skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Interface Control Document for the EMPACT Module that Estimates Electric Power Transmission System Response to EMP-Caused Damage

Abstract

The EPREP code is designed to evaluate the effects of an Electro-Magnetic Pulse (EMP) on the electric power transmission system. The EPREP code embodies an umbrella framework that allows a user to set up analysis conditions and to examine analysis results. The code links to three major physics/engineering modules. The first module describes the EM wave in space and time. The second module evaluates the damage caused by the wave on specific electric power (EP) transmission system components. The third module evaluates the consequence of the damaged network on its (reduced) ability to provide electric power to meet demand. This third module is the focus of the present paper. The EMPACT code serves as the third module. The EMPACT name denotes EMP effects on Alternating Current Transmission systems. The EMPACT algorithms compute electric power transmission network flow solutions under severely damaged network conditions. Initial solutions are often characterized by unacceptible network conditions including line overloads and bad voltages. The EMPACT code contains algorithms to adjust optimally network parameters to eliminate network problems while minimizing outages. System adjustments include automatically adjusting control equipment (generator V control, variable transformers, and variable shunts), as well as non-automatic control of generator power settings andmore » minimal load shedding. The goal is to evaluate the minimal loss of customer load under equilibrium (steady-state) conditions during peak demand.« less

Authors:
 [1];  [2]
  1. Los Alamos National Lab. (LANL), Los Alamos, NM (United States)
  2. Los Alamos National Lab. (LANL), Los Alamos, NM (United States)ory
Publication Date:
Research Org.:
Los Alamos National Lab. (LANL), Los Alamos, NM (United States)
Sponsoring Org.:
USDOE National Nuclear Security Administration (NNSA)
OSTI Identifier:
1259633
Report Number(s):
LA-UR-16-24478
DOE Contract Number:
AC52-06NA25396
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
97 MATHEMATICS AND COMPUTING; 24 POWER TRANSMISSION AND DISTRIBUTION; Energy Sciences

Citation Formats

Werley, Kenneth Alan, and Mccown, Andrew William. Interface Control Document for the EMPACT Module that Estimates Electric Power Transmission System Response to EMP-Caused Damage. United States: N. p., 2016. Web. doi:10.2172/1259633.
Werley, Kenneth Alan, & Mccown, Andrew William. Interface Control Document for the EMPACT Module that Estimates Electric Power Transmission System Response to EMP-Caused Damage. United States. doi:10.2172/1259633.
Werley, Kenneth Alan, and Mccown, Andrew William. 2016. "Interface Control Document for the EMPACT Module that Estimates Electric Power Transmission System Response to EMP-Caused Damage". United States. doi:10.2172/1259633. https://www.osti.gov/servlets/purl/1259633.
@article{osti_1259633,
title = {Interface Control Document for the EMPACT Module that Estimates Electric Power Transmission System Response to EMP-Caused Damage},
author = {Werley, Kenneth Alan and Mccown, Andrew William},
abstractNote = {The EPREP code is designed to evaluate the effects of an Electro-Magnetic Pulse (EMP) on the electric power transmission system. The EPREP code embodies an umbrella framework that allows a user to set up analysis conditions and to examine analysis results. The code links to three major physics/engineering modules. The first module describes the EM wave in space and time. The second module evaluates the damage caused by the wave on specific electric power (EP) transmission system components. The third module evaluates the consequence of the damaged network on its (reduced) ability to provide electric power to meet demand. This third module is the focus of the present paper. The EMPACT code serves as the third module. The EMPACT name denotes EMP effects on Alternating Current Transmission systems. The EMPACT algorithms compute electric power transmission network flow solutions under severely damaged network conditions. Initial solutions are often characterized by unacceptible network conditions including line overloads and bad voltages. The EMPACT code contains algorithms to adjust optimally network parameters to eliminate network problems while minimizing outages. System adjustments include automatically adjusting control equipment (generator V control, variable transformers, and variable shunts), as well as non-automatic control of generator power settings and minimal load shedding. The goal is to evaluate the minimal loss of customer load under equilibrium (steady-state) conditions during peak demand.},
doi = {10.2172/1259633},
journal = {},
number = ,
volume = ,
place = {United States},
year = 2016,
month = 6
}

Technical Report:

Save / Share:
  • The Nuclear Damage Assessment Module (NUCDAM) was developed to be used in the Naval Nuclear Warfare Simulation (NNWS) for calculating damage to naval units involvd in tactical nuclear weapon engagements at sea. The purpose of the NNWS Nuclear Damage Assessment Module is to determine the degree of weapon system impairment to a naval unit (submarine or surface ship) that has been subjected to the effects of a nuclear burst. Damage to naval units from a tactical engagement is determined by calculating the nuclear environment based on weapon yield and weapon-target geometry and then relating the calculated environment to damage thresholdmore » parameters associated with the target to determine the degree of impairment to the operational attributes (OATs) that describe the naval unit. This report contains user information about the various versions of NUCDAM currently operating in the Fleet and the configuration management plan by which changes to NUCDAM are initiated.« less
  • This document describes the functional and physical interfaces between the Tank Waste Remediation System (TWRS) Privatization Phase 1 Infrastructure Project W-519 and the various other projects (i.e., Projects W-314, W-464, W-465, and W-520) supporting Phase 1 that will require the allocation of land in and about the Privatization Phase 1 Site and/or interface with the utilities extended by Project W-519. Project W-519 will identify land use allocations and upgrade/extend several utilities in the 200-East Area into the Privatization Phase 1 Site (formerly the Grout Disposal Compound) in preparation for the Privatization Contractors (PC) to construct treatment facilities. The project willmore » upgrade/extend: Roads, Electrical Power, Raw Water (for process and fire suppression), Potable Water, and Liquid Effluent collection. The replacement of an existing Sanitary Sewage treatment system that may be displaced by Phase 1 site preparation activities may also be included.« less
  • This document discusses the interface between the Tank Waste Remediation System (TWRS) and the Solid Waste Division (SWD).
  • This Interface Control Document (ICD) describes the interface between the Double-Shell Tank (DST) System and T Plant. T Plant generates waste during decontamination activities. These facilities do not have a direct physical interface since the waste will be moved by tank trailer to the 204-AR waste unloading facility. The purpose of the ICD process is to formalize working agreements between the River Protection Project (WP) DST System and organization/companies internal and external to RPP. This ICD has been developed as part of the requirements basis for design of the DST System to support the Phase I Privatization effort.
  • This Interface Control Document (ICD) describes the interface between the Tank Farm System and the Central Waste Complex (CWC) or the Low-Level Burial Ground (LLBG). The Tank Farm System generates solid waste during operations. These facilities do not have a direct physical interface since the waste will be moved by truck to the CWC or LLBG. The purpose of the ICD process is to formalize working agreements between the River Protection Project (RPP) Tank Farm System and organization/companies internal and external to RPP. This ICD has been developed as part of the requirements basis for design of the DST Systemmore » to support the Phase I Privatization effort. The signatures on the cover page of this document indicate agreement between the parties that this document reflects the current technical baseline for each system and that the requirements contained in this document will not be revised without the agreement of all parties.« less