skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Techniques for evaluating optimum data center operation

Abstract

Techniques for modeling a data center are provided. In one aspect, a method for determining data center efficiency is provided. The method includes the following steps. Target parameters for the data center are obtained. Technology pre-requisite parameters for the data center are obtained. An optimum data center efficiency is determined given the target parameters for the data center and the technology pre-requisite parameters for the data center.

Inventors:
; ;
Publication Date:
Research Org.:
International Business Machines Corp., Armonk, NY (United States)
Sponsoring Org.:
USDOE
OSTI Identifier:
1363752
Patent Number(s):
9,679,087
Application Number:
13/612,059
Assignee:
International Business Machines Corporation
DOE Contract Number:  
EE00002897
Resource Type:
Patent
Resource Relation:
Patent File Date: 2012 Sep 12
Country of Publication:
United States
Language:
English
Subject:
97 MATHEMATICS AND COMPUTING

Citation Formats

Hamann, Hendrik F., Rodriguez, Sergio Adolfo Bermudez, and Wehle, Hans-Dieter. Techniques for evaluating optimum data center operation. United States: N. p., 2017. Web.
Hamann, Hendrik F., Rodriguez, Sergio Adolfo Bermudez, & Wehle, Hans-Dieter. Techniques for evaluating optimum data center operation. United States.
Hamann, Hendrik F., Rodriguez, Sergio Adolfo Bermudez, and Wehle, Hans-Dieter. Wed . "Techniques for evaluating optimum data center operation". United States. https://www.osti.gov/servlets/purl/1363752.
@article{osti_1363752,
title = {Techniques for evaluating optimum data center operation},
author = {Hamann, Hendrik F. and Rodriguez, Sergio Adolfo Bermudez and Wehle, Hans-Dieter},
abstractNote = {Techniques for modeling a data center are provided. In one aspect, a method for determining data center efficiency is provided. The method includes the following steps. Target parameters for the data center are obtained. Technology pre-requisite parameters for the data center are obtained. An optimum data center efficiency is determined given the target parameters for the data center and the technology pre-requisite parameters for the data center.},
doi = {},
journal = {},
number = ,
volume = ,
place = {United States},
year = {2017},
month = {6}
}

Patent:

Save / Share:

Works referenced in this record:

DATA CENTER CONTROL
patent-application, March 2011


LIQUID COOLED DATA CENTER DESIGN SELECTION
patent-application, November 2013