skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: IDC RP2 E2 Deliverables Status.

Abstract

Abstract not provided.

Authors:
Publication Date:
Research Org.:
Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)
Sponsoring Org.:
DOS
OSTI Identifier:
1378871
Report Number(s):
SAND2016-8452PE
646978
DOE Contract Number:
AC04-94AL85000
Resource Type:
Conference
Resource Relation:
Conference: Proposed for presentation at the IDC RP2 E2 Status Review.
Country of Publication:
United States
Language:
English

Citation Formats

Harris, James M. IDC RP2 E2 Deliverables Status.. United States: N. p., 2016. Web.
Harris, James M. IDC RP2 E2 Deliverables Status.. United States.
Harris, James M. 2016. "IDC RP2 E2 Deliverables Status.". United States. doi:. https://www.osti.gov/servlets/purl/1378871.
@article{osti_1378871,
title = {IDC RP2 E2 Deliverables Status.},
author = {Harris, James M.},
abstractNote = {Abstract not provided.},
doi = {},
journal = {},
number = ,
volume = ,
place = {United States},
year = 2016,
month = 8
}

Conference:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that hold this conference proceeding.

Save / Share:
  • US Air Force (USAF) headquarters requires Installation Restoration Program Information Management System (IRPIMS) deliverables for environmental data generated at USAF installations under the Installation Restoration Program (IRP). By integrating Geographical Information Systems (GIS) applications with these electronic deliverables as part of Remedial Investigations (RI), quality control and information usability are notably increased. The GIS/database link creates a dynamic environmental model of the installation and offers numerous uses. There is also the potential to yield long-term cost savings. The greatest resource of the IRPIMS electronic deliverable is database content. IRPIMS contains survey, field and analytical data collected during an RI. Thismore » database can then be tapped, and the format can be modified to be used with a variety of other data management or geographical information systems. Enhancing the IRPIMS database with GIS capabilities requires an initial investment of time and resources. However, the effort should be greatly reduced in the future, since the integration procedures can themselves be automated.« less
  • CH2M Hill Plateau Remediation Company (CHRPC) is a prime contractor to the U.S. Department of Energy (DOE) focused on the largest ongoing environmental remediation project in the world at the DOE Hanford Site Central Plateau, i.e. the DOE Hanford Plateau Remediation Contract. The East Tennessee Materials and Energy Corporation (M and EC); a wholly owned subsidiary of Perma-Fix Environmental Services, Inc. (PESI), is a small business team member to CHPRC. Our scope includes project management; operation and maintenance of on-site storage, repackaging, treatment, and disposal facilities; and on-site waste management including waste receipt from generators and delivery to on-site andmore » off-site treatment, storage, and disposal facilities. As part of this scope, M and EC staffs the centralized Waste Support Services organization responsible for all waste characterization and acceptance required to support CHPRC and waste generators across the Hanford Site. At the time of the CHPRC contract award (August 2008) slightly more than 9,000 cubic meters (m{sup 3}) of legacy waste was defined as 'no-path-forward waste'. A significant portion of this waste (7,650 m{sup 3}) comprised wastes with up to 50 grams of special nuclear materials (SNM) in oversized packages recovered during retrieval operations and large glove boxes removed from the Plutonium Finishing Plant (PFP). Through a collaborative effort between the DOE, CHPRC, and Perma-Fix Environmental Services, Inc. (PESI), pathways for these problematic wastes were developed that took advantage of commercial treatment capabilities at a nearby vendor facility, Perma-Fix Northwest (PFNW). In the spring of 2009, CHPRC initiated a pilot program under which they began shipping large package, low gram suspect TRU (<15 g SNM per container), and large package contact and remote handled MLLW to the off-site PFNW facility for treatment. PFNW is restricted by the SNM limits set for the total quantity of SNM allowed at the facility in accordance with the facility's radioactive materials license(s) (RML). While both CHPRC and PFNW maintain waste databases to track all waste movements, it became evident early in the process that a tool was needed that married the two systems to better track SNM inventories and sequence waste from the point of generation, through the PFNW facility, and back to the Hanford site for final disposition. This tool, known as the Treatment Integration and Planning Tool (TIPT), has become a robust planning tool that provides real-time data to support compliant and efficient waste generation, transportation, treatment, and disposition. TIPT is developing into the next generation tool that will change the way in which legacy wastes, retrieval wastes and decontamination and decommissioning operations are conducted on the Plateau Remediation Contract (PRC). The real value of the TIPT is its predictive capability. It allows the W and FMP to map out optimal windows for processing waste through the PFNW facility, or through any process that is in some way resource limited. It allows project managers to identify and focus on problem areas before shipments are affected. It has been modified for use in broader applications to predict turnaround times and identify windows of opportunity for processing higher gram wastes through PFNW and to allow waste generators, site-wide, to accurately predict scope, cost, and schedule for waste generation to optimize processing and eliminate storage, double handling, and related costs and unnecessary safety risks. The TIPT addresses the years old problem of how to effectively predict not only what needs to be done, but when. 'When' is the key planning parameter that has been ignored by the generator and processor for many years, but has proven to be the most important parameter for both parties. While further refinement is a natural part of any development process, the current improvements on the TIPT have shown that prediction is a powerful consideration. Even in lean times expected for the foreseeable future, the improved TIPT continues to play a central role in managing our way through those times to assure facilities remain viable and available. It is recommended that other major remediation projects and waste processing facilities incorporate a tool such as TIPT to improve customer-commercial supplier communications and better optimization of resources. (authors)« less
  • The zinc and copper status of 33 eumenorrheic (EU) and 12 amenorrheic (AM) female marathon runners and 19 EU and 8 AM nonrunners were determined from 3-day diet records and plasma and erythrocyte (RBC) levels. The study was conducted as a completely randomized 2 x 2 factorial. Mean daily zinc intakes of all groups fell below the recommended dietary allowances. Copper intakes of runners (EU = 1.3 mg; AM = 1.3 mg) were not significantly different. Menstrual status did not affect plasma zinc, RBC zinc or plasma copper levels. Physical activity however, affected RBC zinc and plasma copper levels. Bothmore » these parameters were significantly higher in runners. These findings suggest that exercise influences blood zinc and copper levels.« less
  • Several elements are included in planning the DOE`s transportation and systems program: (1) the primary material -- spent fuel, special fuel, other unique materials including defense high-level waste, and a limited amount of reprocessed commercial high-level waste from West Valley; (2) transportation from the source using legal-weight truck and standard rail shipping casks; (3) MRS receiving, lag storage, dry consolidation using thin-wall canisters in shielded casks; (4) transportation from the MRS using special trains, larger canisters; (5) at-repository lag storage, overpacking, emplacement (Nevada) down ramp into repository; and (6) post-closure considerations. Emphasis is on from-reactor cask designs as there ismore » still considerable time to work out from-MRS designs.« less