Title: Pinellas County, Florida, Site Environmental Restoration Project Sitewide Environmental Monitoring Semiannual Progress Report for the Young - Rainey STAR Center June Through November 2016, January 2017

Abstract

The Young - Rainey STAR Center (Science, Technology, and Research Center) at the Pinellas County, Florida, Site is a former U.S. Department of Energy (DOE) facility constructed in the mid-1950s. The 96-acre STAR Center is located in Largo, Florida, and lies in the northeast quarter of Section 13, Township 30 South, Range 15 East (Figure 1). While it was owned by DOE, the purpose of the site was to develop and manufacture components for the nation’s nuclear weapons program. In 1987, the U.S. Environmental Protection Agency (EPA) performed a Resource Conservation and Recovery Act Facility Assessment (EPA 1988) at the site to gather information on potential releases of hazardous materials. In February of 1990, EPA issued a Hazardous and Solid Waste Amendments permit to DOE, requiring DOE to investigate and perform remediation activities in those areas designated as solid-waste management units (SWMUs) contaminated by hazardous materials resulting from DOE operations. A total of 17 SWMUs were identified and investigated at the STAR Center. By 1997, 13 of the 17 SWMUs had been remediated or approved for no further action. More recently, the Florida Department of Environmental Protection (FDEP) executed Conditional Site Rehabilitation Completion Orders for the Northeast Site and themore » Wastewater Neutralization Area on July 27, 2016, stating that no further action is required for those SWMUs. The Building 100 Area (a combination of the Old Drum Storage Site and the Building 100-Industrial Drain Leaks SWMUs) comprises the only two active SWMUs at the STAR Center (Figure 2). This document serves as the semiannual progress report for the SWMUs by providing the results of recent monitoring activities and a summary of ongoing and projected work. The STAR Center is owned by the Pinellas County Industrial Development Authority, but DOE is responsible for remediation activities at the site. Additional background information for the site is contained in the Long-Term Surveillance and Maintenance Plan for the Pinellas Site (DOE 2016a). That document and other site-related documents can be accessed at this website: http://www.lm.doe.gov/Pinellas/Sites.aspx.« less

Authors:
 [1];  [2]
  1. USDOE Office of Legacy Management, Washington, DC (United States)
  2. Navarro Research and Engineering, Inc., Oak Ridge, TN (United States)
Publication Date:
Research Org.:
USDOE Office of Legacy Management, Washington, DC (United States)
Sponsoring Org.:
USDOE Office of Legacy Management (LM), Office of Site Operations (LM-20)
OSTI Identifier:
1351084
Report Number(s):
N02130
DOE Contract Number:
LM0000421
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
54 ENVIRONMENTAL SCIENCES; June through November 2016 Pinellas, FL

Citation Formats

Surovchak, Scott, and Daniel, Joe. Pinellas County, Florida, Site Environmental Restoration Project Sitewide Environmental Monitoring Semiannual Progress Report for the Young - Rainey STAR Center June Through November 2016, January 2017. United States: N. p., 2017. Web. doi:10.2172/1351084.
Surovchak, Scott, & Daniel, Joe. Pinellas County, Florida, Site Environmental Restoration Project Sitewide Environmental Monitoring Semiannual Progress Report for the Young - Rainey STAR Center June Through November 2016, January 2017. United States. doi:10.2172/1351084.
Surovchak, Scott, and Daniel, Joe. Sun . "Pinellas County, Florida, Site Environmental Restoration Project Sitewide Environmental Monitoring Semiannual Progress Report for the Young - Rainey STAR Center June Through November 2016, January 2017". United States. doi:10.2172/1351084. https://www.osti.gov/servlets/purl/1351084.
@article{osti_1351084,
title = {Pinellas County, Florida, Site Environmental Restoration Project Sitewide Environmental Monitoring Semiannual Progress Report for the Young - Rainey STAR Center June Through November 2016, January 2017},
author = {Surovchak, Scott and Daniel, Joe},
abstractNote = {The Young - Rainey STAR Center (Science, Technology, and Research Center) at the Pinellas County, Florida, Site is a former U.S. Department of Energy (DOE) facility constructed in the mid-1950s. The 96-acre STAR Center is located in Largo, Florida, and lies in the northeast quarter of Section 13, Township 30 South, Range 15 East (Figure 1). While it was owned by DOE, the purpose of the site was to develop and manufacture components for the nation’s nuclear weapons program. In 1987, the U.S. Environmental Protection Agency (EPA) performed a Resource Conservation and Recovery Act Facility Assessment (EPA 1988) at the site to gather information on potential releases of hazardous materials. In February of 1990, EPA issued a Hazardous and Solid Waste Amendments permit to DOE, requiring DOE to investigate and perform remediation activities in those areas designated as solid-waste management units (SWMUs) contaminated by hazardous materials resulting from DOE operations. A total of 17 SWMUs were identified and investigated at the STAR Center. By 1997, 13 of the 17 SWMUs had been remediated or approved for no further action. More recently, the Florida Department of Environmental Protection (FDEP) executed Conditional Site Rehabilitation Completion Orders for the Northeast Site and the Wastewater Neutralization Area on July 27, 2016, stating that no further action is required for those SWMUs. The Building 100 Area (a combination of the Old Drum Storage Site and the Building 100-Industrial Drain Leaks SWMUs) comprises the only two active SWMUs at the STAR Center (Figure 2). This document serves as the semiannual progress report for the SWMUs by providing the results of recent monitoring activities and a summary of ongoing and projected work. The STAR Center is owned by the Pinellas County Industrial Development Authority, but DOE is responsible for remediation activities at the site. Additional background information for the site is contained in the Long-Term Surveillance and Maintenance Plan for the Pinellas Site (DOE 2016a). That document and other site-related documents can be accessed at this website: http://www.lm.doe.gov/Pinellas/Sites.aspx.},
doi = {10.2172/1351084},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Sun Jan 01 00:00:00 EST 2017},
month = {Sun Jan 01 00:00:00 EST 2017}
}

Technical Report:

Save / Share:
  • This Pinellas County, Florida, Site Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site describes environmental restoration activities for the 4.5 Acre Site located in Pinellas County, Largo, Florida (Figure 1). The former U.S. Department of Energy (DOE) Pinellas Plant facility consisted of the 4.5 Acre Site and what is now the STAR Center (Young - Rainey Science, Technology, and Research Center). Both the 4.5 Acre Site and the STAR Center are part of the overall Pinellas County, Florida, Site (Figure 2). The 4.5 Acre Site is located immediately northwest of the STAR Center, in the northeast quartermore » of Section 13, Township 30 South, Range 15 East. DOE owned this parcel from 1957 to 1972, at which time it was sold to a private landowner. During the period of DOE ownership, the property was used for the disposal of drums of waste resins and solvents. As a result of this practice, the surficial aquifer was impacted by volatile organic compounds (VOCs)—trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), vinyl chloride (VC), and benzene. Detailed background information for the site is contained in the Long-Term Surveillance and Maintenance Plan for the Pinellas Site (DOE 2016). That document and other site-related documents can be accessed at this website: http://www.lm.doe.gov/Pinellas/Sites.aspx. Recent remediation activities consist of the injection of emulsified soybean oil and the microorganism Dehalococcoides mccartyi (formerly known as Dehalococcoides ethenogenes) into the subsurface in February 2010 and again in July 2013 to enhance contaminant biodegradation (hereafter described as bioinjection). Monitoring the performance of these actions, in the form of monitoring well sampling, is ongoing.« less
  • Contaminated groundwater associated with Building 100 at the Young-Rainey Science, Technology, and Research Center, formerly the DOE Pinellas plant, is the primary remedial challenge that remains to be addressed at the site. Currently, Building 100 is an active industrial facility that is now owned and operated by the Pinellas county government. Groundwater samples collected from monitoring wells recently installed near the southern boundary of the site suggest that contaminated groundwater has migrated off the plant site. In response to the challenges presented by the Building 100 plume, the Office of Legacy Management (LM) requested assistance from the DOE Office ofmore » Groundwater and Soil Remediation (EM-32) to provide a review team to make technical recommendations so that they can efficiently and effectively address characterization and remediation of the plume. The review team was unanimous in the conclusion that a dynamic strategy that combines a phased implementation of direct push samplers, sensors, and tools can be used to better delineate the extent of contamination, control plume migration, and rapidly remediate the contaminated groundwater at the site. The initial efforts of the team focused on reviewing the site history and data, organizing the information into a conceptual model, identifying appropriate technologies, and recommending an integrated strategy. The current groundwater data from the site indicate a two-lobed plume extending to the east and south. To the east vinyl chloride is the primary contaminant of concern, to the south, vinyl chloride and cis1, 2-DCE are the primary contaminants. The limited data that are available suggest that reductive dechlorination of the TCE is already occurring but is not sufficient to prevent offsite migration of low concentrations of TCE daughter products. The team recommends that DOE pursue a strategy that builds on the natural cleansing capacity of the subsurface with reductive methods including biostimulation and/or bioaugmentation to provide a sustainable remediation system within the flow path of the plume. Additional data will be required to implement this approach and will include: (1) Better delineation of the nature and extent of contamination; (2) Demonstration the plume is currently stable or shrinking; and (3) Demonstration the full reductive dechlorination is occurring. The technical team recommends that DOE use a phased approach to identify residual contamination and to provide rapid installation of remedies. Matrices of characterization and remediation sensors, technologies, and tools were developed by the team in order to match the specific conditions and requirements of the site. The team provides a specific example of remedy that includes the incorporation of a dynamic characterization strategy moving from minimally invasive to more aggressive field techniques, the consideration of multiple complementary remediation approaches based on a spatiotemporally phased approach keyed to the different demands of different parts of the plume, and the integration and sequencing of the characterization and remediation activities.« less
