Title: LCOE Uncertainty Analysis for Hydropower using Monte Carlo Simulations

Abstract

Levelized Cost of Energy (LCOE) is an important metric to evaluate the cost and performance of electricity production generation alternatives, and combined with other measures, can be used to assess the economics of future hydropower development. Multiple assumptions on input parameters are required to calculate the LCOE, which each contain some level of uncertainty, in turn affecting the accuracy of LCOE results. This paper explores these uncertainties, their sources, and ultimately the level of variability they introduce at the screening level of project evaluation for non-powered dams (NPDs) across the U.S. Owing to site-specific differences in site design, the LCOE for hydropower varies significantly from project to project unlike technologies with more standardized configurations such as wind and gas. Therefore, to assess the impact of LCOE input uncertainty on the economics of U.S. hydropower resources, these uncertainties must be modeled across the population of potential opportunities. To demonstrate the impact of uncertainty, resource data from a recent nationwide non-powered dam (NPD) resource assessment (Hadjerioua et al., 2012) and screening-level predictive cost equations (O Connor et al., 2015) are used to quantify and evaluate uncertainties in project capital and operations & maintenance costs, and generation potential at broad scale. LCOE dependencemore » on financial assumptions is also evaluated on a sensitivity basis to explore ownership/investment implications on project economics for the U.S. hydropower fleet. The results indicate that the LCOE for U.S. NPDs varies substantially. The LCOE estimates for the potential NPD projects of capacity greater than 1 MW range from 40 to 182 $/MWh, with average of 106 $/MWh. 4,000 MW could be developed through projects with individual LCOE values below 100 $/MWh. The results also indicate that typically 90 % of LCOE uncertainty can be attributed to uncertainties in capital costs and energy production; however, for small projects (below 10 MW) O&M uncertainty plays an important role. The potential NPDs have costs with uncertainty bands extending well above 100 $/MWh in some cases. A truly representative evaluation should complement LCOE with an assessment of potential revenues from the provision of ancillary services. Moreover, hydroelectric production is often part of multipurpose water resource projects where other purposes (e.g., irrigation, flood control, navigation, recreation, etc.) also provide value. Neither of these considerations are accounted for LCOE.« less

Authors:
 [1];  [1];  [1]
  1. ORNL
Publication Date:
Research Org.:
Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)
Sponsoring Org.:
USDOE
OSTI Identifier:
1267061
DOE Contract Number:  
AC05-00OR22725
Resource Type:
Conference
Resource Relation:
Conference: HydroVision International 2015, Portland, OR, USA, 20150714, 20150717
Country of Publication:
United States
Language:
English

Citation Formats

O'Connor, Patrick W, Uria Martinez, Rocio, and Kao, Shih-Chieh. LCOE Uncertainty Analysis for Hydropower using Monte Carlo Simulations. United States: N. p., 2015. Web.
O'Connor, Patrick W, Uria Martinez, Rocio, & Kao, Shih-Chieh. LCOE Uncertainty Analysis for Hydropower using Monte Carlo Simulations. United States.
O'Connor, Patrick W, Uria Martinez, Rocio, and Kao, Shih-Chieh. Thu . "LCOE Uncertainty Analysis for Hydropower using Monte Carlo Simulations". United States. doi:.
@article{osti_1267061,
title = {LCOE Uncertainty Analysis for Hydropower using Monte Carlo Simulations},
author = {O'Connor, Patrick W and Uria Martinez, Rocio and Kao, Shih-Chieh},
abstractNote = {Levelized Cost of Energy (LCOE) is an important metric to evaluate the cost and performance of electricity production generation alternatives, and combined with other measures, can be used to assess the economics of future hydropower development. Multiple assumptions on input parameters are required to calculate the LCOE, which each contain some level of uncertainty, in turn affecting the accuracy of LCOE results. This paper explores these uncertainties, their sources, and ultimately the level of variability they introduce at the screening level of project evaluation for non-powered dams (NPDs) across the U.S. Owing to site-specific differences in site design, the LCOE for hydropower varies significantly from project to project unlike technologies with more standardized configurations such as wind and gas. Therefore, to assess the impact of LCOE input uncertainty on the economics of U.S. hydropower resources, these uncertainties must be modeled across the population of potential opportunities. To demonstrate the impact of uncertainty, resource data from a recent nationwide non-powered dam (NPD) resource assessment (Hadjerioua et al., 2012) and screening-level predictive cost equations (O Connor et al., 2015) are used to quantify and evaluate uncertainties in project capital and operations & maintenance costs, and generation potential at broad scale. LCOE dependence on financial assumptions is also evaluated on a sensitivity basis to explore ownership/investment implications on project economics for the U.S. hydropower fleet. The results indicate that the LCOE for U.S. NPDs varies substantially. The LCOE estimates for the potential NPD projects of capacity greater than 1 MW range from 40 to 182 $/MWh, with average of 106 $/MWh. 4,000 MW could be developed through projects with individual LCOE values below 100 $/MWh. The results also indicate that typically 90 % of LCOE uncertainty can be attributed to uncertainties in capital costs and energy production; however, for small projects (below 10 MW) O&M uncertainty plays an important role. The potential NPDs have costs with uncertainty bands extending well above 100 $/MWh in some cases. A truly representative evaluation should complement LCOE with an assessment of potential revenues from the provision of ancillary services. Moreover, hydroelectric production is often part of multipurpose water resource projects where other purposes (e.g., irrigation, flood control, navigation, recreation, etc.) also provide value. Neither of these considerations are accounted for LCOE.},
doi = {},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Thu Jan 01 00:00:00 EST 2015},
month = {Thu Jan 01 00:00:00 EST 2015}
}

Conference:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that hold this conference proceeding.

Save / Share: