skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Getting Software Ready for Future Systems.


Abstract not provided.

Publication Date:
Research Org.:
Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)
Sponsoring Org.:
USDOE National Nuclear Security Administration (NNSA)
OSTI Identifier:
Report Number(s):
DOE Contract Number:
Resource Type:
Resource Relation:
Conference: Proposed for presentation at the ASC PI Meeting held February 9-12, 2015 in Monterey , Ca.
Country of Publication:
United States

Citation Formats

Laros, James H.,. Getting Software Ready for Future Systems.. United States: N. p., 2015. Web.
Laros, James H.,. Getting Software Ready for Future Systems.. United States.
Laros, James H.,. 2015. "Getting Software Ready for Future Systems.". United States. doi:.
title = {Getting Software Ready for Future Systems.},
author = {Laros, James H.,},
abstractNote = {Abstract not provided.},
doi = {},
journal = {},
number = ,
volume = ,
place = {United States},
year = 2015,
month = 2

Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that hold this conference proceeding.

Save / Share:
  • The authors feel that energy-policy planners should assume surprises and develop a resilient energy system after assessing the vulnerabilities of the present system. The major vulnerability of our dependence on Persian Gulf oil could be relieved by weatherizing buildings and driving fuel-efficient vehicles. Individual actions in these areas can often have more impact than government initiatives. The country can also become less vulnerable by making it possible to isolate individual facilities in interconnected energy-distribution systems. Public awareness, knowledge, and willingness to act are the best preparation for future unknowns. (DCK)
  • The Waste Isolation Pilot Plant (WIPP) Waste Acceptance Criteria (WAC) serve as the primary directive for assuring the safe handling, transportation, and disposal of transuranic (TRU) waste generated at Department of Energy (DOE) sites. The WIPP WAC address fulfillment of WIPP`s operational safety and performance assessment criteria, compliance with Resource Conservation and Recovery Act (RCRA) requirements, and preparation of waste packages that meet all transportation criteria. At individual generator sites, preparation of transuranic waste for final disposal at WIPP includes characterizing the waste to meet the requirements of the transuranic Waste Characterization Quality Assurance Program Plan (QAPP) and certifying wastemore » containers to meet the WIPP WAC and the Transuranic Package Transporter-II Authorized Methods for Payload Control (TRAMPAC). This paper compares the quality assurance and quality control requirements specified in the WIPP WAC, QAPP, and TRAMPAC and discusses the potential to consolidate activities to comply with the TRU waste characterization and certification program requirements.« less
  • The 1990 Clean Air Act Amendments have required significant reductions in SO{sub 2} and NO{sub x} emissions from fossil fuel-fired power plants in the US. This paper examines some of the key technical lessons learned in Phase I following retrofit of low NO{sub x} systems, FGD systems, and continuous emissions monitors. Some of the key problems encountered have been waterwall wastage as a result of low NO{sub x} burner retrofits; high LOI (carbon) ash as a result of low NO{sub x} operation; high O&M costs associated with CEMs; and the heat rate discrepancy which has arisen between CEMs and conventionalmore » heat rate calculations. As Phase II approaches, EPRI and the electric utility industry are investigating improvements in FGD systems (e.g., clear liquor scrubbing), advances in NO{sub x} control technologies, more robust CEM systems, and tools to help in the technology decision-making process.« less
  • The conversion of the HHIRF facility to a Radioactive Ion Beam facility started in 1994. In this ISOL type facility the Cyclotron has been re-fitted as a driver providing high intensity proton beams which react with the target from which the radioactive products are extracted and then accelerated in the Tandem Electrostatic Accelerator to the desired energy for nuclear science studies. Facilities for nuclear physics experiments are at different stages of development: A Recoil Mass Spectrometer (RMS) with a complement of detectors at the focal plane and around the target is used primarily for nuclear structure studies. A large recoilmore » separator combining velocity and momentum selection, with its complement of focal plane detectors, will be dedicated to measurements relevant to nuclear astrophysics. The Enge Split Pole spectrograph is being re-fitted for operation in a gas filled mode, making it a more versatile tool for nuclear reaction studies. With the new experimental equipment being commissioned and the prospects of running experiments with low intensity radioactive beams a significant effort to develop equipment for beam diagnostics is underway. Some of the efforts and results in developing beam diagnostic tools will be described.« less
  • The electric power industry in the United States is moving towards a deregulated open market. The different regions of the country are passing through different phases of this transformation. Eventually, there would be integrated operation of transmission grid in each region, connecting generation facilities, electric utilities, bulk power supply customers and distribution companies; thus, resolving problems associated with multiple ownership of transmission lines. In the open market scenario, every segment of electric industry would become wide open to all market participants for competition. The increased competition would push electricity prices down and even out price discrepancies around the country. Themore » customers will have the option to choose their energy provider; like in telephone industry. This paper presents a detailed account of measures; the power companies can adopt to successfully face the challenges of the upcoming open market. The recommended measures can be summed up in the following categories: (1) Marketing strategies, (2) Business optimization, (3) Management of generation capacity, and (4) Transmission security. The issues and challenges facing the open market are also identified. The market participants can benefit from this paper in their preparation for the competitive marketplace.« less