  • In March of 2003, the United States Department of Energy (DOE) completed a full-scale nonaqueous-phase liquid (NAPL) remediation of Area A of the Northeast Site at the Young-Rainey STAR Center, Largo, Florida. The site was contaminated with approximately 2,300 kg (5,000 lbs) of NAPL constituents such as TCE, cis-1,2-DCE, methylene chloride, toluene, and petroleum hydrocarbons. The site was remediated by SteamTech using a combination of steam-enhanced extraction and electrical resistance heating during operations lasting 4.5 months. After the target volume had been heated to or near boiling temperatures, pressure cycles were used to increase the mass removal rates. Each de-pressurizationmore » cycle led to large increases in the vapor phase recovery, until a final phase of diminishing returns was reached. Post-operational sampling at randomly selected locations showed the concentrations of all contaminants of concern (COC) to be well below the remedial goals. The majority of the groundwater samples were below maximum contaminant level (MCL) for all the contaminants of concern. The overall mass balance showed that about 0.5 kg (1 pound) of VOCs remained in the remedial volume, and showed remedial efficiencies of between 99.85 and 99.99 percent for the four chemicals of concern. This is the first full-scale demonstration of complete source removal at a DNAPL site. Since the post-operational sampling shows all concentrations to be below or close to groundwater MCLs, the thermal remedy may be satisfactory for site closure without a polishing phase.« less
  • Project mission was to mitigate the adverse economic effects of closing the U.S. Department of Energy's Pinellas Plant in Largo, Florida. This project was to facilitate the physical renovation of the plant and to help maintain and create jobs for the employees that worked at the plant when DOE terminated its operations. It also included finding and attracting high technology, industrial manufacturing and related firms to utilize the space and high tech equipment to remain at the plant. Stakeholders included the affected plant employees, local government and related public organizations, and businesses and universities in the Tampa Bay Florida area.more » The $17.6 million funded for this project helped produce 2,780 jobs at the Young - Rainey STAR Center at an average cost of $6,328. Rental income from STAR Center tenants and third party cash input amounted to approximately $66 million over the project period of 13.3 years.« less
  • The Gnome-Coach, New Mexico, Site was the location of an underground nuclear test in 1961 and a groundwater tracer test in 1963. Residual contamination remaining in the subsurface from these events requires long-term oversight. The Long-Term Surveillance and Maintenance Plan for the site describes the U.S. Department of Energy Office of Legacy Management’s (LM’s) plan for monitoring groundwater (radiochemical sampling and hydraulic head measurements), inspecting the site, maintaining the site’s institutional controls, evaluating and reporting data, and documenting the site’s records and data management processes. Groundwater monitoring and site inspection activities are conducted annually. This report summarizes the results ofmore » these activities conducted during the October 2015 through September 2016 reporting period. The site inspection and annual sampling were conducted on January 27, 2016. At the time of the site inspection, the signs installed near the emplacement shaft, near well USGS-1, and around the perimeter of the site were observed as being in good condition, as were the roads, wellheads, and Project Gnome monument. No new groundwater extraction wells or oil and gas wells were installed during this reporting period on the site or in the sections that surround the site. One new application was received by the New Mexico Oil Conservation Division to install a salt water disposal well approximately 0.8 miles northeast of the Project Gnome monument. The proposed well has a planned completion depth of 15,500 feet below ground surface, but as of November 2016 a drill date has not been established.« less