Title: PF-WFS Shell Inspection Update December 2016

Abstract

Since the last project update in FY16:Q2, PF-WFS personnel have advanced in understanding of shell inspection on Coordinate Measuring Machines {CMM} and refined the PF-WFS process to the point it was decided to convert shell inspection from the Sheffield #1 gage to Lietz CM Ms. As a part of introspection on the quality of this process many sets of data have been reviewed and analyzed. This analysis included Sheffield to CMM comparisons, CMM inspection repeatability, fixturing differences, quality check development, probing approach changes. This update report will touch on these improvements that have built the confidence in this process to mainstream it inspecting shells. In addition to the CMM programming advancements, the continuation in refinement of input and outputs for the CMM program has created an archiving scheme, input spline files, an output metafile, and inspection report package. This project will continue to mature. Part designs may require program modifications to accommodate "new to this process" part designs. Technology limitations tied to security and performance are requiring possible changes to computer configurations to support an automated process.

Authors:
 [1];  [1];  [1];  [1];  [1];  [1]
  1. Los Alamos National Lab. (LANL), Los Alamos, NM (United States)
Publication Date:
Research Org.:
Los Alamos National Lab. (LANL), Los Alamos, NM (United States)
Sponsoring Org.:
USDOE National Nuclear Security Administration (NNSA)
OSTI Identifier:
1341830
Report Number(s):
LA-UR-17-20561
DOE Contract Number:
AC52-06NA25396
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
42 ENGINEERING; shell inspection

Citation Formats

Vigil, Anthony Eugene, Ledoux, Reina Rebecca, Gonzales, Antonio R., Montano, Joshua Daniel, Savage, Lowell Curtis, and Randles, Wayne Alfred. PF-WFS Shell Inspection Update December 2016. United States: N. p., 2017. Web. doi:10.2172/1341830.
Vigil, Anthony Eugene, Ledoux, Reina Rebecca, Gonzales, Antonio R., Montano, Joshua Daniel, Savage, Lowell Curtis, & Randles, Wayne Alfred. PF-WFS Shell Inspection Update December 2016. United States. doi:10.2172/1341830.
Vigil, Anthony Eugene, Ledoux, Reina Rebecca, Gonzales, Antonio R., Montano, Joshua Daniel, Savage, Lowell Curtis, and Randles, Wayne Alfred. Thu . "PF-WFS Shell Inspection Update December 2016". United States. doi:10.2172/1341830. https://www.osti.gov/servlets/purl/1341830.
@article{osti_1341830,
title = {PF-WFS Shell Inspection Update December 2016},
author = {Vigil, Anthony Eugene and Ledoux, Reina Rebecca and Gonzales, Antonio R. and Montano, Joshua Daniel and Savage, Lowell Curtis and Randles, Wayne Alfred},
abstractNote = {Since the last project update in FY16:Q2, PF-WFS personnel have advanced in understanding of shell inspection on Coordinate Measuring Machines {CMM} and refined the PF-WFS process to the point it was decided to convert shell inspection from the Sheffield #1 gage to Lietz CM Ms. As a part of introspection on the quality of this process many sets of data have been reviewed and analyzed. This analysis included Sheffield to CMM comparisons, CMM inspection repeatability, fixturing differences, quality check development, probing approach changes. This update report will touch on these improvements that have built the confidence in this process to mainstream it inspecting shells. In addition to the CMM programming advancements, the continuation in refinement of input and outputs for the CMM program has created an archiving scheme, input spline files, an output metafile, and inspection report package. This project will continue to mature. Part designs may require program modifications to accommodate "new to this process" part designs. Technology limitations tied to security and performance are requiring possible changes to computer configurations to support an automated process.},
doi = {10.2172/1341830},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Thu Jan 26 00:00:00 EST 2017},
month = {Thu Jan 26 00:00:00 EST 2017}
}

Technical Report:

Save / Share:
  • Corrective Action Unit (CAU) 98: Frenchman Flat on the Nevada National Security Site was the location of 10 underground nuclear tests. CAU 98 underwent a series of investigations and actions in accordance with the Federal Facility Agreement and Consent Order to assess contamination of groundwater by radionuclides from the tests. A Closure Report completed that process in 2016 and called for long-term monitoring, use restrictions (URs), and institutional controls to protect the public and environment from potential exposure to contaminated groundwater. Three types of monitoring are performed for CAU 98: water quality, water level, and institutional control. These are evaluatedmore » to determine whether the UR boundaries remain protective of human health and the environment, and to ensure that the regulatory boundary objectives are being met. Additionally, monitoring data are used to evaluate consistency with the groundwater flow and contaminant transport models because the contaminant boundaries (CBs) calculated with the models are the primary basis of the UR boundaries. In summary, the monitoring results from 2016 indicate the regulatory controls on the closure of CAU 98 remain effective in protection of human health and the environment. Recommendations resulting from this first year of monitoring activities include formally incorporating wells UE-5 PW-1, UE-5 PW-2, and UE-5 PW-3 into the groundwater-level monitoring network given their strategic location in the basin; and early development of a basis for trigger levels for the groundwater-level monitoring given the observed trends. Additionally, it is recommended to improve the Real Estate/Operations Permit process for capturing information important for evaluating the impact of activities on groundwater resources, and to shift the reporting requirement for this annual report from the second quarter of the federal fiscal year (end of March) to the second quarter of the calendar year (end of June).« less
  • IIn March 2015, the U.S. Department of Energy (DOE) released Wind Vision: A New Era for Wind Power in the United States (DOE 2015), which explores a scenario in which wind provides 10 percent of U.S. electricity in 2020, 20 percent in 2030, and 35 percent in 2050. The Wind Vision report also includes a roadmap of recommended actions aimed at pursuit of the vision and its underlying wind-deployment scenario. The roadmap was compiled by the Wind Vision project team, which included representatives from the industrial, electric-power, government-laboratory, academic, environmental-stewardship, regulatory, and permitting stakeholder groups. The roadmap describes high-level activitiesmore » suitable for all sectors with a stake in wind power and energy development. It is intended to be a 'living document,' and DOE expects to engage the wind community from time to time to track progress.« less
  • The Site A/Plot M, Illinois, Decommissioned Reactor Site was inspected on May 17, 2016. The site, located within Cook County forest preserve that is open to the public, was found to be in good condition with one exception. Erosion on top of the grass-covered mound at Plot M continues to be a concern as presented in previous inspections. Ruts form in the soil on top of Plot M as a result of bike traffic using the open field as a pass thru between established bike trails within the forest preserve. Argonne National Laboratory (ANL) who is contracted directly from U.S.more » Department of Energy (DOE) has filled in the ruts with top soil and reseeding remains an ongoing process. Reseeded areas from 2015 are progressing nicely. No cause for a follow-up inspection was identified. In 2015, ANL plugged and abandoned 8 of 25 monitoring wells (BH41, BH51, BH52, BH54, DH9, DH10, DH13, and DH17). The 17 groundwater monitoring wells remaining at the site were inspected to confirm that they were locked and in good condition. Preliminary environmental monitoring results for 2015 are provided in a draft report titled Surveillance of Site A and Plot M, Report for 2015, prepared by ANL. The report also contains results of an independent analysis conducted by the Illinois Emergency Management Agency on some of the samples collected by ANL in 2015. The draft report states that the results of the surveillance program continue to indicate that the impact of radioactivity at Site A/Plot M is very low and does not endanger the health of those living in the area or visiting the site. The ANL monitoring report will be made available to the public on the DOE Office of Legacy Management public website when it is issued as final. A new county forest preserve campsite opened in 2015 at Bull Frog Lake, which is east of Plot M. Hiking trails connect Bull Frog Lake with Site A/Plot M. The site might receive more traffic from forest preserve visitors now that this new campsite is opened.« less
  • This report presents the findings of the annual inspection and radiological survey of the Piqua, Ohio, Decommissioned Reactor Site (site). The decommissioned nuclear power demonstration facility was inspected and surveyed on April 15, 2016. The site, located on the east bank of the Great Miami River in Piqua, Ohio, was in fair physical condition. There is no requirement for a follow-up inspection, partly because City of Piqua (City) personnel participated in a March 2016 meeting to address reoccurring safety concerns. Radiological survey results from 104 locations revealed no removable contamination. One direct beta activity reading in a floor drain onmore » the 56-foot level (1674 disintegrations per minute [dpm]/100 square centimeters [cm2]) exceeded the minimum detectable activity (MDA). Beta activity has been detected in the past at this floor drain. The reading was well below the action level of 5000 dpm/100 cm2.« less
  • This report updates the 2013 report of the same title. Some text originally published in that report is retained and indicated in gray. In support of the national goals for biofuel use in the United States, numerous technologies have been developed that convert biomass to biofuels. Some of these biomass to biofuel conversion technology pathways are operating at commercial scales, while others are in earlier stages of development. The advancement of a new pathway toward commercialization involves various types of progress, including yield improvements, process engineering, and financial performance. Actions of private investors and public programs can accelerate the demonstrationmore » and deployment of new conversion technology pathways. These investors (both private and public) will pursue a range of pilot, demonstration, and pioneer scale biorefinery investments; the most cost-effective set of investments for advancing the maturity of any given biomass to biofuel conversion technology pathway is unknown. In some cases, whether or not the pathway itself will ultimately be technically and financially successful is also unknown. This report presents results from the Biomass Scenario Model--a system dynamics model of the biomass to biofuels system--that estimate effects of investments in biorefineries at different maturity levels and operational scales. The report discusses challenges in estimating effects of such investments and explores the interaction between this deployment investment and a volumetric production incentive. Model results show that investments in demonstration and deployment have a substantial growth impact on the development of the biofuels industry. Results also show that other conditions, such as accompanying incentives, have major impacts on the effectiveness of such investments. Results from the 2013 report are compared to new results. This report does not advocate for or against investments, incentives, or policies, but analyzes simulations of their hypothetical effects.« less