skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Biological assessment of the advanced turbine design at Wanapum Dam, 2005

Technical Report ·
DOI:https://doi.org/10.2172/1218121· OSTI ID:1218121

Three studies were conducted to evaluate the biological performance of an advanced design turbine installed at Unit 8 of Wanapum Dam on the Columbia River in 2005 versus a conventional Kaplan turbine, Unit 9. The studies included an evaluation of blade-strike using deterministic and probabilistic models, integrated analysis of the response of the Sensor Fish to sever hydraulic events within the turbine system, and a novel dye technique to measure injury to juvenile salmonids in the field.

Research Organization:
EERE Publication and Product Library, Washington, D.C. (United States)
Sponsoring Organization:
USDOE Office of Energy Efficiency and Renewable Energy (EERE), Wind and Water Technologies Office (EE-4W)
OSTI ID:
1218121
Country of Publication:
United States
Language:
English

Similar Records

Biological Assessment of the Advanced Turbine Design at Wanapum Dam, 2005
Technical Report · Wed Sep 12 00:00:00 EDT 2007 · OSTI ID:1218121

Use of an Autonomous Sensor to Evaluate the Biological Performance of the Advanced Turbine at Wanapum Dam
Journal Article · Wed Oct 13 00:00:00 EDT 2010 · Journal of Renewable and Sustainable Energy, 2(5):053104 · OSTI ID:1218121

Use of an autonomous sensor to evaluate the biological performance of the advanced turbine at Wanapum Dam
Journal Article · Wed Oct 13 00:00:00 EDT 2010 · Journal of Renewable and Sustainable Energy · OSTI ID:1218121