skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: The New Transfer Line Collimation System for the LHC High Luminosity Era

Conference ·
OSTI ID:1296917

A set of passive absorbers is located at the end of each of the 3 km long injection lines to protect the LHC in case of failures during the extraction process from the LHC’s last pre-injector or the beam transfer itself. In case of an erroneous extraction, the absorbers have to attenuate the beam to a safe level and be robust enough themselves to survive the impact. These requirements are difficult to fulfil with the very bright and intense beams produced by the LHC injectors for the high luminosity era. This paper revisits the requirements for the SPS-to-LHC transfer line collimation system and the adapted strategy to fulfill these for the LHC high luminosity operation. A possible solution for the new transfer line collimation system is presented.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC), High Energy Physics (HEP)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1296917
Report Number(s):
FERMILAB-CONF-14-405-APC; 1314151
Resource Relation:
Conference: 5th International Particle Accelerator Conference, Dresden, Germany, 06/16-06/20/2014
Country of Publication:
United States
Language:
English

Similar Records

Changes to the Transfer Line Collimation System for the High-Luminosity LHC Beams
Conference · Mon Jun 01 00:00:00 EDT 2015 · OSTI ID:1296917

Hollow electron lenses for beam collimation at the High-Luminosity Large Hadron Collider (HL-LHC)
Journal Article · Wed Mar 31 00:00:00 EDT 2021 · Journal of Instrumentation · OSTI ID:1296917

LHC luminosity upgrade with large Piwinski angle scheme: a recent look
Conference · Thu Sep 01 00:00:00 EDT 2011 · OSTI ID:1296917

Related Subjects