skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Heritage plaza parking lots improvement project- Solar PV installation

Abstract

The Agua Caliente Band of Cahuilla Indians (ACBCI or the “Tribe”) installed a 79.95 kW solar photovoltaic (PV) system to offset the energy usage costs of the Tribal Education and Family Services offices located at the Tribe's Heritage Plaza office building, 90I Tahquitz Way, Palm Springs, CA, 92262 (the "Project"). The installation of the Solar PV system was part of the larger Heritage Plaza Parking Lot Improvements Project and mounted on the two southern carport shade structures. The solar PV system will offset 99% of the approximately 115,000 kWh in electricity delivered annually by Southern California Edison (SCE) to the Tribal Education and Family Services offices at Heritage Plaza, reducing their annual energy costs from approximately $22,000 annually to approximately $200. The total cost of the proposed solar PV system is $240,000.

Authors:
 [1]
  1. Agua Caliente Indian Reservation, Palm Springs, CA (United States)
Publication Date:
Research Org.:
Agua Caliente Indian Reservation, Palm Springs, CA (United States)
Sponsoring Org.:
USDOE The Office of Indian Energy Policy and Programs (IE)
OSTI Identifier:
1349229
Report Number(s):
DOE-ACBCI-0006945
7606996800
DOE Contract Number:  
EE0006945
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
14 SOLAR ENERGY; Agua Caliente Tribe; Tribe; solar; photovoltaics; solar carports

Citation Formats

Hooks, Todd. Heritage plaza parking lots improvement project- Solar PV installation. United States: N. p., 2017. Web. doi:10.2172/1349229.
Hooks, Todd. Heritage plaza parking lots improvement project- Solar PV installation. United States. doi:10.2172/1349229.
Hooks, Todd. Fri . "Heritage plaza parking lots improvement project- Solar PV installation". United States. doi:10.2172/1349229. https://www.osti.gov/servlets/purl/1349229.
@article{osti_1349229,
title = {Heritage plaza parking lots improvement project- Solar PV installation},
author = {Hooks, Todd},
abstractNote = {The Agua Caliente Band of Cahuilla Indians (ACBCI or the “Tribe”) installed a 79.95 kW solar photovoltaic (PV) system to offset the energy usage costs of the Tribal Education and Family Services offices located at the Tribe's Heritage Plaza office building, 90I Tahquitz Way, Palm Springs, CA, 92262 (the "Project"). The installation of the Solar PV system was part of the larger Heritage Plaza Parking Lot Improvements Project and mounted on the two southern carport shade structures. The solar PV system will offset 99% of the approximately 115,000 kWh in electricity delivered annually by Southern California Edison (SCE) to the Tribal Education and Family Services offices at Heritage Plaza, reducing their annual energy costs from approximately $22,000 annually to approximately $200. The total cost of the proposed solar PV system is $240,000.},
doi = {10.2172/1349229},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Mar 31 00:00:00 EDT 2017},
month = {Fri Mar 31 00:00:00 EDT 2017}
}

Technical Report:

Save / Share: