM) process at Los Alamos National Laboratory (LANL). This course, Integrated Work Management: Preparer (COURSE 31883), describes the IWM roles and responsibilities of the preparer. This course also discusses IWM requirements that must be met by the preparer.
  • The facility operations director (FOD) and responsible line manager (RLM) play leadership and functional roles in the integrated work management (IWM) process at Los Alamos National Laboratory (LANL). This course, Integrated Work Management: FOD/RLM (COURSE 31882), describes the IWM roles and responsibilities of the FOD and the RLM; it also discusses IWM requirements that must be met by the FOD and the RLM. Before taking this course, you may want to take COURSE 31881, Integrated Work Management: Overview. This self-study course would be particularly helpful if you are unfamiliar with the IWM process. You should also read Procedure (P) 300,more » Integrated Work Management. This course briefly covers the roles of the preparer and person in charge (PIC). For more in-depth instruction on the preparer’s role, see COURSE 31883, Integrated Work Management: Preparer. For instruction on the PIC’s role, see COURSE 31884, Integrated Work Management: PIC.« less
  • This Phase II Modified Work Management Plan reflects the change from a Coal Using ICES to a Generic ICES Program. As such, it retains the essential elements relating to coal while broadening the number and types of alternative energy subsystems to be evaluated for eventual implementation on the Georgetown University Campus. In addition to the plan in Book I, Book II deals with an energy audit conducted at the campus in the fall of 1978 to establish a gross baseline from which to measure and evaluate the contributions of selected alternative energy subsystems both from an energy and cost standpoint.more » Book I proceeds from a discussion of an ICES through an explanation of the scope of effort in each phase expanded into detailed task descriptions by phase together with schedules, PERT and GANTT charts, milestones and levels of effort by task for the Feasibility Analysis, and schedules for the overall program. A description of examples of alternative subsystems to be considered is also included. A detailed Management Plan for the conduct of the effort by General Electric completes the plan. Appendices related to cogeneration, life-cycle costing, GE energy subsystems, the GU Master Energy Plan, and typical regulatory processes to be encountered are included. Book II treats the Energy Audit under the three committed task areas of System Description, Analysis and Survey, and Criteria for Energy Usage. The five major energy systems utilized at Georgetown are considered: electrical, chilled water, steam, gas and fuel oil, and city water. A top level analysis yields significant results and recommendations for further action with respect to a detailed measurements program, particularly of steam and electric power usage, over a one year period.« less
  • Radiological work is usually approved and controlled by radiation protection personnel by using administrative and procedural controls, such as radiological work permits (RWPs). In addition, some jobs will require working in, or will have the potential for creating, very high radiation, contamination, or airborne radioactivity areas. Radiological control technicians (RCTs) providing job coverage have an integral role in controlling radiological hazards. This course will prepare the student with the skills necessary for RCT qualification by passing quizzes, tests, and the RCT Comprehensive Phase 1, Unit 2 Examination (TEST 27566) and will provide in-the-field skills.