skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Magnetic Measurements of Storage Ring Magnets for the APS Upgrade Project

Abstract

Extensive prototyping of storage ring magnets is ongoing at the Advanced Photon Source (APS) in support of the APS Multi-Bend Achromat (MBA) upgrade project (APS-U) [1]. As part of the R&D activities four quadrupole magnets with slightly different geometries and pole tip materials, and one sextupole magnet with vanadium permendur (VP) pole tips were designed, built and tested. Magnets were measured individually using a rotating coil and a Hall probe for detailed mapping of the magnetic field. Magnets were then assembled and aligned relative to each other on a steel support plate and concrete plinth using precision machined surfaces to gain experience with the alignment method chosen for the APS-U storage ring magnets. The required alignment of magnets on a common support structure is 30 μm rms. Measurements of magnetic field quality, strength and magnet alignment after subjecting the magnets and assemblies to different tests are presented.

Authors:
; ; ; ; ; ; ; ; ; ;
Publication Date:
Research Org.:
Argonne National Lab. (ANL), Argonne, IL (United States)
Sponsoring Org.:
USDOE Office of Science (SC), Basic Energy Sciences (BES)
OSTI Identifier:
1379945
DOE Contract Number:  
AC02-06CH11357
Resource Type:
Conference
Resource Relation:
Conference: 2016 North American Particle Accelerator Conference, 10/09/16 - 10/14/16, Chicago, IL, US
Country of Publication:
United States
Language:
English

Citation Formats

Doose, C., Dejus, R., Jaski, M., Jansma, W., Collins, J., Donnelly, A., Liu, J., Cease, H., Decker, G., Jain, A., and DiMarco, J. Magnetic Measurements of Storage Ring Magnets for the APS Upgrade Project. United States: N. p., 2017. Web. doi:10.18429.
Doose, C., Dejus, R., Jaski, M., Jansma, W., Collins, J., Donnelly, A., Liu, J., Cease, H., Decker, G., Jain, A., & DiMarco, J. Magnetic Measurements of Storage Ring Magnets for the APS Upgrade Project. United States. https://doi.org/10.18429
Doose, C., Dejus, R., Jaski, M., Jansma, W., Collins, J., Donnelly, A., Liu, J., Cease, H., Decker, G., Jain, A., and DiMarco, J. 2017. "Magnetic Measurements of Storage Ring Magnets for the APS Upgrade Project". United States. https://doi.org/10.18429. https://www.osti.gov/servlets/purl/1379945.
@article{osti_1379945,
title = {Magnetic Measurements of Storage Ring Magnets for the APS Upgrade Project},
author = {Doose, C. and Dejus, R. and Jaski, M. and Jansma, W. and Collins, J. and Donnelly, A. and Liu, J. and Cease, H. and Decker, G. and Jain, A. and DiMarco, J.},
abstractNote = {Extensive prototyping of storage ring magnets is ongoing at the Advanced Photon Source (APS) in support of the APS Multi-Bend Achromat (MBA) upgrade project (APS-U) [1]. As part of the R&D activities four quadrupole magnets with slightly different geometries and pole tip materials, and one sextupole magnet with vanadium permendur (VP) pole tips were designed, built and tested. Magnets were measured individually using a rotating coil and a Hall probe for detailed mapping of the magnetic field. Magnets were then assembled and aligned relative to each other on a steel support plate and concrete plinth using precision machined surfaces to gain experience with the alignment method chosen for the APS-U storage ring magnets. The required alignment of magnets on a common support structure is 30 μm rms. Measurements of magnetic field quality, strength and magnet alignment after subjecting the magnets and assemblies to different tests are presented.},
doi = {10.18429},
url = {https://www.osti.gov/biblio/1379945}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Thu Jun 01 00:00:00 EDT 2017},
month = {Thu Jun 01 00:00:00 EDT 2017}
}

Conference:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that hold this conference proceeding.

Save / Share: