skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: TA-60-1 Heavy Equipment Shop Areas SWPPP Rev 2 Jan 2017-Final

Abstract

The primary activities and equipment areas at the facility that are potential stormwater pollution sources include; The storage of vehicles and heavy equipment awaiting repair; or repaired vehicles waiting to be picked up; The storage and handling of oils, anti-freeze, solvents, degreasers, batteries and other chemicals for the maintenance of vehicles and heavy equipment; and Equipment cleaning operations including exterior vehicle wash-down. Steam cleaning is only done on the steam cleaning pad area located at the north east end of Building 60-0001.

Authors:
 [1]
  1. Los Alamos National Lab. (LANL), Los Alamos, NM (United States)
Publication Date:
Research Org.:
Los Alamos National Lab. (LANL), Los Alamos, NM (United States)
Sponsoring Org.:
USDOE
OSTI Identifier:
1342882
Report Number(s):
LA-UR-17-20928
DOE Contract Number:
AC52-06NA25396
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
54 ENVIRONMENTAL SCIENCES; 12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; Storm water; Environmental Protection

Citation Formats

Burgin, Jillian Elizabeth. TA-60-1 Heavy Equipment Shop Areas SWPPP Rev 2 Jan 2017-Final. United States: N. p., 2017. Web. doi:10.2172/1342882.
Burgin, Jillian Elizabeth. TA-60-1 Heavy Equipment Shop Areas SWPPP Rev 2 Jan 2017-Final. United States. doi:10.2172/1342882.
Burgin, Jillian Elizabeth. Tue . "TA-60-1 Heavy Equipment Shop Areas SWPPP Rev 2 Jan 2017-Final". United States. doi:10.2172/1342882. https://www.osti.gov/servlets/purl/1342882.
@article{osti_1342882,
title = {TA-60-1 Heavy Equipment Shop Areas SWPPP Rev 2 Jan 2017-Final},
author = {Burgin, Jillian Elizabeth},
abstractNote = {The primary activities and equipment areas at the facility that are potential stormwater pollution sources include; The storage of vehicles and heavy equipment awaiting repair; or repaired vehicles waiting to be picked up; The storage and handling of oils, anti-freeze, solvents, degreasers, batteries and other chemicals for the maintenance of vehicles and heavy equipment; and Equipment cleaning operations including exterior vehicle wash-down. Steam cleaning is only done on the steam cleaning pad area located at the north east end of Building 60-0001.},
doi = {10.2172/1342882},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Tue Feb 07 00:00:00 EST 2017},
month = {Tue Feb 07 00:00:00 EST 2017}
}

Technical Report:

Save / Share:
  • The TA-3-38 CS is part of LANL’s Utilities and Infrastructure (UI) Facilities Operations Directorate (FOD) with day-to-day management provided by the Logistics Division Central Shops (LOG-CS); which has established a Stormwater Pollution Prevention Team (PPT) whose members are responsible for assisting the facility manager in developing and revising the facility’s SWPPP as well as maintaining control measures and taking corrective actions when required. All PPT members will have access to either a hard copy or an electronic version of this SWPPP. A list of PPT members along with duties and contact information is provided in Appendix A of this SWPPP
  • The Stormwater Pollution Prevention Team (PPT) for the TA-60-0002 Salvage and Warehouse Area consists of operations and management personnel from the facility, Multi-Sector General Permitting (MSGP) stormwater personnel from Environmental Compliance Programs (EPC-CP) organization, and Deployed Environmental Professionals. The EPC-CP representative is responsible for Laboratory compliance under the National Pollutant Discharge Elimination System (NPDES) permit regulations. The team members are selected on the basis of their familiarity with the activities at the facility and the potential impacts of those activities on stormwater runoff. The Warehouse and Salvage Yard are a single shift operation; therefore, a member of the PPT ismore » always present during operations.« less
  • This is a regulatory compliance report for the TA-3 Power and Steam plant.
  • The TA-3-38 MFS is part of LANL’s Utilities and Infrastructures (UI) Facilities Operations Directorate (FOD) with day-to-day management provided by the Logistics Division Central Shops (LOG-CS); which has established a Stormwater Pollution Prevention Team (PPT) whose members are responsible for assisting the facility manager in developing and revising the facility’s SWPPP as well as maintaining control measures and taking corrective actions when required. All PPT members will have access to either a hard copy or an electronic version of this SWPPP. A list of PPT members along with duties and contact information is provided in Appendix A of this SWPPP.
  • The storm water pollution prevention plan for Los Alamos National Laboratory.